Friday, 25 July 2025
Urban Dynamics Africa 2025. 250212005357: Renewal of Environmental Clearance Certificate (ECC) app 2578 for the construction of public roads, infrastructure, and activities within watercourses and flood lines as part of the Township Establishment at Karibib.The ECC is for constructing public roads, infrastructure, and activities within watercourses and flood lines through township establishment. This project falls under the listed activities outlined in Namibia's Environmental Impact Assessment (EIA) Regulations, which are part of the Environmental Management Act (EMA) No. 7 of 2007.
Monday, 23 June 2025
Urban Dynamics Africa 2025. 250507005779: Renewal of ECC (ECC No. 00203) for construction activities within Water Course Flood Line on the Reminder of Erf 3526, Extension 7, Katima Mulilo, Zambezi Region.The renewal of the expired Environmental Clearance Certificate (ECC No. 00203). The establishment of new townships, including the construction of roads and supporting infrastructure. Compliance with Namibiaโs Environmental Management Act and associated regulations The ECC for the township establishment covers the following key activities under the Environmental Management Act: Public Roads and Road Alignment (Section 10.2). Route Determination & Road Design (Section 10.1(b)). Construction of Canals and Channels (Section 8.4).
Thursday, 2 January 2025
Urban Dynamics Africa 2025. 241004004776: Operational Environmental Management Plan for the existing Le Mirage Resort and Spa in Hardap Region.TOURISM DEVELOPMENT ACTIVITIES 6. The construction of resorts, lodges, hotels or other tourism and hospitality facilities. OTHER ACTIVITIES 11.2 Construction of cemeteries, camping, leisure and recreation sites.
Thursday, 2 January 2025
Urban Dynamics Africa 2025. 241004004777: Operational Environmental Management Plan for the existing Divava Okavango Lodge and Spa, within Kavango East, Namibia.TOURISM DEVELOPMENT ACTIVITIES 6. The construction of resorts, lodges, hotels or other tourism and hospitality facilities. OTHER ACTIVITIES 11.2 Construction of cemeteries, camping, leisure and recreation sites.
Wednesday, 25 September 2024
Urban Dynamics Africa 2024. 240906004662: Renewal of ECC 10552 alignment and construction of public roads and the construction of infrastructure through township establishments within Ozondje, Omaruru in the Erongo Region.The ECC is for the alignment and construction of public roads and the construction of infrastructure. - 21.447830 S, 15.940865 E.
Tuesday, 9 July 2024
Urban Dynamics Africa 2024. 231018002335: Construction of public roads through the subdivision of Erven 1134 and 1135 Eenhana Extension 2 within the Ohangwena Region.The ECC is for the construction of public roads and associated physical infrastructure through the subdivision of Erven 1134 and 1135 Eenhana Extension 2.
Tuesday, 9 July 2024
Urban Dynamics Africa 2024. 240405003147: Township establishment on Portion A of Sangwali Townlands, Sangwali, Zambezi Region.For the development of cemeteries, camping grounds, leisure and recreation sites, public road construction, as well as waste management facilities, encompassing waste treatment and disposal procedures.
Friday, 24 May 2024
Urban Dynamics Africa 2024. 240422003397: Township Establishment of Brukharos Proper on Portion A of the Remainder of Keetmanshoop Town and Townlands No. 150 within the //Kharas Region.Renewal of Environmental Clearance Certificate (ECC) 01328 for Public Road Infrastructure Development and Associated Activities in Water Resource Areas.
Friday, 24 May 2024
Urban Dynamics Africa 2024. 240422003404: Proposed townships establishment on Portion B of the Remainder of Farm Opuwo Townlands No. 1115 and Portion Y and Portion X of the Remainder of Opuwo Townlands No 876.Renewal of Environmental Clearance Certificate (ECC) 03108 for Public Road Infrastructure Development and Associated Activities in Water Resource Areas.
Tuesday, 21 May 2024
Urban Dynamics Africa 2024. 240501003526: Renewal of the Environmental Clearance Certificate for Kubu and Kwena self-catering tented lodge near Katima Mulilo in the Zambezi Region ( ECC 01714).The ECC renewal is necessary for Kubu and Kwena Lodge near Katima Mulilo in the Zambezi Region. It includes activities within watercourses and flood lines, as well as the operations of tourism facilities like resorts.
