Search results

EIA reports for public comment

These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal http://eia.met.gov.na.

The dates indicate the last date that it was/will be possible to comment on the project on the portal.

You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.

Explore your search results using the filter checkboxes, or amend your search or start a new search.

Displaying results 1 - 14 of 14
Tuesday, 5 November 2024
NamXperts Consultancy 2024. 241014004801: Upgrade and operation of Diclass Waste Oil Management CC. Erf 3423 W, Circumferential Road, Walvis Bay, Erongo Region.
DICLASS Waste Oil Management cc (the Proponent), under licenses issued by the Ministry of Mines and Energy, currently does collection, recycling and safe disposal of lubricating waste oils at Erf R3423 W, No.118, Circumferential Road. Walvis Bay, Erongo Region. DICLASS Waste Oil would like to upgrade and expand their operation at the same site, so they are able handle more than 30 m3 of used oil, which is a listed activity.
Friday, 16 February 2024
Trinity Environmental Solutions 2024. 240201002760: Quagga Camp and Leisure.

Construction of an eco-friendly low impact tourism and leisure facility on a 15ha plot in Ozondati Village, Ohungu Conservancy (Erongo Region).

Tuesday, 23 January 2024
Trinity Environmental Solutions 2024. 231219002620: Construction to Gravel Standard DR3417: Andara via Mangamba to Shamaturu (15km).

For the upgrading of an earth track already proclaimed as DR3417, from Andara Village to Shamaturu Village's clinic, via Mangamba Village. This is a 15km long road with a 30 meters wide road reserve, therefore total project footprint will be less than 50 hectares.

Friday, 8 September 2023
Trinity Environmental Solutions 2023. 230825002047: Renewal of ECC for operations and management Ondjamba Hills Camp in Erongo Region.

Renewal of the existing Environmental Clearance Certificate 2. Change of project name from Elephant Ridge Camp to Ondjamba Hills.

Tuesday, 7 February 2023
Trinity Environmental Solutions 2023. 230116000799: Operations and management of the Torra Tented Camp and Camp Site in Kunene Region.

Renewal: Construction of a eco-friendly tourism tented camp.

Monday, 23 January 2023
Trinity Environmental Solutions 2023. 230106000759: Renewal Environmental Clearance Certificate for the Damaraland Basalt Lodge in Kunene Region.

ECC renewal for the construction of an eco-friendly lodge.

Thursday, 5 January 2023
Trinity Environmental Solutions 2023. 221220000720: Construction to gravel standard DR3662.

To allow for the upgrading of the 28km DR3662 to gravel standards. The road is already proclaimed.

Tuesday, 8 November 2022
Trinity Environmental Solutions 2022. 221024000163: Environmental Impact Assessment (EIA) for the proposed construction to gravel standard of DR3662 (Tsandi via Eendombe to Iipanda) and DR3682 (Otamanzi to Onaanda) in Omusati Region.

Gravel road construction of DR3682 from Onaanda to Otamanzi (Omusati Region). This road is already a proclaimed road, since the 1990s.

Thursday, 2 December 2021
Trinity Environmental Solutions 2021. APP-003231: Upgrading to bitumen standards: DR 3403 Divundu - Bagani - Mohebo Border Post in Kavango East Region.

Road upgrading from a gravel road to a tar road (bitumen standards) The proposed project is located in the Kavango East Region in Northern Namibia. It involves the upgrading to bitumen standard of the District Road 3403 stretching from Divundu via Bagani and ending at Mohembo Border Post in the Kavango East Region in Northern Namibia. The District Road 3403 starts at the junction with TR8/4 in Divundu and follows a south easterly direction for 8km to Bagani. From Bagani the road follows a southerly direction towards the Mohembo border post between Namibia and Botswana.

Friday, 19 November 2021
Trinity Environmental Solutions 2021. APP-003188: Construction to Gravel Standard DR3427.

The proposed road construction is a continuation of the DR3427 that starts in Tondoro Village along the B10 highway near Nkurenkuru. The initiation first phase construction was completed in 2015 from Tondoro to Mburu-Uru. This proposed construction aimed at completing the DR3427 construction from where the first phase ended in 2015. Thus the second phase seeks to complete the DR3427 from Mburu-Uru to Calikawo/Charlie Cutline/DR3446.

Friday, 20 November 2020
Trinity Environmental Solutions 2020. APP-002011: Renewal of an Environmental Clearance Certificate for the construction of Okongo 2.75 MW PV Plant obtained 10 April 2017.

Renewal of existing ECC obtained 10 April 2017 Construction of a 2.5 MW PV Plant in Okongo Village

Wednesday, 29 April 2020
Trinity Environmental Solutions 2020. APP-001318: Elephant Ridge Camp.

ECC to be attached to the application for Leasehold.

Not found what you are looking for? Amend your search...