These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal https://eia.meft.gov.na/.
The dates indicate the last date that it was/will be possible to comment on the project on the portal.
You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.
Explore your search results using the filter checkboxes, or amend your search or start a new search.
Construction of an eco-friendly low impact tourism and leisure facility on a 15ha plot in Ozondati Village, Ohungu Conservancy (Erongo Region).
| Attachment | Size | 
|---|---|
| 2760_EIA_Quagga Camp and Leisure.pdf | 2 MB | 
| 2760_EMP_Quagga Camp and Leisure.pdf | 295.61 KB | 
| 2760_Support Letter_Quagga Camp and Leisure.pdf | 322.02 KB | 
| 2760_Proof of Consultation_Quagga Camp and Leisure.pdf | 6.3 MB | 
| 2760_Map_Quagga Camp and Leisure.pdf | 1.32 MB | 
| 2760_Screening Notice_Quagga Camp and Leisure.pdf | 45.55 KB | 
| 2760_CV_Quagga Camp and Leisure.pdf | 160.05 KB | 
| 2760_BID_Quagga Camp and Leisure.pdf | 488.53 KB | 
For the upgrading of an earth track already proclaimed as DR3417, from Andara Village to Shamaturu Village's clinic, via Mangamba Village. This is a 15km long road with a 30 meters wide road reserve, therefore total project footprint will be less than 50 hectares.
Renewal of the existing Environmental Clearance Certificate 2. Change of project name from Elephant Ridge Camp to Ondjamba Hills.
| Attachment | Size | 
|---|---|
| 2047_EMP_Ondjamba Hills Camp in Erongo Region.pdf | 212.7 KB | 
| 2047_ECC Old_Ondjamba Hills Camp in Erongo Region.pdf | 113.64 KB | 
| 2047_Map_Ondjamba Hills Camp in Erongo Region.pdf | 188.68 KB | 
| 2047_Screening Notice_Ondjamba Hills Camp in Erongo Region.pdf | 42.89 KB | 
For the renewal of the Environmental Clearance Certificate for the operation of Sanny Auto Repairs Service Station at Ogongo in Omusati region.
The renewal of Environmental Clearance Certificate for the operation of the existing Omungwelume Service Station in Ohangwena Region.
For the renewal of Environmental Clearance Certificate of the operation of existing Sesriem Service Station at Sesriem, Sossusvlei, Hardap Region.
The renewal of Environmental Clearance Certificate for the operation of the existing Onesi Service Station at Onesi, Omusati Region.
Renewal: Construction of a eco-friendly tourism tented camp.
ECC renewal for the construction of an eco-friendly lodge.
| Attachment | Size | 
|---|---|
| 759_EMP_Damaraland Basalt Lodge in Kunene Region.pdf | 724.55 KB | 
| 759_Map_Damaraland Basalt Lodge in Kunene Region.pdf | 280.19 KB | 
| 759_Screening Notice_Damaraland Basalt Lodge in Kunene Region.pdf | 104.01 KB | 
The construction and operation of the proposed Ketu Two Thousand service station at Etunda Village in Omusati Region.
To allow for the upgrading of the 28km DR3662 to gravel standards. The road is already proclaimed.
| Attachment | Size | 
|---|---|
| 720_ESIA_28km DR3662 to gravel standards.pdf | 1.85 MB | 
| 720_ESMP_28km DR3662 to gravel standards.pdf | 608.03 KB | 
| 720_Bidding Document_28km DR3662 to gravel standards.pdf | 1.37 MB | 
| 720_Proof of Consultation_28km DR3662 to gravel standards.pdf | 524.71 KB | 
| 720_Map_28km DR3662 to gravel standards.pdf | 392.71 KB | 
| 720_Screening Notice_28km DR3662 to gravel standards.pdf | 87.29 KB | 
The operation of the existing Puma Eros service station in Eros, Windhoek, Khomas Region.
| Attachment | Size | 
|---|---|
| 502_EMP_Puma Eros service station in Eros.pdf | 1.26 MB | 
| 502_Retail Licence_Puma Eros service station in Eros.pdf | 162.6 KB | 
| 502_Map_Puma Eros service station in Eros.pdf | 236.68 KB | 
| 503_Screening Notice_Nelson Mandela service station in Windhoek_0.pdf | 53.74 KB | 
The operation of the existing Nelson Mandela service station in Windhoek, Khomas Region.
