These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal http://eia.met.gov.na.
The dates indicate the last date that it was/will be possible to comment on the project on the portal.
You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.
Explore your search results using the filter checkboxes, or amend your search or start a new search.
Renewal of EC: tented safari camp in Nkasa Rupara National Park.
enewal of Environmental Clearance for a safari lodge.
Renewal of Environmental Clearance for a safari lodge.
Renewal of clearance for the lodge Anderssons at Ongava.
Renewal of Environmental Clearance for a safari lodge..
An existing eco-lodge, in operation since 1998. Activities: accommodation, meals and game drives.
Safari lodge on privately owned land: accommodation, meals, game drives to Etosha National Park.
Attachment | Size |
---|---|
2537_EMP_Mushara Bush Camp.pdf | 2.18 MB |
2537_Map_Mushara Bush Camp.pdf | 1.93 MB |
Safari lodge: accommodation, meals, game drives into Etosha National Park.
Attachment | Size |
---|---|
2538_EMP_Mushara Outpost.pdf | 1.83 MB |
2538_Map_Mushara Outpost.pdf | 2.08 MB |
Renewal of ECC for Shipwreck Lodge at the mouth of the Hoarusib River.
Attachment | Size |
---|---|
1110_EIA_Skeleton Coast Shipwreck Lodge.pdf | 1.65 MB |
1110_ECC_Skeleton Coast Shipwreck Lodge.pdf | 127.39 KB |
1110_Operator_Skeleton Coast Shipwreck Lodge.pdf | 5.71 MB |
The purpose of this application of the Environmental Clearance certificate for rezoning Atta Rental Portion 503 from residential area to restricted business of bulk 0.4. Such application includes the following activities 1. Re-zoning from residential to restricted business (Bulk 0.4) a) Mechanical work and handling of heavy and light vehicles. b) Charcoal storage & packaging c) Hydraulic engineering workshop 2. Construction of new access road (800m) 3. Refurbishment of septic tanks 4. Operation of workshop facility.
Attachment | Size |
---|---|
1187_EMP_Atta Rentals new portion 503.pdf | 1.68 MB |
1187_Supporting Doc_Atta Rentals new portion 503.pdf | 3.93 MB |