These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal https://eia.meft.gov.na/.
The dates indicate the last date that it was/will be possible to comment on the project on the portal.
You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.
Explore your search results using the filter checkboxes, or amend your search or start a new search.
Construction of an eco-friendly low impact tourism and leisure facility on a 15ha plot in Ozondati Village, Ohungu Conservancy (Erongo Region).
| Attachment | Size |
|---|---|
| 2760_EIA_Quagga Camp and Leisure.pdf | 2 MB |
| 2760_EMP_Quagga Camp and Leisure.pdf | 295.61 KB |
| 2760_Support Letter_Quagga Camp and Leisure.pdf | 322.02 KB |
| 2760_Proof of Consultation_Quagga Camp and Leisure.pdf | 6.3 MB |
| 2760_Map_Quagga Camp and Leisure.pdf | 1.32 MB |
| 2760_Screening Notice_Quagga Camp and Leisure.pdf | 45.55 KB |
| 2760_CV_Quagga Camp and Leisure.pdf | 160.05 KB |
| 2760_BID_Quagga Camp and Leisure.pdf | 488.53 KB |
For the upgrading of an earth track already proclaimed as DR3417, from Andara Village to Shamaturu Village's clinic, via Mangamba Village. This is a 15km long road with a 30 meters wide road reserve, therefore total project footprint will be less than 50 hectares.
The reason for the ECC is for the permanent closure of Erven A-D of Erf 3571, Ondangwa Extension 16 and subsequent rezoning to "Residential" for the construction of 4 residential properties.
The reason for the ECC is for the permanent closure of Erf 326, Kaisosi as a "Public Open Space" and subsequent rezoning to "Residential" in order to formalize a residential property already constructed on Erf 326, Kaisosi.
The reason for the ECC is for the establishment of township on Portion 1 of Oshigambo Townlands No. 1117 to allow for the formalization of land uses, promotion of development and to bring services closer to the people as per the governmental objectives.
Renewal of the existing Environmental Clearance Certificate 2. Change of project name from Elephant Ridge Camp to Ondjamba Hills.
| Attachment | Size |
|---|---|
| 2047_EMP_Ondjamba Hills Camp in Erongo Region.pdf | 212.7 KB |
| 2047_ECC Old_Ondjamba Hills Camp in Erongo Region.pdf | 113.64 KB |
| 2047_Map_Ondjamba Hills Camp in Erongo Region.pdf | 188.68 KB |
| 2047_Screening Notice_Ondjamba Hills Camp in Erongo Region.pdf | 42.89 KB |
Renewal of the Environmental Clearance Certificate of the existing fuel retail facility on Erf 1159, Onethindi Extension 1, Oniipa Constituency, Oshikoto Region.
Renewal of an Environmental Clearance Certificate for the existing fuel retail facility at Onhuno, Helao Nafidi Town, Ohangwena Region.
Renewal: Construction of a eco-friendly tourism tented camp.
ECC renewal for the construction of an eco-friendly lodge.
| Attachment | Size |
|---|---|
| 759_EMP_Damaraland Basalt Lodge in Kunene Region.pdf | 724.55 KB |
| 759_Map_Damaraland Basalt Lodge in Kunene Region.pdf | 280.19 KB |
| 759_Screening Notice_Damaraland Basalt Lodge in Kunene Region.pdf | 104.01 KB |
To allow for the upgrading of the 28km DR3662 to gravel standards. The road is already proclaimed.
| Attachment | Size |
|---|---|
| 720_ESIA_28km DR3662 to gravel standards.pdf | 1.85 MB |
| 720_ESMP_28km DR3662 to gravel standards.pdf | 608.03 KB |
| 720_Bidding Document_28km DR3662 to gravel standards.pdf | 1.37 MB |
| 720_Proof of Consultation_28km DR3662 to gravel standards.pdf | 524.71 KB |
| 720_Map_28km DR3662 to gravel standards.pdf | 392.71 KB |
| 720_Screening Notice_28km DR3662 to gravel standards.pdf | 87.29 KB |
The ECC is for the rezoning of Erven 4753 and 5515, Rundu Extension 15 and 18 to allow for the formalization of existing small businesses that are located on the properties.
| Attachment | Size |
|---|---|
| 298_EMP_Rezoning of Erven 4753 and 5515_Rundu Extension 15 and 18.pdf | 550.97 KB |
| 298_Map_Rezoning of Erven 4753 and 5515_Rundu Extension 15 and 18.pdf | 362.77 KB |
Gravel road construction of DR3682 from Onaanda to Otamanzi (Omusati Region). This road is already a proclaimed road, since the 1990s.
