Search results

EIA reports for public comment

These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal https://eia.meft.gov.na/.

The dates indicate the last date that it was/will be possible to comment on the project on the portal.

You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.

Explore your search results using the filter checkboxes, or amend your search or start a new search.

Displaying results 1 - 14 of 14
Monday, 17 February 2025
Urban Dynamics 2025. 250121005201: Renewal of Environmental Clearance Certificate (ECC No. 00421) for the proposed establishment of new townships on the Remainder of Portion 13 of the Farm Augeigas No. 34.
The ECC for the township establishments will cover the following key listed activities: Public Roads & Road Alignment (Section 10.2) Route Determination & Road Design (Section 10.1(b)) Construction of Canals & Channels (Section 8.4) Construction in Watercourses within Flood Lines (Section 8.8) Bulk Supply Pipelines (Oil, Gas, Water) (Section 10.1(a)) Electrical Cables and Infrastructure (Section 10.1(f)).
Monday, 7 November 2022
Urban Dynamics 2022. 221024000158: Amendment of conditions of establishment at Eheke settlement in the Oshana Region.

The amendment of conditions of establishment, the construction of a public road and the closing of public open space through statutory town planning procedures at Eheke settlement.

Tuesday, 1 November 2022
SLR Consulting 2022. 221017000128: Proposed three-dimensional (3D) seismic survey in Petroleum Exploration Licence 90 (PEL 90), Orange Basin, off the coast of southern Namibia.

3. MINING AND QUARRYING ACTIVITIES 3.2 The construction of facilities for any process or activities which requires a licence, right or other form of authorisation, and the renewal of a licence, right or other form of authorisation, in terms of the Minerals (Prospecting and Mining Act), 1992. 3.2 Other forms of mining or extraction of any natural resources whether regulated by law or not. 3.3 Resource extraction, manipulation, conservation and related activities. 3.4 The extraction or processing of gas from natural and non-natural resources.

Monday, 31 October 2022
SLR Consulting 2022. 221017000129: Renewal of Alten Solar Power Hardap (Pty) Ltd Environmental Clearance Certificate.

Original Application Activities that triggered EIA process (EMA Regulations 2012) Activity 1 (a) Energy Generation, Transmission and Storage The construction of facilities for the generation of electricity. The construction of three 10 MW PV facilities is proposed. Activity 1 (b) Energy Generation, Transmission and Storage The construction of facilities for the transmission and supply of electricity. The construction of PV facilities entails associated infrastructure, including transmission lines and a small onsite substation to connect to existing substations.

Monday, 31 October 2022
SLR Consulting 2022. 221014000087: Proposed meteorological mast and remote sensing campaign for the proposed Hyphen Hydrogen Energy Facility in the Tsau//Khaeb (Spergebiet) National Park, Namibia.

10.1 The construction of: (j) masts of any material or type and of any height, including those used for telecommunication broadcasting and radio transmission, but excluding - (i) flag poles, and (ii) lightening conductor poles. In November 2021, the Namibian government issued a notice of award stating its intention to appoint HYPHEN Hydrogen Energy (Hyphen) as the preferred bidder to develop the country’s first large-scale export green hydrogen (H2) project within in two concession areas (namely Springbok and Dolphin) in the Tsau//Khaeb National Park.

Sunday, 31 July 2022
Urban Dynamics 2022. APP-002578: Rezoning of land from "General Industrial" to "Undetermined" and simultaneously for the construction of public roads, infrastructure and activities in water courses within flood lines through township establishments at Karibib to be known as Usab Extensions.

Rezoning of land from "General Industrial" to "Undetermined" and simultaneously for the construction of public roads, infrastructure and activities in water courses within flood lines through township establishments at Karibib to be known as Usab Extensions.

Wednesday, 22 June 2022
SLR Consulting 2022. APP-003899: ECC renewal application for exploration well drilling in Block 2913B, Orange Basin, Namibia.

TotalEnergies EP Namibia B.V. ("TEEPNA") is applying to renew its ECC to continue with the previously assessed and approved activities, including appraisal well drilling in Block 2913B. TEEPNA and its partners hold an Exploration Right over Block 2913B.

Tuesday, 17 August 2021
Urban Dynamics 2021. APP-002764: Application for Environmental Clearance for the establishment and operation of Kubu and Kwena Self Catering Tented Lodge, in the Sikunga Conservancy, Kalimbeza Area, Zambezi Region.

The ECC is for the establishment and operation of a self-catering tent lodge in the Sikunga Conservancy.

Sunday, 9 May 2021
Urban Dynamics APP-002489: Environmental application for renewal of ECC for establishment of 3 Township Extensions 8, 11 and 12 in Okahao Townlands.

Construction of Infrastructure through Township Establishment at Okahao.

Wednesday, 10 March 2021
Urban Dynamics 2021. APP-002284: Scoping Report for the construction of public roads, infrastructure and construction of other activities in water courses and within flood lines through township establishments on Portion B of the remainder of Erf 1379, Oshakati in Oshana Region.

Environmental Clearance for, construction of public roads, infrastructure, and construction of other activities in watercourses within flood liens through Township Establishment. The Environmental Management Act (Act 7 of 2007), Section 8. Water Resource Developments; 8.8. Construction and other activities in watercourses within flood lines; 8.9. Construction and other activities within a catchment area; Section 10. Infrastructure: 10.1. The construction of- 10.1. (b) public roads; 10.2. Route determination of roads and design of associate physical infrastructure where- 10.2.

Wednesday, 30 December 2020
Urban Dynamics 2020. APP-002111: Scoping report for township establishment of Brukkaros Proper on Portion A of the remainder of Keetmanshoop Town and Townland No. 150 within the //Kharas Region.

For infrastructure development through township establishment and layout planning within potential flood areas.

Monday, 6 July 2020
SLR Consulting 2020. APP-001119: Amendment application - exploration well drilling in Petroleum Exploration Licence 39 (PEL 39).

The proposed amendments to the ECC (16 May 2018) and specifically to the Project Description in the EIA Report (SLR, 2017) covers the following items: Geographical Area; Number of Exploration Wells; Timing; and ECC Validity Period.

Thursday, 28 May 2020
SLR Consulting 2020. APP-001407: Environmental Performance Report and EMP.

For Groundwater Abstraction for industrial purposes.

Not found what you are looking for? Amend your search...