These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal http://eia.met.gov.na.
The dates indicate the last date that it was/will be possible to comment on the project on the portal.
You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.
Explore your search results using the filter checkboxes, or amend your search or start a new search.
Construction of an eco-friendly low impact tourism and leisure facility on a 15ha plot in Ozondati Village, Ohungu Conservancy (Erongo Region).
Attachment | Size |
---|---|
2760_EIA_Quagga Camp and Leisure.pdf | 2 MB |
2760_EMP_Quagga Camp and Leisure.pdf | 295.61 KB |
2760_Support Letter_Quagga Camp and Leisure.pdf | 322.02 KB |
2760_Proof of Consultation_Quagga Camp and Leisure.pdf | 6.3 MB |
2760_Map_Quagga Camp and Leisure.pdf | 1.32 MB |
2760_Screening Notice_Quagga Camp and Leisure.pdf | 45.55 KB |
2760_CV_Quagga Camp and Leisure.pdf | 160.05 KB |
2760_BID_Quagga Camp and Leisure.pdf | 488.53 KB |
For the upgrading of an earth track already proclaimed as DR3417, from Andara Village to Shamaturu Village's clinic, via Mangamba Village. This is a 15km long road with a 30 meters wide road reserve, therefore total project footprint will be less than 50 hectares.
Renewal of the existing Environmental Clearance Certificate 2. Change of project name from Elephant Ridge Camp to Ondjamba Hills.
Attachment | Size |
---|---|
2047_EMP_Ondjamba Hills Camp in Erongo Region.pdf | 212.7 KB |
2047_ECC Old_Ondjamba Hills Camp in Erongo Region.pdf | 113.64 KB |
2047_Map_Ondjamba Hills Camp in Erongo Region.pdf | 188.68 KB |
2047_Screening Notice_Ondjamba Hills Camp in Erongo Region.pdf | 42.89 KB |
Renewal: Construction of a eco-friendly tourism tented camp.
ECC renewal for the construction of an eco-friendly lodge.
Attachment | Size |
---|---|
759_EMP_Damaraland Basalt Lodge in Kunene Region.pdf | 724.55 KB |
759_Map_Damaraland Basalt Lodge in Kunene Region.pdf | 280.19 KB |
759_Screening Notice_Damaraland Basalt Lodge in Kunene Region.pdf | 104.01 KB |
To allow for the upgrading of the 28km DR3662 to gravel standards. The road is already proclaimed.
Attachment | Size |
---|---|
720_ESIA_28km DR3662 to gravel standards.pdf | 1.85 MB |
720_ESMP_28km DR3662 to gravel standards.pdf | 608.03 KB |
720_Bidding Document_28km DR3662 to gravel standards.pdf | 1.37 MB |
720_Proof of Consultation_28km DR3662 to gravel standards.pdf | 524.71 KB |
720_Map_28km DR3662 to gravel standards.pdf | 392.71 KB |
720_Screening Notice_28km DR3662 to gravel standards.pdf | 87.29 KB |
Gravel road construction of DR3682 from Onaanda to Otamanzi (Omusati Region). This road is already a proclaimed road, since the 1990s.
Renewal of Environmental Clearance Certificate.
Attachment | Size |
---|---|
3406_EMP_Little Kulala Lodge.pdf | 1.1 MB |
3406_ECC_Little Kulala Lodge.pdf | 66.4 KB |
3406_Map_Little Kulala Lodge.pdf | 195.62 KB |
Renewal of Environmental Clearance Certificate.
Attachment | Size |
---|---|
3407_EMP_Desert Rhino Camp.pdf | 1.26 MB |
3407_ECC_Desert Rhino Camp.pdf | 63.19 KB |
3407_Map_Desert Rhino Camp.pdf | 319.62 KB |
Renewal of Environmental Clearance Certificate.
Attachment | Size |
---|---|
3408_EMP_Doro Nawas Camp.pdf | 1000.45 KB |
3408_ECC_Doro Nawas Camp.pdf | 65.61 KB |
3408_Map_Doro Nawas Camp.pdf | 209.66 KB |
Renewal of Environmental Clearance Certificate.
Attachment | Size |
---|---|
3409_EMP_Serra Cafema Lodge.pdf | 1.53 MB |
3409_ECC_Serra Cafema Lodge.pdf | 66.21 KB |
3409_Map_Serra Cafema Lodge.pdf | 708.67 KB |
Renewal of Environmental Clearance Certificate.
Attachment | Size |
---|---|
3410_EMP_Damaraland Adventure Camp.pdf | 1006.55 KB |
3410_ECC_Damaraland Adventure Camp.pdf | 64.87 KB |
3410_Map_Damaraland Adventure Camp.pdf | 165.61 KB |
Renewal of Environmental Clearance Certificate.
Attachment | Size |
---|---|
3404_EMP_Kulala Adventure Camp.pdf | 993 KB |
3404_ECC_Kulala Adventure Camp.pdf | 65.67 KB |
3404_Map_Kulala Adventure Camp.pdf | 135.75 KB |
Renewal of the Environmental Clearance certificate.
Attachment | Size |
---|---|
3403_EMP_Hoanib Skeleton Coast Camp.pdf | 1.27 MB |
3403_ECC Old_Hoanib Skeleton Coast Camp.PDF | 39.88 KB |
3403_Map_Hoanib Skeleton Coast Camp.pdf | 552.45 KB |
Environmental Clearance Certificate renewal.
Attachment | Size |
---|---|
3405_EMP_Kulala Desert Lodge.pdf | 1.28 MB |
3405_Map_Kulala Desert Lodge.pdf | 506.59 KB |
3405_ECC_Kulala Desert Lodge.pdf | 64.43 KB |
Road upgrading from a gravel road to a tar road (bitumen standards) The proposed project is located in the Kavango East Region in Northern Namibia. It involves the upgrading to bitumen standard of the District Road 3403 stretching from Divundu via Bagani and ending at Mohembo Border Post in the Kavango East Region in Northern Namibia. The District Road 3403 starts at the junction with TR8/4 in Divundu and follows a south easterly direction for 8km to Bagani. From Bagani the road follows a southerly direction towards the Mohembo border post between Namibia and Botswana.
The proposed road construction is a continuation of the DR3427 that starts in Tondoro Village along the B10 highway near Nkurenkuru. The initiation first phase construction was completed in 2015 from Tondoro to Mburu-Uru. This proposed construction aimed at completing the DR3427 construction from where the first phase ended in 2015. Thus the second phase seeks to complete the DR3427 from Mburu-Uru to Calikawo/Charlie Cutline/DR3446.
Attachment | Size |
---|---|
3188_EIASR_Construction to Gravel Standard DR3427.pdf | 1.45 MB |
3188_EMP_Construction to Gravel Standard DR3427.pdf | 1.52 MB |
3188_Map_Construction to Gravel Standard DR3427.pdf | 577.67 KB |
Renewal of existing ECC obtained 10 April 2017 Construction of a 2.5 MW PV Plant in Okongo Village
ECC to be attached to the application for Leasehold.
Attachment | Size |
---|---|
1318_EIA_Elephant Ridge Camp.pdf | 1.21 MB |
1318_EMP_Elephant Ridge Camp.pdf | 197.86 KB |
1318_Consent Letter_Elephant Ridge Camp.pdf | 25.02 KB |
1318_Public Meeting Agenda_Elephant Ridge Camp.pdf | 1.96 MB |
1318_Adverts_Elephant Ridge Camp.pdf | 3.31 MB |