These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal https://eia.meft.gov.na/.
The dates indicate the last date that it was/will be possible to comment on the project on the portal.
You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.
Explore your search results using the filter checkboxes, or amend your search or start a new search.
| Attachment | Size |
|---|---|
| 3975_Environmental Audit_Walvis Bay Landfill Site.pdf | 843.24 KB |
| 3975_ECC Old_Walvis Bay Landfill Site.pdf | 345.15 KB |
| 3975_Map_Walvis Bay Landfill Site.pdf | 180.96 KB |
| 3975_Screening Notice_Walvis Bay Landfill Site.pdf | 70.28 KB |
| 3975_CV_Walvis Bay Landfill Site.pdf | 98.02 KB |
3. MINING AND QUARRYING ACTIVITIES 3.2 The construction of facilities for any process or activities which requires a licence, right or other form of authorisation, and the renewal of a licence, right or other form of authorisation, in terms of the Minerals (Prospecting and Mining Act), 1992. 3.2 Other forms of mining or extraction of any natural resources whether regulated by law or not. 3.3 Resource extraction, manipulation, conservation and related activities. 3.4 The extraction or processing of gas from natural and non-natural resources.
Original Application Activities that triggered EIA process (EMA Regulations 2012) Activity 1 (a) Energy Generation, Transmission and Storage The construction of facilities for the generation of electricity. The construction of three 10 MW PV facilities is proposed. Activity 1 (b) Energy Generation, Transmission and Storage The construction of facilities for the transmission and supply of electricity. The construction of PV facilities entails associated infrastructure, including transmission lines and a small onsite substation to connect to existing substations.
| Attachment | Size |
|---|---|
| 129_ESPA_Renewal of Alten Solar Power Hardap.pdf | 765.78 KB |
| 129_Map_Renewal of Alten Solar Power Hardap.pdf | 229.8 KB |
10.1 The construction of: (j) masts of any material or type and of any height, including those used for telecommunication broadcasting and radio transmission, but excluding - (i) flag poles, and (ii) lightening conductor poles. In November 2021, the Namibian government issued a notice of award stating its intention to appoint HYPHEN Hydrogen Energy (Hyphen) as the preferred bidder to develop the country’s first large-scale export green hydrogen (H2) project within in two concession areas (namely Springbok and Dolphin) in the Tsau//Khaeb National Park.
TotalEnergies EP Namibia B.V. ("TEEPNA") is applying to renew its ECC to continue with the previously assessed and approved activities, including appraisal well drilling in Block 2913B. TEEPNA and its partners hold an Exploration Right over Block 2913B.
Renewal of an Environmental Clearance Certificate for the Municipality of Walvis Bay's solid waste landfill site.
Renewal of the ECC for the Township Establishment and Associated Infrastructure.
Renewal of the ECC for the Township Establishment and Associated Infrastructure.
Renewal of the ECC for the Township Establishment and Associated Infrastructure.
3. Reason for Amendment(s): Upon submission of the application to NAMPAB, it was recommended that Narraville Extension 13 be split into two farms to be known as Narraville Extension 13 and Narraville Extension 16. Thus, we are seeking for an Environmental Clearance Certificate for Narraville Extension 16. Note the attached response from NAMPAB (Annexure A). 4. Describe the environmental changes arising from the proposed Amendment(s): The total area to be developed for the two extensions remains the same. New lay-outs for Extension16 are attached (Annexure B).
Proposed amendments to the conditions of current ECC 2. Proposed amendment(s): Environmental Clearance Certificate for Township Establishment of Narraville Extension 13 on the remainder of Farm Wanderdünen No. 23, Walvis Bay Townland, Erongo Region. 3. Reason for Amendment(s): Upon submission of the application to NAMPAB, it was recommended that Narraville Extension 13 be split into two farms to be known as Narraville Extension 13 and Narraville Extension 16. Thus, we are seeking for an Environmental Clearance Certificate for both extensions.
Environmental Management Plan for the Operation of the Walvis Bay Cemetery.
Renewal and Amendment of the current ECC.
The proposed amendments to the ECC (16 May 2018) and specifically to the Project Description in the EIA Report (SLR, 2017) covers the following items: Geographical Area; Number of Exploration Wells; Timing; and ECC Validity Period.
For Groundwater Abstraction for industrial purposes.
| Attachment | Size |
|---|---|
| 1407_NBL_Environmental Performance Report and EMP.pdf | 2.27 MB |