Search results

EIA reports for public comment

These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal https://eia.meft.gov.na/.

The dates indicate the last date that it was/will be possible to comment on the project on the portal.

You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.

Explore your search results using the filter checkboxes, or amend your search or start a new search.

Displaying results 1 - 25 of 25
Thursday, 6 November 2025
Ritta Khiba Planning Consultants 2025. 241030004875: Rezoning of Portion A of Erf R/7349 Katutura Extension 17 into Portion A and the Remainder and subsequent rezoning of Portion A of Erf R/7349 Katutura Extension 17 from "Private Open Space" to "Business" with a bulk of 1 in Windhoek, Khomas Region.
Rezoning of Portion A of Erf R/7349 Katutura Extension 17 from private open space to business with a bulk f 1.
Monday, 23 June 2025
Ritta Khiba Planning Consultants 2025. 240827004600: Application for Environmental Clearance Certificate for subdivision of Erf 2031, Independence Avenue, Katutura into Portion A (±397m²) and the Remainder, and reservation of portion a as street, Khomas Region.
Due to the town planning and cadastral processes being applied for this year, the Municipal council letter dated 30/04/2024 states that the applicant obtains the Environmental Clearance Certificate from the Environmental Commissioner for the creation of the street, prior to the submission of the subdivision application to the Urban and Regional Planning Board.
Thursday, 24 October 2024
Ritta Khiba Planning Consultants 2024. 240712004286: Environmental Impact Assessment: the upgrading Soweto Street (0.59km) to low volume bituminous seal standard in Katima Mulilo, Zambezi Region, Namibia.
Environmental Impact Assessment; the upgrading Soweto Street (0.59km) to low volume bituminous seal standard in Katima Mulilo, Zambezi Region, Namibia.
Thursday, 24 October 2024
Ritta Khiba Planning Consultants 2024. 241004004773: Environmental Impact Assessment: upgrading of DR 3518 Sangwali road (2.8km) to low volume seal (lvs) standard in Sangwali, Zambezi Region, Namibia.
Environmental Impact Assessment: upgrading of DR 3518 Sangwali road (2.8km) to low volume seal (lvs) standard in Sangwali, Zambezi Region, Namibia.
Thursday, 24 October 2024
Ritta Khiba Planning Consultants 2024. 240805004510: Environmental Impact Assessment: the upgrading Sam Nujoma Street (4.55km) to low volume bituminous seal standard in Katima Mulilo, Zambezi Region, Namibia.
Environmental Impact Assessment: the upgrading Sam Nujoma Street (4.55km) to low volume bituminous seal standard in Katima Mulilo, Zambezi Region, Namibia.
Thursday, 24 October 2024
Ritta Khiba Planning Consultants 2024. 240805004511: Environmental Impact Assessment: upgrading Lechwe Street (1.84km) to low volume bitumenous seal standard in Katima Mulilo, Zambezi Region, Namibia.
Environmental Impact Assessment: upgrading Lechwe Street (1.84km) to low volume bitumenous seal standard in Katima Mulilo, Zambezi Region, Namibia.
Thursday, 24 October 2024
Ritta Khiba Planning Consultants 2024. 240805004512: Environmental Impact Assessment: upgrading Richard Muhinda Street (1km) to low volume bituminous seal standard in Katima Mulilo, Zambezi Region, Namibia.
Environmental Impact Assessment: upgrading Richard Muhinda Street (1km) to low volume bituminous seal standard in Katima Mulilo, Zambezi Region, Namibia.
Thursday, 24 October 2024
Ritta Khiba Planning Consultants 2024. 240805004513: Environmental Impact Assessment: the upgrading of the Mafuta Road (5.59 km) to low volume bituminous seal standard in Katima Mulilo, Zambezi Region, Namibia.
Environmental Impact Assessment: the upgrading of the Mafuta Road (5.59 km) to low volume bituminous seal standard in Katima Mulilo, Zambezi Region, Namibia.
Thursday, 24 October 2024
Ritta Khiba Planning Consultants 2024. 240712004281: Environmental Impact Assessment: upgrading T0807 road (1.56km) to low volume seal (lvs) standard in Katima Mulilo, Zambezi Region, Namibia.
Environmental Impact Assessment: upgrading T0807 road (1.56km) to low volume seal (lvs) standard in Katima Mulilo, Zambezi Region, Namibia.
Thursday, 24 October 2024
Ritta Khiba Planning Consultants 2024. 240805004514: Environmental Impact Assessment: the upgrading unnamed street (connects Hage Geingob St to Hospital Rd) (0.41km) to low volume bituminous seal standard in Katima Mulilo, Zambezi Region, Namibia.
Environmental Impact Assessment: the upgrading unnamed street (connects Hage Geingob St to Hospital Rd) (0.41km) to low volume bituminous seal standard in Katima Mulilo, Zambezi Region, Namibia.
Thursday, 24 October 2024
Ritta Khiba Planning Consultants 2024. 240712004278: Environmental Impact Assessment: upgrading Hage Geingob Road (2.2km) to low volume bitumenous seal standard in Katima Mulilo, Zambezi Region, Namibia.
Environmental Impact Assessment: upgrading Hage Geingob Road (2.2km) to low volume bitumenous seal standard in Katima Mulilo, Zambezi Region, Namibia.
Thursday, 24 October 2024
Ritta Khiba Planning Consultants 2024. 240805004515: Environmental Impact Assessment: upgrading of Chefuzwe road (8.54km) to low volume seal (LVS) standard.
Environmental Impact Assessment: upgrading of Chefuzwe road (8.54km) to low volume seal (LVS) standard.
Thursday, 7 September 2023
Ritta Khiba Planning Consultants 2023. 230622001597: The proposed construction of a 200MW (Megawatt) solar photovoltaic plant on a leasable area equal to 505HA in the Areva/Orano Mine Area, !Oe-#Gan Traditional Authority Jurisdiction Area, Usakos District, Daures Constituency, Erongo Region.

