These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal https://eia.meft.gov.na/.
The dates indicate the last date that it was/will be possible to comment on the project on the portal.
You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.
Explore your search results using the filter checkboxes, or amend your search or start a new search.
The reason for the ECC is for the permanent closure of Erven A-D of Erf 3571, Ondangwa Extension 16 and subsequent rezoning to "Residential" for the construction of 4 residential properties.
The reason for the ECC is for the permanent closure of Erf 326, Kaisosi as a "Public Open Space" and subsequent rezoning to "Residential" in order to formalize a residential property already constructed on Erf 326, Kaisosi.
The reason for the ECC is for the establishment of township on Portion 1 of Oshigambo Townlands No. 1117 to allow for the formalization of land uses, promotion of development and to bring services closer to the people as per the governmental objectives.
Renewal of the Environmental Clearance Certificate of the existing fuel retail facility on Erf 1159, Onethindi Extension 1, Oniipa Constituency, Oshikoto Region.
Renewal of an Environmental Clearance Certificate for the existing fuel retail facility at Onhuno, Helao Nafidi Town, Ohangwena Region.
The ECC is for the rezoning of Erven 4753 and 5515, Rundu Extension 15 and 18 to allow for the formalization of existing small businesses that are located on the properties.
| Attachment | Size | 
|---|---|
| 298_EMP_Rezoning of Erven 4753 and 5515_Rundu Extension 15 and 18.pdf | 550.97 KB | 
| 298_Map_Rezoning of Erven 4753 and 5515_Rundu Extension 15 and 18.pdf | 362.77 KB | 
3. MINING AND QUARRYING ACTIVITIES 3.2 The construction of facilities for any process or activities which requires a licence, right or other form of authorisation, and the renewal of a licence, right or other form of authorisation, in terms of the Minerals (Prospecting and Mining Act), 1992. 3.2 Other forms of mining or extraction of any natural resources whether regulated by law or not. 3.3 Resource extraction, manipulation, conservation and related activities. 3.4 The extraction or processing of gas from natural and non-natural resources.
Original Application Activities that triggered EIA process (EMA Regulations 2012) Activity 1 (a) Energy Generation, Transmission and Storage The construction of facilities for the generation of electricity. The construction of three 10 MW PV facilities is proposed. Activity 1 (b) Energy Generation, Transmission and Storage The construction of facilities for the transmission and supply of electricity. The construction of PV facilities entails associated infrastructure, including transmission lines and a small onsite substation to connect to existing substations.
| Attachment | Size | 
|---|---|
| 129_ESPA_Renewal of Alten Solar Power Hardap.pdf | 765.78 KB | 
| 129_Map_Renewal of Alten Solar Power Hardap.pdf | 229.8 KB | 
10.1 The construction of: (j) masts of any material or type and of any height, including those used for telecommunication broadcasting and radio transmission, but excluding - (i) flag poles, and (ii) lightening conductor poles. In November 2021, the Namibian government issued a notice of award stating its intention to appoint HYPHEN Hydrogen Energy (Hyphen) as the preferred bidder to develop the country’s first large-scale export green hydrogen (H2) project within in two concession areas (namely Springbok and Dolphin) in the Tsau//Khaeb National Park.
Construction and Operation of a 10MW Solar Power Generation Plant on a 20Ha Portion of Oniipa Townlands.
Subdivision of Rundu Townlands and the creation of 1 street.
For the township establishment of Opuwo Extension 13 on the proposed Portion A of Opuwo Townlands No. 876 and associated infrastructure.
Closure of a portion of Erf 3059 (Street), Nomtsoub Extension 8 as a "Street" for consolidation and construction of a school.
TotalEnergies EP Namibia B.V. ("TEEPNA") is applying to renew its ECC to continue with the previously assessed and approved activities, including appraisal well drilling in Block 2913B. TEEPNA and its partners hold an Exploration Right over Block 2913B.
The reason for the ECC is for the construction and operation of a fuel retail facility on Erf 38, Eheke Settlement, Ondangwa Rural Constituency, Oshana Region, Namibia.
For township establishment purposes.
The reason for the ECC is for the construction and operation of a fuel retail facility on Erf 1132, Ohangwena Extension 5 and its related services.
The purpose of the ECC is for rezoning of the land from residential to business to allow for the formalization of an already constructed and existing Guest house.
Closure of a Public Open Space.
Operation of a fuel retail facility on Erf 6260, Ondangwa Extension 22, opposite the Ondangwa Aiport, along the C46 Main Road to Ongwediva to cater for car rental businesses operating in and around the airport, the commuters using the airport, the travellers along the main road and the new business district to be created in the area.
Renewal of an existing Environmental Clearance Certificate.
Renewal of the Environmental Clearance Certificate for the Operation of a Fuel Retail Facility in Oshigambo Village, Oniipa Constituency, Oshikoto Region.
To close a portion of erf 912, Omuthiya Extension 3 as a public open space and subsequent rezoning, subdivision and consolidation to enable the Regional Government to formalise a house already constructed on the property.
For the township establishment of Onyuulaye Proper and Extension 1 in Onyuulaye Settlement in Oshikoto Region.
For the subdivision and the creation of a street.
The proposed amendments to the ECC (16 May 2018) and specifically to the Project Description in the EIA Report (SLR, 2017) covers the following items: Geographical Area; Number of Exploration Wells; Timing; and ECC Validity Period.
The reason for the appliaction is to get ECC for the establishment of a Maize Milling Plant to add value to the Maize already being produced on Farm Irvington No. 744.
For Groundwater Abstraction for industrial purposes.
| Attachment | Size | 
|---|---|
| 1407_NBL_Environmental Performance Report and EMP.pdf | 2.27 MB | 
Rezoning of the Remainder of Erf 87, Lafrenz from "Public Open Space" to "Government". 2. Closure of the Remainder of Erf 87, Lafrenz as a "Public Open Space".