The operation of the existing Henadava service station in Katutura, Windhoek, Khomas Region.
| Attachment | Size | 
|---|---|
| 504_EMP_Henadava service station in Katutura.pdf | 1.09 MB | 
| 504_Retail Licence_Henadava service station in Katutura.pdf | 26.38 KB | 
| 504_Map_Henadava service station in Katutura.pdf | 261.81 KB | 
| 504_Screening Notice_Henadava service station in Katutura.pdf | 54.24 KB | 
The operation of the existing Soweto service station in Katutura, Windhoek, Khomas Region.
| Attachment | Size | 
|---|---|
| 505_EMP_Soweto service station in Katutura.pdf | 1.47 MB | 
| 505_Retail Licence_Soweto service station in Katutura.pdf | 473.49 KB | 
| 505_Map_Soweto service station in Katutura.pdf | 243.16 KB | 
| 505_Screening Notice_Soweto service station in Katutura.pdf | 48.39 KB | 
The operation of the existing Munitenge service station in Windhoek, Khomas Region.
The operation of the existing Rhino Park service station in Windhoek, Khomas Region.
The operation of the existing Bach Street Puma service station in Windhoek, Khomas Region.
The operation of the existing Van der Walt Motors service station in Windhoek, Khomas Region.
The operation of the existing Puma Klein Windhoek Service Station in Windhoek, Khomas Region.
The continuation of the operations of existing Onamulunga Service Station at Oniipa in Oshikoto Region.
The operation of the existing Nelson Mandela Service Station in Windhoek Khomas Region.
The operation of the existing Puma Eros Service Station in Windhoek, Khomas Region.
| Attachment | Size | 
|---|---|
| 447_EMP_Puma Eros service station in Windhoek.pdf | 194.82 KB | 
| 447_Environmental Monitoring_Puma Eros service station in Windhoek.pdf | 529.83 KB | 
| 447_Retail Licence_Puma Eros service station in Windhoek.pdf | 199.1 KB | 
| 447_Map_Puma Eros service station in Windhoek.pdf | 444.91 KB | 
The operation of the existing Henadava Service Station in Katutura, Windhoek, Khomas Region.
| Attachment | Size | 
|---|---|
| 443_EMP_Henadava service station in Katutura.pdf | 193.08 KB | 
| 443_Environmental Monitoring_Henadava service station in Katutura.pdf | 517.13 KB | 
| 443_Retail Licence_Henadava service station in Katutura.pdf | 26.38 KB | 
| 443_Map_Henadava service station in Katutura.pdf | 410.04 KB | 
The operation of the existing Munitenge Service Station in Windhoek, Khomas Region.
| Attachment | Size | 
|---|---|
| 442_EMP_Munitenge service station in Windhoek.pdf | 193.29 KB | 
| 442_Environmental Monitoring_Munitenge service station in Windhoek.pdf | 571.27 KB | 
| 442_Retail Licence_Munitenge service station in Windhoek.pdf | 22.98 KB | 
| 442_Map_Munitenge service station in Windhoek.pdf | 449.51 KB | 
The operation of the existing Soweto Service Station in Katutura, Windhoek, Khomas Region.
| Attachment | Size | 
|---|---|
| 452_EMP_Soweto service station in Katutura.pdf | 195.02 KB | 
| 452_Monitoring Report_Soweto service station in Katutura.pdf | 475.61 KB | 
| 452_Retail Licence_Soweto service station in Katutura.pdf | 473.49 KB | 
| 452_Map_Soweto service station in Katutura.pdf | 428.87 KB | 
Gravel road construction of DR3682 from Onaanda to Otamanzi (Omusati Region). This road is already a proclaimed road, since the 1990s.
Construction and operations of an abattoir for a piggery on Farm Oribib 33A at Otjikondo, Outjo, Kunene Region.
Road upgrading from a gravel road to a tar road (bitumen standards) The proposed project is located in the Kavango East Region in Northern Namibia. It involves the upgrading to bitumen standard of the District Road 3403 stretching from Divundu via Bagani and ending at Mohembo Border Post in the Kavango East Region in Northern Namibia. The District Road 3403 starts at the junction with TR8/4 in Divundu and follows a south easterly direction for 8km to Bagani. From Bagani the road follows a southerly direction towards the Mohembo border post between Namibia and Botswana.
The proposed road construction is a continuation of the DR3427 that starts in Tondoro Village along the B10 highway near Nkurenkuru. The initiation first phase construction was completed in 2015 from Tondoro to Mburu-Uru. This proposed construction aimed at completing the DR3427 construction from where the first phase ended in 2015. Thus the second phase seeks to complete the DR3427 from Mburu-Uru to Calikawo/Charlie Cutline/DR3446.
| Attachment | Size | 
|---|---|
| 3188_EIASR_Construction to Gravel Standard DR3427.pdf | 1.45 MB | 
| 3188_EMP_Construction to Gravel Standard DR3427.pdf | 1.52 MB | 
| 3188_Map_Construction to Gravel Standard DR3427.pdf | 577.67 KB | 
Renewal of Environmental Clearance Certificate for the operation of Ekuku Service Station in Oshakati, Oshana Region. The service station constitutes of three underground tanks , one Petrol (1) and two Diesel tanks each with the capacity of 46 cubic meter(m³).
