These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal http://eia.met.gov.na.
The dates indicate the last date that it was/will be possible to comment on the project on the portal.
You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.
Explore your search results using the filter checkboxes, or amend your search or start a new search.
Construction of an eco-friendly low impact tourism and leisure facility on a 15ha plot in Ozondati Village, Ohungu Conservancy (Erongo Region).
Attachment | Size |
---|---|
2760_EIA_Quagga Camp and Leisure.pdf | 2 MB |
2760_EMP_Quagga Camp and Leisure.pdf | 295.61 KB |
2760_Support Letter_Quagga Camp and Leisure.pdf | 322.02 KB |
2760_Proof of Consultation_Quagga Camp and Leisure.pdf | 6.3 MB |
2760_Map_Quagga Camp and Leisure.pdf | 1.32 MB |
2760_Screening Notice_Quagga Camp and Leisure.pdf | 45.55 KB |
2760_CV_Quagga Camp and Leisure.pdf | 160.05 KB |
2760_BID_Quagga Camp and Leisure.pdf | 488.53 KB |
For the upgrading of an earth track already proclaimed as DR3417, from Andara Village to Shamaturu Village's clinic, via Mangamba Village. This is a 15km long road with a 30 meters wide road reserve, therefore total project footprint will be less than 50 hectares.
Renewal of the existing Environmental Clearance Certificate 2. Change of project name from Elephant Ridge Camp to Ondjamba Hills.
Attachment | Size |
---|---|
2047_EMP_Ondjamba Hills Camp in Erongo Region.pdf | 212.7 KB |
2047_ECC Old_Ondjamba Hills Camp in Erongo Region.pdf | 113.64 KB |
2047_Map_Ondjamba Hills Camp in Erongo Region.pdf | 188.68 KB |
2047_Screening Notice_Ondjamba Hills Camp in Erongo Region.pdf | 42.89 KB |
Renewal: Construction of a eco-friendly tourism tented camp.
ECC renewal for the construction of an eco-friendly lodge.
Attachment | Size |
---|---|
759_EMP_Damaraland Basalt Lodge in Kunene Region.pdf | 724.55 KB |
759_Map_Damaraland Basalt Lodge in Kunene Region.pdf | 280.19 KB |
759_Screening Notice_Damaraland Basalt Lodge in Kunene Region.pdf | 104.01 KB |
To allow for the upgrading of the 28km DR3662 to gravel standards. The road is already proclaimed.
Attachment | Size |
---|---|
720_ESIA_28km DR3662 to gravel standards.pdf | 1.85 MB |
720_ESMP_28km DR3662 to gravel standards.pdf | 608.03 KB |
720_Bidding Document_28km DR3662 to gravel standards.pdf | 1.37 MB |
720_Proof of Consultation_28km DR3662 to gravel standards.pdf | 524.71 KB |
720_Map_28km DR3662 to gravel standards.pdf | 392.71 KB |
720_Screening Notice_28km DR3662 to gravel standards.pdf | 87.29 KB |
Gravel road construction of DR3682 from Onaanda to Otamanzi (Omusati Region). This road is already a proclaimed road, since the 1990s.
3. MINING AND QUARRYING ACTIVITIES 3.2 The construction of facilities for any process or activities which requires a licence, right or other form of authorisation, and the renewal of a licence, right or other form of authorisation, in terms of the Minerals (Prospecting and Mining Act), 1992. 3.2 Other forms of mining or extraction of any natural resources whether regulated by law or not. 3.3 Resource extraction, manipulation, conservation and related activities. 3.4 The extraction or processing of gas from natural and non-natural resources.
Original Application Activities that triggered EIA process (EMA Regulations 2012) Activity 1 (a) Energy Generation, Transmission and Storage The construction of facilities for the generation of electricity. The construction of three 10 MW PV facilities is proposed. Activity 1 (b) Energy Generation, Transmission and Storage The construction of facilities for the transmission and supply of electricity. The construction of PV facilities entails associated infrastructure, including transmission lines and a small onsite substation to connect to existing substations.
Attachment | Size |
---|---|
129_ESPA_Renewal of Alten Solar Power Hardap.pdf | 765.78 KB |
129_Map_Renewal of Alten Solar Power Hardap.pdf | 229.8 KB |
10.1 The construction of: (j) masts of any material or type and of any height, including those used for telecommunication broadcasting and radio transmission, but excluding - (i) flag poles, and (ii) lightening conductor poles. In November 2021, the Namibian government issued a notice of award stating its intention to appoint HYPHEN Hydrogen Energy (Hyphen) as the preferred bidder to develop the country’s first large-scale export green hydrogen (H2) project within in two concession areas (namely Springbok and Dolphin) in the Tsau//Khaeb National Park.
TotalEnergies EP Namibia B.V. ("TEEPNA") is applying to renew its ECC to continue with the previously assessed and approved activities, including appraisal well drilling in Block 2913B. TEEPNA and its partners hold an Exploration Right over Block 2913B.
Road upgrading from a gravel road to a tar road (bitumen standards) The proposed project is located in the Kavango East Region in Northern Namibia. It involves the upgrading to bitumen standard of the District Road 3403 stretching from Divundu via Bagani and ending at Mohembo Border Post in the Kavango East Region in Northern Namibia. The District Road 3403 starts at the junction with TR8/4 in Divundu and follows a south easterly direction for 8km to Bagani. From Bagani the road follows a southerly direction towards the Mohembo border post between Namibia and Botswana.
The proposed road construction is a continuation of the DR3427 that starts in Tondoro Village along the B10 highway near Nkurenkuru. The initiation first phase construction was completed in 2015 from Tondoro to Mburu-Uru. This proposed construction aimed at completing the DR3427 construction from where the first phase ended in 2015. Thus the second phase seeks to complete the DR3427 from Mburu-Uru to Calikawo/Charlie Cutline/DR3446.
Attachment | Size |
---|---|
3188_EIASR_Construction to Gravel Standard DR3427.pdf | 1.45 MB |
3188_EMP_Construction to Gravel Standard DR3427.pdf | 1.52 MB |
3188_Map_Construction to Gravel Standard DR3427.pdf | 577.67 KB |
Renewal of existing ECC obtained 10 April 2017 Construction of a 2.5 MW PV Plant in Okongo Village
The proposed amendments to the ECC (16 May 2018) and specifically to the Project Description in the EIA Report (SLR, 2017) covers the following items: Geographical Area; Number of Exploration Wells; Timing; and ECC Validity Period.
For Groundwater Abstraction for industrial purposes.
Attachment | Size |
---|---|
1407_NBL_Environmental Performance Report and EMP.pdf | 2.27 MB |
ECC to be attached to the application for Leasehold.
Attachment | Size |
---|---|
1318_EIA_Elephant Ridge Camp.pdf | 1.21 MB |
1318_EMP_Elephant Ridge Camp.pdf | 197.86 KB |
1318_Consent Letter_Elephant Ridge Camp.pdf | 25.02 KB |
1318_Public Meeting Agenda_Elephant Ridge Camp.pdf | 1.96 MB |
1318_Adverts_Elephant Ridge Camp.pdf | 3.31 MB |