These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal https://eia.meft.gov.na/.
The dates indicate the last date that it was/will be possible to comment on the project on the portal.
You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.
Explore your search results using the filter checkboxes, or amend your search or start a new search.
3. MINING AND QUARRYING ACTIVITIES 3.2 The construction of facilities for any process or activities which requires a licence, right or other form of authorisation, and the renewal of a licence, right or other form of authorisation, in terms of the Minerals (Prospecting and Mining Act), 1992. 3.2 Other forms of mining or extraction of any natural resources whether regulated by law or not. 3.3 Resource extraction, manipulation, conservation and related activities. 3.4 The extraction or processing of gas from natural and non-natural resources.
Original Application Activities that triggered EIA process (EMA Regulations 2012) Activity 1 (a) Energy Generation, Transmission and Storage The construction of facilities for the generation of electricity. The construction of three 10 MW PV facilities is proposed. Activity 1 (b) Energy Generation, Transmission and Storage The construction of facilities for the transmission and supply of electricity. The construction of PV facilities entails associated infrastructure, including transmission lines and a small onsite substation to connect to existing substations.
| Attachment | Size |
|---|---|
| 129_ESPA_Renewal of Alten Solar Power Hardap.pdf | 765.78 KB |
| 129_Map_Renewal of Alten Solar Power Hardap.pdf | 229.8 KB |
10.1 The construction of: (j) masts of any material or type and of any height, including those used for telecommunication broadcasting and radio transmission, but excluding - (i) flag poles, and (ii) lightening conductor poles. In November 2021, the Namibian government issued a notice of award stating its intention to appoint HYPHEN Hydrogen Energy (Hyphen) as the preferred bidder to develop the country’s first large-scale export green hydrogen (H2) project within in two concession areas (namely Springbok and Dolphin) in the Tsau//Khaeb National Park.
TotalEnergies EP Namibia B.V. ("TEEPNA") is applying to renew its ECC to continue with the previously assessed and approved activities, including appraisal well drilling in Block 2913B. TEEPNA and its partners hold an Exploration Right over Block 2913B.
The proposed construction and Operation of a piggery and an abattoir and associated infrastructures for the Evaristus Shikongo Correctional Facility near Tsumeb in the Oshikoto Region. The proposed facilities will be established on the NCS property/premises, i.e. on its Farm where the Evaristus Shikongo Correctional Facility is situated.
Stantoll Properties CC (hereinafter referred to as Stantoll Properties or the Proponent) intends to continue with their sand/gravel mining activities from a sand/gravel bank in the Onanime Village, Okatana Constituency of the Oshana Region. The project has been in operation since October 2015 whereby the sand/gravel has been extracted from a burrow pit with an approximate surface area of 7 hectares (ha).
The proposed amendments to the ECC (16 May 2018) and specifically to the Project Description in the EIA Report (SLR, 2017) covers the following items: Geographical Area; Number of Exploration Wells; Timing; and ECC Validity Period.
Shalom Messenger Ministries (hereinafter referred to as the Proponent) proposes to construct and operate a 300m high and 20m x 20m base radio transmission tower in the Omindamba B Village near Ruacana in the Omusati Region. The project Proponent identified the need of radio frequency modulation (FM) and related services in the area, hence the intention to erect the said tower.
For Groundwater Abstraction for industrial purposes.
| Attachment | Size |
|---|---|
| 1407_NBL_Environmental Performance Report and EMP.pdf | 2.27 MB |
This report presents an Environmental Impact Assessment (EIA) for the proposed construction and operation of a fuel service station by Omushona Trading cc (CC/2013/01124) at Okatana area, Oshakati North East, Oshana Region along the Oshakati-Onuno C45 Highway road. The proposed development will result in the establishment of 2 storage tanks of both diesel and petrol connected to a pump for easy filling of vehicles.
Operational phase: The Mining Activities on the Mining Claims No. 68463 to 68472 near Ruacana in the Omusati Region (SLS Crushers or hereinafter referred to as The Proponent) intends to continue with their aggregate mining operations on the currently active part of one of the ten mining claims near Ruacana in the Omusati Region. The mining claims are reported to be covering parts of the Omusati and Kunene Regions with the current mining site/activities located in the Omusati Region part only).