These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal http://eia.met.gov.na.
The dates indicate the last date that it was/will be possible to comment on the project on the portal.
You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.
Explore your search results using the filter checkboxes, or amend your search or start a new search.
Waste management, handling and treatment and disposal at Liselo site.
Title of Activity: Mining operation for base and rare metals on mining claims on 71081, 71082, 71083, 71436, 71437, 71438, and 71439 Nature of Activity: Mining and Quarrying Location of Activity: Farm Mesopotamia No. 54, Mesopotamia Village, Khorixas District, Kunene Region Scale and Scope of Activity: Area envisaged for the operations involves 1,155, 600 square meters of combined seven (7) mining claims.
I issue this clearance with the following conditions: (1) No discharge of effluent waste in water. (2) Kasika / Impalila conservancy should be involved in the disposal of effluent waste, and log sheet must be complete by both parties. (3) Key biodiversity habitats must be protected.
I issue this clearance with the following conditions. (1) No discharge of effluent waste in the water. (2) Kasika/ Impalila Conservancy should be involved in the disposal of effluent waste, and log sheets must be completed by both parties involved.
Attachment | Size |
---|---|
1778_SR and EMP_Zambezi Queen Houseboat Impalila Island.pdf | 809.13 KB |
1778_ECC Old_Zambezi Queen Houseboat Impalila Island.pdf | 281.02 KB |
1778_Map_Zambezi Queen Houseboat Impalila Island.pdf | 233.58 KB |
1778_Screening Notice_Zambezi Queen Houseboat Impalila Island.pdf | 35.12 KB |
I issue this clearance with the following conditions: (1) No discharge of effluent waste in water. (2) Kasika / Impalila conservancy should be involved in the disposal of effluent waste, and log sheet must be complete by both parties. (3) Key biodiversity habitats must be protected.
I issue this clearance with the following conditions. (1) No discharge of effluent waste in the water (2) Key biodiversity habitats must be protected.
I issue this clearance with the following conditions: (1) No discharge of effluent waste in the water (2) Kasika / Impalila conservancy should be involved in the disposal or effluent waste, and log sheet must be completed by both parties involved. (3) Key biodiversity habitats must be protected.
Recycling of Solvent (Ethanol).
Planning and Design, Construction, Operation and Decommission of the Oshakati Water Purification Plant Extensions, involving the following activities; 1.1 Site Clearance, Earthworks and Construction of a New Water Treatment Plant 1.2 Site Clearance, Earthworks, and construction for the Expansion of the existing Raw Water Storage Dam and modocation of the raw water pump station 1.3 Site Clearance, Earthworks and Construction of Sludge Ponds 1.4 Earthworks and Laying of Linear Infrastructure Inclusive of Roads, Pipelines and Electrical Cables 1.5 Handling, Storage and Potential Disposal of Ha
Establishment and operation of a dumping site at Liselo area in Zambezi region.
Proponents wishes a cultural village to teach the culture of the Damara People to visitors of the Spitzkoppe.
Attachment | Size |
---|---|
1216_EMP_Spitzkoppe Cultural Village.pdf | 2.72 MB |