Marble tiles factory on Erf 8, Karibib.
Attachment | Size |
---|---|
1078_ESIA_Marble tiles factory on Erf 8_Karibib.pdf | 1.25 MB |
1078_EIA_Marble tiles factory on Erf 8_Karibib.pdf | 1.25 MB |
1078_ECC Old_Marble tiles factory on Erf 8_Karibib.pdf | 34.44 KB |
1078_Map_Marble tiles factory on Erf 8_Karibib.pdf | 408.05 KB |
Process for extract and process clay from the Exclusive Prospecting License Number 3903, Omdel area, Erongo Region.
3. MINING AND QUARRYING ACTIVITIES 3.2 The construction of facilities for any process or activities which requires a licence, right or other form of authorisation, and the renewal of a licence, right or other form of authorisation, in terms of the Minerals (Prospecting and Mining Act), 1992. 3.2 Other forms of mining or extraction of any natural resources whether regulated by law or not. 3.3 Resource extraction, manipulation, conservation and related activities. 3.4 The extraction or processing of gas from natural and non-natural resources.
Original Application Activities that triggered EIA process (EMA Regulations 2012) Activity 1 (a) Energy Generation, Transmission and Storage The construction of facilities for the generation of electricity. The construction of three 10 MW PV facilities is proposed. Activity 1 (b) Energy Generation, Transmission and Storage The construction of facilities for the transmission and supply of electricity. The construction of PV facilities entails associated infrastructure, including transmission lines and a small onsite substation to connect to existing substations.
Attachment | Size |
---|---|
129_ESPA_Renewal of Alten Solar Power Hardap.pdf | 765.78 KB |
129_Map_Renewal of Alten Solar Power Hardap.pdf | 229.8 KB |
10.1 The construction of: (j) masts of any material or type and of any height, including those used for telecommunication broadcasting and radio transmission, but excluding - (i) flag poles, and (ii) lightening conductor poles. In November 2021, the Namibian government issued a notice of award stating its intention to appoint HYPHEN Hydrogen Energy (Hyphen) as the preferred bidder to develop the country’s first large-scale export green hydrogen (H2) project within in two concession areas (namely Springbok and Dolphin) in the Tsau//Khaeb National Park.
TotalEnergies EP Namibia B.V. ("TEEPNA") is applying to renew its ECC to continue with the previously assessed and approved activities, including appraisal well drilling in Block 2913B. TEEPNA and its partners hold an Exploration Right over Block 2913B.
Operation of the Dreamland Marble Stones Mine 7km south of Karibib, Erongo Region.
For application of Exclusive Prospecting License Number 6443, Mining claim, 69857-69859, 70005-7009 Kaokoland, Kunene.
Extraction and processing clay material.
Establishment of a township for housing development.
Establishment of a township for the purpose of housing construction.
Subdivision of one Erf into more portions for residential erven.
Construction of a new main Sewerage Pump Station and Rising Main in Kuisebmond, Walvis Bay, Erongo Region, Namibia.
Namland Consultants was requested by Coca- Cola Bottling Company Namibia to perform an environmental condition survey on the consumer fuel installation of Coca-Cola Namibia in Windhoek. The environmental assessment is conducted to determine all environmental, safety, health and socioeconomic impacts associated with the operations of the facility. Relevant environmental data has been compiled by making use of secondary data and from a reconnaissance site visit. Potential environmental impacts and associated social impacts were identified and are addressed in this report.
Proposed establishment and layout approval on Portion B of the remainder of the Farm Nkurenkuru Townlands No. 1346 comprising of 312 erven and remainder to be known as Nkurenkuru Extension 6 and 7, Nkurenkuru, Kavango West Region, Namibia.
The proposed amendments to the ECC (16 May 2018) and specifically to the Project Description in the EIA Report (SLR, 2017) covers the following items: Geographical Area; Number of Exploration Wells; Timing; and ECC Validity Period.
For Groundwater Abstraction for industrial purposes.
Attachment | Size |
---|---|
1407_NBL_Environmental Performance Report and EMP.pdf | 2.27 MB |