The proposed construction of a 200MW (Megawatt) solar photovoltaic plant on a leasable area equal to 505HA in the Areva/Orano Mine Area, !Oe-#Gan Traditional Authority Jurisdiction Area, Usakos District, Daures Constituency, Erongo Region.

Monday, 27 March 2023
Ritta Khiba Planning Consultants 2023. 230308001111: Proposed permanent closure and rezoning of Portion A of Erf R/901 Omulanga, Extension 2, from public open space to business, Otjozondjupa Region.

Proposed permanent closure and rezoning of Portion A of Erf R/901 Omulanga, Extension 2, from public open space to business, Otjozondjupa Region.

Monday, 23 January 2023
Ritta Khiba Planning Consultants 2023. 221118000378: Environmental Impact Assessment (EIA) for the proposed re-development of ERF 492 Divundu Extension 1 (From public open space to accommodate various business land uses) for Divundu Village Council, Kavango East Region, Namibia.

Divundu Village Council intends to do a redevelopment / rezoning of Erf 492, A public open space to a business erf. The Erf will be subdivided into five (5) Portions and the remainder to allow for the development of preferably a lodge, a private school, and various business.

Tuesday, 1 November 2022
SLR Consulting 2022. 221017000128: Proposed three-dimensional (3D) seismic survey in Petroleum Exploration Licence 90 (PEL 90), Orange Basin, off the coast of southern Namibia.

3. MINING AND QUARRYING ACTIVITIES 3.2 The construction of facilities for any process or activities which requires a licence, right or other form of authorisation, and the renewal of a licence, right or other form of authorisation, in terms of the Minerals (Prospecting and Mining Act), 1992. 3.2 Other forms of mining or extraction of any natural resources whether regulated by law or not. 3.3 Resource extraction, manipulation, conservation and related activities. 3.4 The extraction or processing of gas from natural and non-natural resources.

Monday, 31 October 2022
SLR Consulting 2022. 221017000129: Renewal of Alten Solar Power Hardap (Pty) Ltd Environmental Clearance Certificate.