Monday, 18 March 2024
Urban Dynamics Africa 2024. 231018002333: Township establishment at Eenhana (to be known as Oukango Proper) within the Ohangwena Region.The ECC is for the allincement and construction of public roads, domestic wastewater-related pipeline systems, and land reclamation from below or above the high water mark of associated land through township establishment.
Friday, 13 October 2023
Urban Dynamics Africa 2023. 230623001600: Right-of-way servitude over the Remainder of Farm Divundu Townlands No. 1362 within the Kavango East Region.A 10m right-of-way servitude over the Remainder of Farm Divundu Townlands No. 1362.
Wednesday, 4 October 2023
Urban Dynamics Africa 2023. 230818001900: The closure and realignment of Erf 2284, Nomtsoub Extension 1 (Street); and the closer and realignment of Erf 2278, Nomtsoub Extension 1 (Public Open Space) through the consolidation and subdivision of various erven in Nomtsoub Extension 1, Tsumeb.The closure, realignment and construction of a public road and the closure and realignment of a public open space.
Monday, 25 September 2023
Urban Dynamics Africa 2023. 230210000978: Township establishment on Erf 1373 (currently known as Oneshila informal settlement), Oshakati Townlands, Oshana Region.Renewal of Environmental Clearance Certificate for the township establishment on Erf 1373 (currently known as Oneshila informal settlement), Oshakati Townlands, Oshana Region.
Friday, 22 September 2023
Namib Enviro Consultants 2023. 230612001565: Environmental Clearance Certificate for proposed mining exploration on Mining Claim No: 7666, Otavi District, Otjozondjupa Region.
Monday, 11 September 2023
Urban Dynamics Africa 2023. 230630001644: Township establishment on Portion A of the Remainder of Farm Okahao Extension No.1213 (to be known as Kashenda Extension 3), in the Omusati Region.Construction of infrastructure and development within floodlines through township establishment on Portion A of the Remainder of Farm Okahao Extension No.1213 (to be known as Kashenda Extension 3) in the Omusati Region.
Thursday, 31 August 2023
Urban Dynamics Africa 2023. 230224001037: Township Establishment on Portions 17 and 18 within remainder of Farm Okakarara Townlands No. 517, Omaheke Region.Infrastructure development through township establishments.
Monday, 30 January 2023
Urban Dynamics Africa 2023. 230116000793: Charcoal storage and packing facility on Portion 149 (Randte) within Outjo Town and Townlands No. 193.Renewal of the Environmental Clearance Certificate (ECC)and transfer of the ECC to Corridor Logistic (Pty) Ltd. Unifood Charcoal.
Tuesday, 24 January 2023
Urban Dynamics Africa 2023. 221123000403: Amendment of erven in Okalongo Proper, Extensions 1 and 2 Okalongo through the closure of public open spaces and public streets within the Omusati Region.Amendment of the title of the certificate already issued for the Amendment of erven in Okalongo Proper, Extensions 1 and 2 Okalongo through the closure of public open spaces and public streets within the Omusati Region.
Tuesday, 24 January 2023
Urban Dynamics Africa 2023. 221101000236: Township establishment at Onawa (to be known as Onawa Proper), in Oshana Region.For the construction of public roads, infrastructure and activities in watercourses within flood lines through township establishments.
Friday, 23 December 2022
Namib Enviro Consultants 2022. 221019000138: Proposed installation and operation of an above ground diesel storage tank on a commercial farm number 1032 B, Otjozondjupa Region.Proposed installation and operation of an above ground diesel storage tank on a commercial farm number 1032 B, Otjozondjupa Region.
Friday, 23 December 2022
Namib Enviro Consultants 2022. 221123000416: Exploration activities on EPL 8205 Kunene Region.Environmental Impact Assessment for mineral exploration activitieis on EPL 8205 in the Skeleton Coast Park, Kunene Region.
