Search results

EIA reports for public comment

These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal https://eia.meft.gov.na/.

The dates indicate the last date that it was/will be possible to comment on the project on the portal.

You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.

Explore your search results using the filter checkboxes, or amend your search or start a new search.

Displaying results 1 - 9 of 9
Wednesday, 4 September 2024
Ouholamo Trading and Environmental Solution 2024. 240723004439: Environmental Impact Assessment for the proposed Okalago Piggery Establishment in Okanya Village, Omusati Region Namibia.
Activity 5.1 (d) Land Use and Development Activities Activity 7 Agriculture and Aquaculture Activities Activity 11 Other activities The ECC is for the Establishment of the Okalago Piggery to be established in Okanya Village, Omusati Region Namibia.
Tuesday, 1 November 2022
SLR Consulting 2022. 221017000128: Proposed three-dimensional (3D) seismic survey in Petroleum Exploration Licence 90 (PEL 90), Orange Basin, off the coast of southern Namibia.

3. MINING AND QUARRYING ACTIVITIES 3.2 The construction of facilities for any process or activities which requires a licence, right or other form of authorisation, and the renewal of a licence, right or other form of authorisation, in terms of the Minerals (Prospecting and Mining Act), 1992. 3.2 Other forms of mining or extraction of any natural resources whether regulated by law or not. 3.3 Resource extraction, manipulation, conservation and related activities. 3.4 The extraction or processing of gas from natural and non-natural resources.

Monday, 31 October 2022
SLR Consulting 2022. 221017000129: Renewal of Alten Solar Power Hardap (Pty) Ltd Environmental Clearance Certificate.

Original Application Activities that triggered EIA process (EMA Regulations 2012) Activity 1 (a) Energy Generation, Transmission and Storage The construction of facilities for the generation of electricity. The construction of three 10 MW PV facilities is proposed. Activity 1 (b) Energy Generation, Transmission and Storage The construction of facilities for the transmission and supply of electricity. The construction of PV facilities entails associated infrastructure, including transmission lines and a small onsite substation to connect to existing substations.

Monday, 31 October 2022
SLR Consulting 2022. 221014000087: Proposed meteorological mast and remote sensing campaign for the proposed Hyphen Hydrogen Energy Facility in the Tsau//Khaeb (Spergebiet) National Park, Namibia.

10.1 The construction of: (j) masts of any material or type and of any height, including those used for telecommunication broadcasting and radio transmission, but excluding - (i) flag poles, and (ii) lightening conductor poles. In November 2021, the Namibian government issued a notice of award stating its intention to appoint HYPHEN Hydrogen Energy (Hyphen) as the preferred bidder to develop the country’s first large-scale export green hydrogen (H2) project within in two concession areas (namely Springbok and Dolphin) in the Tsau//Khaeb National Park.

Wednesday, 26 October 2022
Ouholamo Trading and Environmental Solution 2022. 221010000033: Environmental Impact Assessment for the proposed subdivision of Erf 133 into Portion A and Remainder and permanent closure of Portion A as a public open space in Eenhana Town, Ohangwena Region.

The proposed development will entail the following activities: 1. Subdivision of Erf 133 which is a Public Open Space into Portion A and reminder 2. Permanent closure of Portion A as a Public Open Space the Public Consultation Meeting was done on the 25 July 2022.

Wednesday, 22 June 2022
SLR Consulting 2022. APP-003899: ECC renewal application for exploration well drilling in Block 2913B, Orange Basin, Namibia.

TotalEnergies EP Namibia B.V. ("TEEPNA") is applying to renew its ECC to continue with the previously assessed and approved activities, including appraisal well drilling in Block 2913B. TEEPNA and its partners hold an Exploration Right over Block 2913B.

Monday, 6 July 2020
SLR Consulting 2020. APP-001119: Amendment application - exploration well drilling in Petroleum Exploration Licence 39 (PEL 39).

The proposed amendments to the ECC (16 May 2018) and specifically to the Project Description in the EIA Report (SLR, 2017) covers the following items: Geographical Area; Number of Exploration Wells; Timing; and ECC Validity Period.

Thursday, 28 May 2020
SLR Consulting 2020. APP-001407: Environmental Performance Report and EMP.

For Groundwater Abstraction for industrial purposes.

Wednesday, 19 February 2020
Ouholamo Trading and Environmental Solution 2020. App-001059: Environmental Impact Assessment for the proposed incorporation and subdivision of portion 12 of the farm Okakarara Townlands No. 517, Okakakrara, Otjozondjupa Region.

The portion is to be used for the purpose of residential development and furthermore, there are six houses built on the portion to be incorporated in the development. The public participation meeting already conducted on the 18 October 2019.