| Attachment | Size | 
|---|---|
| 2922_EMP_Ekuku Service Station in Oshakati_Oshana Region.pdf | 349.23 KB | 
| 2922_ECC_Ekuku Service Station in Oshakati_Oshana Region.PDF | 459.28 KB | 
| 2922_Map_Ekuku Service Station in Oshakati_Oshana Region.pdf | 2.47 MB | 
Renewal of Environmental Clearance Certificate for the operations of EJ Trading Filling Station in Oshikango, Ohangwena region. The filling station constitutes of three underground storage tanks, consisting of Petrol (1) and Diesel (2) with the capacity of 46m³ and 23m³ respectively.
Renewal of Environmental Clearance Certificate for the operations of solar photovoltaic facility and associated infrastructure at Rosh Pinah, Karas region. The solar plant covers 12 hectares with 18000 solar panels.
Renewal of Environmental Clearance Certificate for the operation of existing Okalongo Service Station in Onandjaba, Okalongo. The service stations constitutes of two underground tanks, each with the capacity of 46m³.
Renewal of Environmental Clearance Certificate for the construction and operation of Soweto service station in Windhoek, Khomas Region. The site will consist of one(1) Petrol and two(2) Diesel underground tanks, each with the capacity of 23cubic meter(m³).
Renewal of Environmental Clearance Certificate for the construction and operation of Masivi Truckport and Filling Station in Rundu, Kavango West Region. The site will consist of one(1) Petrol and two(2) Diesel underground tanks, each with the capacity of 46 cubic meter(m³).
Transfer of Environmental Clearance certificate from Eco-Fuel CC to trade under Erongo Petroleum CC 2. There is no change of activities and no adverse environmental effect arising from the proposed amendment 3. To operate under the same EMP issued to Eco-Fuel cc.
The ECC is for the Exploration activities on Exclusive Prospecting Licenses 7405, 7406 and 7407 at Otjozondu village, Otjozondjupa region. The Prospecting programme will consist of both non-invasive and invasive methods. The non- invasive method consist topographical and geophysical survey followed by a mapping and rock chip phase. The invasive method consist of both reverse circulation and Diamond Core Drilling.
Renewal of existing ECC obtained 10 April 2017 Construction of a 2.5 MW PV Plant in Okongo Village
To renew environmental clearance of mwene Fuel Service Station at Omuntele , Oshikoto Region, That was expire .
Environmental Impact Assessment for the operation of an existing Sesriem fuel station at Sesriem, Sousssvlei, Hardap Region. The fuel station has been operating without an EMP on place, therefore Enercon Namibia (Pty) Ltd intends to regularize the operation of the existing fuel station according to the Environmental Management Act (2007) and its Regulations (2012). The site constitutes of three (3) underground fuel tanks (Diesel (2) and Petrol 1) each with the capacity of 23000L to cater for the vehicles in the Namibia Wildlife Resort in Sesriem.
| Attachment | Size | 
|---|---|
| 1427_ECC Application and EMP_Sesriem fuel station at Sesriem.pdf | 4.72 MB | 
| 1427_Retail Licence_Sesriem fuel station at Sesriem.PDF | 60.25 KB | 
| 1427_Map_Sesriem fuel station at Sesriem.pdf | 288.13 KB | 
ECC to be attached to the application for Leasehold.
| Attachment | Size | 
|---|---|
| 1318_EIA_Elephant Ridge Camp.pdf | 1.21 MB | 
| 1318_EMP_Elephant Ridge Camp.pdf | 197.86 KB | 
| 1318_Consent Letter_Elephant Ridge Camp.pdf | 25.02 KB | 
| 1318_Public Meeting Agenda_Elephant Ridge Camp.pdf | 1.96 MB | 
| 1318_Adverts_Elephant Ridge Camp.pdf | 3.31 MB | 
For the operation of a temporary fuel consumer installation facility on portion 8 of farm 67, Kapps farm, Windhoek, Khomas region. The site will constitute of two (2) self bunded above ground fuel tanks with a combined capacity of 126340L (126.34 cubic meters), to use as a temporary storage and source of fuel supply for the road construction project of Windhoek-Hosea Kutako Airport road, but not for public retail purposes.
| Attachment | Size | 
|---|---|
| 1081_EMP_portion 8 of farm 67_Kapps farm.pdf | 1.23 MB | 
| 1081_Newspaper adverts_portion 8 of farm 67_Kapps farm.PDF | 3.91 MB | 
| 1081_Scoping Report_portion 8 of farm 67_Kapps farm.pdf | 18.27 MB | 
| 1081_Support doc_portion 8 of farm 67_Kapps farm.pdf | 395.04 KB |