Original Application Activities that triggered EIA process (EMA Regulations 2012) Activity 1 (a) Energy Generation, Transmission and Storage The construction of facilities for the generation of electricity. The construction of three 10 MW PV facilities is proposed. Activity 1 (b) Energy Generation, Transmission and Storage The construction of facilities for the transmission and supply of electricity. The construction of PV facilities entails associated infrastructure, including transmission lines and a small onsite substation to connect to existing substations.

Monday, 31 October 2022
SLR Consulting 2022. 221014000087: Proposed meteorological mast and remote sensing campaign for the proposed Hyphen Hydrogen Energy Facility in the Tsau//Khaeb (Spergebiet) National Park, Namibia.

10.1 The construction of: (j) masts of any material or type and of any height, including those used for telecommunication broadcasting and radio transmission, but excluding - (i) flag poles, and (ii) lightening conductor poles. In November 2021, the Namibian government issued a notice of award stating its intention to appoint HYPHEN Hydrogen Energy (Hyphen) as the preferred bidder to develop the country’s first large-scale export green hydrogen (H2) project within in two concession areas (namely Springbok and Dolphin) in the Tsau//Khaeb National Park.

Wednesday, 22 June 2022
Ritta Khiba Planning Consultants 2022. APP-003747: Environmental Impact Assessment for the proposed township establishment on Portion 23 of Grootfontein Town and Townlands No. 814/RE.

Renewal of expired Environmental Impact Assessment Certificate. The EIA was issued before but has in the meantime expired. This application is therefore being made for a renewal of the certificate for the Environmental impact assessment for the proposed township establishment on portion 23 of Grootfontein Town and Townlands No. 814/Remainder.

Wednesday, 22 June 2022
SLR Consulting 2022. APP-003899: ECC renewal application for exploration well drilling in Block 2913B, Orange Basin, Namibia.

TotalEnergies EP Namibia B.V. ("TEEPNA") is applying to renew its ECC to continue with the previously assessed and approved activities, including appraisal well drilling in Block 2913B. TEEPNA and its partners hold an Exploration Right over Block 2913B.

Friday, 26 March 2021
Ritta Khiba Planning Consultants 2021. APP-002399: Proposed Environmental Impact Assessment for the proposed township establishments on Portions 148 and 167 of the Farm Townlands of Gobabis No. 114, Gobabis, Omaheke Region.

The clients entered into a PPP agreement with the Gobabis Municipality to address the housing backlog by establishing two township respectively on the Townlands of Gobabis. As per the Environmental Management Act, this activity is subjected to an Environmental Impact Assessment. In order to finalise the township establishment process, the application need to be submitted to the Ministry of Urban and Rural Development and the Environmental Clearance Certificate is therefore needed for this process.

Monday, 6 July 2020
SLR Consulting 2020. APP-001119: Amendment application - exploration well drilling in Petroleum Exploration Licence 39 (PEL 39).

The proposed amendments to the ECC (16 May 2018) and specifically to the Project Description in the EIA Report (SLR, 2017) covers the following items: Geographical Area; Number of Exploration Wells; Timing; and ECC Validity Period.

Thursday, 28 May 2020
SLR Consulting 2020. APP-001407: Environmental Performance Report and EMP.

For Groundwater Abstraction for industrial purposes.

Tuesday, 19 May 2020
Ritta Khiba Planning Consultants 2020. APP-001299: For the formalisation of existing informal settlement area referred to as Portion 21 (Donkerhoek) Extension 3 of the remainder of Farm Gurus No. 150, Kalkrand.

Kalkrand Village Council is in the process of upgrading and promoting development in the Donker hoek settlement area of Farm Gurus No. 150 Kalkrand by formalising informal settlements and in so doing improve the economy of Kalkrand. Therefore, the proponent being Kalkrand Village Council approved the creation of Portion 21 (Donker Hoek), Extension 3 of the Remainder of Farm Gurus No. 150, Kalkrand measuring approximately (141, 757.68 m²) for use to formalise the existing informal settlement.