These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal https://eia.meft.gov.na/.
The dates indicate the last date that it was/will be possible to comment on the project on the portal.
You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.
Explore your search results using the filter checkboxes, or amend your search or start a new search.
The Namibia Water Corporation (NamWater) Ltd, hereinafter referred to as the Proponent, supplies water to the Aroab village through the Aroab bulk water supply scheme. According to the assessment of water supply to the Aroab bulk water supply scheme in 2020, the current water supply to Aroab Village Council does not meet the demand. Moreover, the existing collector reservoir and most of the existing pipelines are in a deteriorated state and need replacement.
Continuation of the Grünau Water Supply Scheme and Maintenance of Infrastructure.
The application is for a renewal of an existing ECC issued in 2019, ECC 00305.
The application is for a renewal of an existing ECC issued in 2019, ECC 00344.
The application is for a renewal of an existing ECC issued in 2019, ECC 00306.
The application is for a renewal of an existing ECC issued in 2019.
| Attachment | Size |
|---|---|
| 246_EMP_Koes Water Supply Scheme_Karas Region.pdf | 689.07 KB |
| 246_Map_Koes Water Supply Scheme_Karas Region.pdf | 444.86 KB |
The application is for a renewal of an existing ECC issued in 2019.
| Attachment | Size |
|---|---|
| 247_EMP_Divundu Bulk Water Supply Scheme_Kavango East Region.pdf | 745.16 KB |
| 247_Map_Divundu Bulk Water Supply Scheme_Kavango East Region.pdf | 434.4 KB |
The application is for a renewal of an existing ECC issued in 2019.
| Attachment | Size |
|---|---|
| 245_EMP_Ais_Ais Water Supply Scheme_Karas Region.pdf | 689.07 KB |
| 245_Map_Ais_Ais Water Supply Scheme_Karas Region.pdf | 422.72 KB |
The application is a renewal for an existing ECC issued for the Katji-Na-Katji Interim Solution Project in 2019.
The ECC is a renewal for an existing ECC issued for the Water Supply Pipeline Between Kombat Mine and NamWater Reservoir Project in 2019.
The application is for a renewal of an existing ECC issued in 2019.
The application is for a renewal of an existing ECC issued in 2019.
The application is for a renewal of an existing ECC issued in 2019.
The application is for a renewal of an existing ECC issued in 2019.
The ECC application is for a renewal of an ECC for an existing water supply scheme in Aussenkehr.
| Attachment | Size |
|---|---|
| 3584_EMP_Aussenkehr Water Supply Scheme.pdf | 625.6 KB |
| 3584_ECC_Aussenkehr Water Supply Scheme.pdf | 82.49 KB |
| 3584_Map_Aussenkehr Water Supply Scheme.pdf | 425.8 KB |