Title of Activity: Mining operation for base and rare metals on mining claims on 71081, 71082, 71083, 71436, 71437, 71438, and 71439 Nature of Activity: Mining and Quarrying Location of Activity: Farm Mesopotamia No. 54, Mesopotamia Village, Khorixas District, Kunene Region Scale and Scope of Activity: Area envisaged for the operations involves 1,155, 600 square meters of combined seven (7) mining claims.
Waste management, handling and treatment and disposal at Liselo site.
I issue this clearance with the following conditions: (1) No discharge of effluent waste in water. (2) Kasika / Impalila conservancy should be involved in the disposal of effluent waste, and log sheet must be complete by both parties. (3) Key biodiversity habitats must be protected.
I issue this clearance with the following conditions. (1) No discharge of effluent waste in the water. (2) Kasika/ Impalila Conservancy should be involved in the disposal of effluent waste, and log sheets must be completed by both parties involved.
| Attachment | Size |
|---|---|
| 1778_SR and EMP_Zambezi Queen Houseboat Impalila Island.pdf | 809.13 KB |
| 1778_ECC Old_Zambezi Queen Houseboat Impalila Island.pdf | 281.02 KB |
| 1778_Map_Zambezi Queen Houseboat Impalila Island.pdf | 233.58 KB |
| 1778_Screening Notice_Zambezi Queen Houseboat Impalila Island.pdf | 35.12 KB |
I issue this clearance with the following conditions: (1) No discharge of effluent waste in water. (2) Kasika / Impalila conservancy should be involved in the disposal of effluent waste, and log sheet must be complete by both parties. (3) Key biodiversity habitats must be protected.
I issue this clearance with the following conditions: (1) No discharge of effluent waste in the water (2) Kasika / Impalila conservancy should be involved in the disposal or effluent waste, and log sheet must be completed by both parties involved. (3) Key biodiversity habitats must be protected.
I issue this clearance with the following conditions. (1) No discharge of effluent waste in the water (2) Key biodiversity habitats must be protected.
Planning and Design, Construction, Operation and Decommission of the Oshakati Water Purification Plant Extensions, involving the following activities; 1.1 Site Clearance, Earthworks and Construction of a New Water Treatment Plant 1.2 Site Clearance, Earthworks, and construction for the Expansion of the existing Raw Water Storage Dam and modocation of the raw water pump station 1.3 Site Clearance, Earthworks and Construction of Sludge Ponds 1.4 Earthworks and Laying of Linear Infrastructure Inclusive of Roads, Pipelines and Electrical Cables 1.5 Handling, Storage and Potential Disposal of Ha
3. MINING AND QUARRYING ACTIVITIES 3.2 The construction of facilities for any process or activities which requires a licence, right or other form of authorisation, and the renewal of a licence, right or other form of authorisation, in terms of the Minerals (Prospecting and Mining Act), 1992. 3.2 Other forms of mining or extraction of any natural resources whether regulated by law or not. 3.3 Resource extraction, manipulation, conservation and related activities. 3.4 The extraction or processing of gas from natural and non-natural resources.
Original Application Activities that triggered EIA process (EMA Regulations 2012) Activity 1 (a) Energy Generation, Transmission and Storage The construction of facilities for the generation of electricity. The construction of three 10 MW PV facilities is proposed. Activity 1 (b) Energy Generation, Transmission and Storage The construction of facilities for the transmission and supply of electricity. The construction of PV facilities entails associated infrastructure, including transmission lines and a small onsite substation to connect to existing substations.
| Attachment | Size |
|---|---|
| 129_ESPA_Renewal of Alten Solar Power Hardap.pdf | 765.78 KB |
| 129_Map_Renewal of Alten Solar Power Hardap.pdf | 229.8 KB |
10.1 The construction of: (j) masts of any material or type and of any height, including those used for telecommunication broadcasting and radio transmission, but excluding - (i) flag poles, and (ii) lightening conductor poles. In November 2021, the Namibian government issued a notice of award stating its intention to appoint HYPHEN Hydrogen Energy (Hyphen) as the preferred bidder to develop the country’s first large-scale export green hydrogen (H2) project within in two concession areas (namely Springbok and Dolphin) in the Tsau//Khaeb National Park.
TotalEnergies EP Namibia B.V. ("TEEPNA") is applying to renew its ECC to continue with the previously assessed and approved activities, including appraisal well drilling in Block 2913B. TEEPNA and its partners hold an Exploration Right over Block 2913B.
Establishment and operation of a dumping site at Liselo area in Zambezi region.
The proposed amendments to the ECC (16 May 2018) and specifically to the Project Description in the EIA Report (SLR, 2017) covers the following items: Geographical Area; Number of Exploration Wells; Timing; and ECC Validity Period.
For Groundwater Abstraction for industrial purposes.