Construction and Operation of a 10MW Solar Power Generation Plant on a 20Ha Portion of Oniipa Townlands.
Subdivision of Rundu Townlands and the creation of 1 street.
For the township establishment of Opuwo Extension 13 on the proposed Portion A of Opuwo Townlands No. 876 and associated infrastructure.
Closure of a portion of Erf 3059 (Street), Nomtsoub Extension 8 as a "Street" for consolidation and construction of a school.
The reason for the ECC is for the construction and operation of a fuel retail facility on Erf 38, Eheke Settlement, Ondangwa Rural Constituency, Oshana Region, Namibia.
For township establishment purposes.
Road upgrading from a gravel road to a tar road (bitumen standards) The proposed project is located in the Kavango East Region in Northern Namibia. It involves the upgrading to bitumen standard of the District Road 3403 stretching from Divundu via Bagani and ending at Mohembo Border Post in the Kavango East Region in Northern Namibia. The District Road 3403 starts at the junction with TR8/4 in Divundu and follows a south easterly direction for 8km to Bagani. From Bagani the road follows a southerly direction towards the Mohembo border post between Namibia and Botswana.
The proposed road construction is a continuation of the DR3427 that starts in Tondoro Village along the B10 highway near Nkurenkuru. The initiation first phase construction was completed in 2015 from Tondoro to Mburu-Uru. This proposed construction aimed at completing the DR3427 construction from where the first phase ended in 2015. Thus the second phase seeks to complete the DR3427 from Mburu-Uru to Calikawo/Charlie Cutline/DR3446.
| Attachment | Size |
|---|---|
| 3188_EIASR_Construction to Gravel Standard DR3427.pdf | 1.45 MB |
| 3188_EMP_Construction to Gravel Standard DR3427.pdf | 1.52 MB |
| 3188_Map_Construction to Gravel Standard DR3427.pdf | 577.67 KB |
The reason for the ECC is for the construction and operation of a fuel retail facility on Erf 1132, Ohangwena Extension 5 and its related services.
The purpose of the ECC is for rezoning of the land from residential to business to allow for the formalization of an already constructed and existing Guest house.
Closure of a Public Open Space.
Operation of a fuel retail facility on Erf 6260, Ondangwa Extension 22, opposite the Ondangwa Aiport, along the C46 Main Road to Ongwediva to cater for car rental businesses operating in and around the airport, the commuters using the airport, the travellers along the main road and the new business district to be created in the area.
Renewal of an existing Environmental Clearance Certificate.
Renewal of the Environmental Clearance Certificate for the Operation of a Fuel Retail Facility in Oshigambo Village, Oniipa Constituency, Oshikoto Region.
Renewal of existing ECC obtained 10 April 2017 Construction of a 2.5 MW PV Plant in Okongo Village
To close a portion of erf 912, Omuthiya Extension 3 as a public open space and subsequent rezoning, subdivision and consolidation to enable the Regional Government to formalise a house already constructed on the property.
For the township establishment of Onyuulaye Proper and Extension 1 in Onyuulaye Settlement in Oshikoto Region.
For the subdivision and the creation of a street.
The reason for the appliaction is to get ECC for the establishment of a Maize Milling Plant to add value to the Maize already being produced on Farm Irvington No. 744.
ECC to be attached to the application for Leasehold.
| Attachment | Size |
|---|---|
| 1318_EIA_Elephant Ridge Camp.pdf | 1.21 MB |
| 1318_EMP_Elephant Ridge Camp.pdf | 197.86 KB |
| 1318_Consent Letter_Elephant Ridge Camp.pdf | 25.02 KB |
| 1318_Public Meeting Agenda_Elephant Ridge Camp.pdf | 1.96 MB |
| 1318_Adverts_Elephant Ridge Camp.pdf | 3.31 MB |
Rezoning of the Remainder of Erf 87, Lafrenz from "Public Open Space" to "Government". 2. Closure of the Remainder of Erf 87, Lafrenz as a "Public Open Space".