Wednesday, 7 December 2022
Namib Enviro Consultants 2022. 221111000303: Environemental Clearance Certificate for mining exploration activities on EPL No. 8777 in Henties Bay, Erongo Region.Environemental Clearance Certificate for mining exploration activities on EPL No. 8777 in Henties Bay, Erongo Region.
Wednesday, 10 August 2022
Urban Dynamics Africa 2022. APP-003518: Application for Environmental Clearance Certificate for the construction of public roads, infrastructure and activities in watercourses within flood lines through township establishments at Onawa, Oshakati.Application for Environmental Clearance Certificate for the construction of public roads, infrastructure and activities in watercourses within flood lines through township establishments at Onawa, Oshakati.
Wednesday, 6 July 2022
Namib Enviro Consultants 2022. APP-0010339: Construction and operations of a filling station at Ohangwena Region (Omtwe Womnhu) Oshikunde.ECC for construction and operations of a filling station at Ohangwena Region (Omtwe Womnhu) Oshikunde.
Monday, 4 July 2022
Namib Enviro Consultants 2022. APP-003305: Installation and operation of an above ground tank (diesel) at Omahi Village (Okakarara) 90 to Okondjoto in a settlement area, Otjozondjupa Region.ECC for installation and operation of an above ground tank (diesel) at Omahi Village (Okakarara) 90 to Okondjoto in a settlement area, Road No. 3803.
Tuesday, 28 June 2022
Namib Enviro Consultants 2022. APP-003900: Gravity Mining CC proposes to practice exploration activities on EPL No. 8375 in Kunene Region.ECC for exploration activities on EPL No. 8375 in Kunene Region.
Monday, 27 June 2022
Namib Enviro Consultants 2022. APP-003902: Exploration activities on EPL No. 8205 Kunene Region.ECC for proposed exploration activities by KMB Enterprises CC on EPL No. 8205.
Monday, 27 June 2022
Namib Enviro Consultants 2022. APP-003901: Exploration activities on EPL 8496 Erongo Region.ECC For exploration activities on EPL 8496 Erongo Region.
Thursday, 11 November 2021
Namib Enviro Consultants 2021. APP-003113: Environmental Impact Assessment for proposed mining activities on Mining Claims (MC) 71975 and 71974 by Tala Mining CC in Arandis, Erongo Region.Environmental Impact Assessment for proposed mining activities on Mining Claims (MC) 71975 and 71974 by Tala Mining CC in Arandis, Erongo Region.
Wednesday, 3 November 2021
Namib Enviro Consultants 2021. APP-002943: Environmental Impact Assessment for proposed mining/quarrying activities on Mining Claims (MC) 71973 by Tala Mining CC in Arandis, Erongo Region.Environmental Impact Assessment for proposed mining/quarrying activities on Mining Claims (MC) 71973 by Tala Mining CC in Arandis, Erongo Region.
Thursday, 24 June 2021
Urban Dynamics Africa APP-002716: Proposed establishment of Ongha Townlands, Ohangwena Region.Renewal of the ECC for the proposed establishment of Ongha Townlands, Ohangwena Region.
Wednesday, 16 June 2021
Urban Dynamics Africa 2021. APP-002667: Alignment and construction of public roads and infrastructure through Township Establishment at Ozondje (Extension 6 - 11), in Omaruru within the Erongo Region.Re-application for the alignment, construction of public roads and infrastructure through Township Establishment.
Monday, 8 March 2021
Urban Dynamics Africa 2021. APP-001111: Activities within a watercourse flood line and the closure of a public open space, as a result of the construction/upgrading of the MR120 (Okatana - Endola - Onuno) to bitumen standards.For the construction of a public road, construction, and other activities within a watercourse flood line and the closure of a public open space.
Thursday, 25 February 2021
Urban Dynamics Africa 2021. APP-002110: Scoping report for the establishment of townships on Portion B of the remainder of Farm Opuwo Townlands No. 115 and Portion Y of the remainder of Opuwo Townlands No. 876.For the establishment of two new townships and for the construction of infrastructure through township establishments.
Thursday, 13 August 2020
Urban Dynamics Africa 2020. APP-001063: Construction and operations of water-based paint manufacturing plant on Erf 2, Nubu Industrial Park, Windhoek-Khomas Region.