These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal http://eia.met.gov.na.
The dates indicate the last date that it was/will be possible to comment on the project on the portal.
You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.
Explore your search results using the filter checkboxes, or amend your search or start a new search.
Environmnetal Impact Assessment for the proposedd Opuwo Flexible Land Tenure Scheme (FLTS) - proposed informal settlements upgrading under the flexible land tenure system in Opuwo, Kunene Region, Namibia.
Proposed community school at Marula Conservation Park and associated infrastructure.
Creation of a 10m wide street.
Construction of a Service Station.
Creation of a Street on a portion of Portion 162 of the consolidated farm Okahandja Townlands No.277.
Development of the Shipapo Irrigation Project.
Environmental Clearance Certificate for the proposed construction and operation of Petra Flamingo Getaway Lodge CC at Liselo Area Zambezi Region Katima Mulilo.
Rezoning of Erf 1528 and 1530, Rundu Extension 5 from General Residential and Residential to Hospitality and the Consolidation of the aforementioned erven with Erf 1532, Rundu, Kavango East Region, Namibia.
Rezoning, subdivision, closure of public open space.
Subdivision, rezoning, creation of streets.
Rezoning.
The ECC is for the operations of Mariental Piggery. It's an already existing operation.
Attachment | Size |
---|---|
1846_EMP_Operation and Management of the Piggery Related activities in Mariental.pdf | 1.92 MB |
Subdivide a 3 ha. portion A and B into 1.5 ha. each. There will be no land use change.
Renewal of ECC Certificate