Search results

EIA reports for public comment

These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal http://eia.met.gov.na.

The dates indicate the last date that it was/will be possible to comment on the project on the portal.

You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.

Explore your search results using the filter checkboxes, or amend your search or start a new search.

Displaying results 1 - 9 of 9
Monday, 17 February 2025
Urban Dynamics 2025. 250121005201: Renewal of Environmental Clearance Certificate (ECC No. 00421) for the proposed establishment of new townships on the Remainder of Portion 13 of the Farm Augeigas No. 34.
The ECC for the township establishments will cover the following key listed activities: Public Roads & Road Alignment (Section 10.2) Route Determination & Road Design (Section 10.1(b)) Construction of Canals & Channels (Section 8.4) Construction in Watercourses within Flood Lines (Section 8.8) Bulk Supply Pipelines (Oil, Gas, Water) (Section 10.1(a)) Electrical Cables and Infrastructure (Section 10.1(f)).
Sunday, 18 December 2022
NamXperts 2022. 221202000565: Application for renewal of the Environmental Clearance Certificate for the Seaflower Whitefish Corporation Ltd.

Seaflower Whitefish Corporation LTD was previously issued with an Environmental Clearance Certificate which expired in September 2022. As a result, the ECC needs to be renewed, hence the undertaking of this exercise to audit and update the Environmental Management Plant and renew the ECC.

Monday, 7 November 2022
Urban Dynamics 2022. 221024000158: Amendment of conditions of establishment at Eheke settlement in the Oshana Region.

The amendment of conditions of establishment, the construction of a public road and the closing of public open space through statutory town planning procedures at Eheke settlement.

Sunday, 31 July 2022
Urban Dynamics 2022. APP-002578: Rezoning of land from "General Industrial" to "Undetermined" and simultaneously for the construction of public roads, infrastructure and activities in water courses within flood lines through township establishments at Karibib to be known as Usab Extensions.

Rezoning of land from "General Industrial" to "Undetermined" and simultaneously for the construction of public roads, infrastructure and activities in water courses within flood lines through township establishments at Karibib to be known as Usab Extensions.

Tuesday, 17 August 2021
Urban Dynamics 2021. APP-002764: Application for Environmental Clearance for the establishment and operation of Kubu and Kwena Self Catering Tented Lodge, in the Sikunga Conservancy, Kalimbeza Area, Zambezi Region.

The ECC is for the establishment and operation of a self-catering tent lodge in the Sikunga Conservancy.

Sunday, 9 May 2021
Urban Dynamics APP-002489: Environmental application for renewal of ECC for establishment of 3 Township Extensions 8, 11 and 12 in Okahao Townlands.

Construction of Infrastructure through Township Establishment at Okahao.

Wednesday, 10 March 2021
Urban Dynamics 2021. APP-002284: Scoping Report for the construction of public roads, infrastructure and construction of other activities in water courses and within flood lines through township establishments on Portion B of the remainder of Erf 1379, Oshakati in Oshana Region.

Environmental Clearance for, construction of public roads, infrastructure, and construction of other activities in watercourses within flood liens through Township Establishment. The Environmental Management Act (Act 7 of 2007), Section 8. Water Resource Developments; 8.8. Construction and other activities in watercourses within flood lines; 8.9. Construction and other activities within a catchment area; Section 10. Infrastructure: 10.1. The construction of- 10.1. (b) public roads; 10.2. Route determination of roads and design of associate physical infrastructure where- 10.2.

Wednesday, 30 December 2020
Urban Dynamics 2020. APP-002111: Scoping report for township establishment of Brukkaros Proper on Portion A of the remainder of Keetmanshoop Town and Townland No. 150 within the //Kharas Region.

For infrastructure development through township establishment and layout planning within potential flood areas.

Not found what you are looking for? Amend your search...