These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal http://eia.met.gov.na.
The dates indicate the last date that it was/will be possible to comment on the project on the portal.
You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.
Explore your search results using the filter checkboxes, or amend your search or start a new search.
Attachment | Size |
---|---|
4286_EMP_Soweto Street_Katima Mulilo.pdf | 438.46 KB |
4286_Proof of Consultation_Soweto Street_Katima Mulilo.pdf | 3.65 MB |
4286_Map_Soweto Street_Katima Mulilo.pdf | 1.02 MB |
4286_Screening Notice_Soweto Street_Katima Mulilo.pdf | 156.76 KB |
4286_CV_Soweto Street_Katima Mulilo.pdf | 104.86 KB |
Attachment | Size |
---|---|
4510_EMP_Sam Nujoma Street_Katima Mulilo.pdf | 528.01 KB |
4510_Proof of Consultaiton_Sam Nujoma Street_Katima Mulilo.pdf | 4.15 MB |
4510_Map_Sam Nujoma Street_Katima Mulilo.pdf | 29.12 MB |
4510_Screening Notice_Sam Nujoma Street_Katima Mulilo.pdf | 255.88 KB |
4510_CV_Sam Nujoma Street_Katima Mulilo.pdf | 116.8 KB |
Attachment | Size |
---|---|
4511_EMP_Lechwe Street_Katima Mulilo.pdf | 548.08 KB |
4511_Proof of Consultation_Lechwe Street_Katima Mulilo.pdf | 904.69 KB |
4511_Map_Lechwe Street_Katima Mulilo.pdf | 1.82 MB |
4511_Screening Notice_Lechwe Street_Katima Mulilo.pdf | 169.62 KB |
Attachment | Size |
---|---|
4513_EMP_Mafuta Road_Katima Mulilo.pdf | 460.91 KB |
4513_Proof of Consultation_Mafuta Road_Katima Mulilo.pdf | 4.82 MB |
4513_Map_Mafuta Road_Katima Mulilo.pdf | 1.94 MB |
4513_Screening Notice_Mafuta Road_Katima Mulilo.pdf | 361.08 KB |
4513_CV_Mafuta Road_Katima Mulilo.pdf | 809.87 KB |
Attachment | Size |
---|---|
4281_ESMP_T0807 road_Katima Mulilo.pdf | 638.33 KB |
4281_Proof of Consultation_T0807 road_Katima Mulilo.pdf | 3.18 MB |
4281_Map_T0807 road_Katima Mulilo.pdf | 1.18 MB |
4281_Screening Notice_T0807 road_Katima Mulilo.pdf | 183.54 KB |
4281_CV_T0807 road_Katima Mulilo.pdf | 116.05 KB |
Attachment | Size |
---|---|
4278_EMP_Hage Geingob Road_Katima Mulilo.pdf | 582.56 KB |
4278_Proof of Consultation_Hage Geingob Road_Katima Mulilo.pdf | 904.69 KB |
4278_Map_Hage Geingob Road_Katima Mulilo.pdf | 736.53 KB |
4278_Screening Notice_Hage Geingob Road_Katima Mulilo.pdf | 183.59 KB |
4278_CV_Hage Geingob Road_Katima Mulilo.pdf | 116.8 KB |
Attachment | Size |
---|---|
4515_EMP_Upgrading of Chefuzwe road.pdf | 874.23 KB |
4515_Power of Attorney_Upgrading of Chefuzwe road.pdf | 372.09 KB |
4515_Proof of Consultation_Upgrading of Chefuzwe road.pdf | 3.96 MB |
4515_Map_Upgrading of Chefuzwe road.pdf | 19.28 MB |
4515_Screening Notice_Upgrading of Chefuzwe road.pdf | 165.71 KB |
4515_CV_Upgrading of Chefuzwe road.pdf | 116.05 KB |
The proposed construction of a 200MW (Megawatt) solar photovoltaic plant on a leasable area equal to 505HA in the Areva/Orano Mine Area, !Oe-#Gan Traditional Authority Jurisdiction Area, Usakos District, Daures Constituency, Erongo Region.
Proposed permanent closure and rezoning of Portion A of Erf R/901 Omulanga, Extension 2, from public open space to business, Otjozondjupa Region.
Renewal of expired Environmental Impact Assessment Certificate. The EIA was issued before but has in the meantime expired. This application is therefore being made for a renewal of the certificate for the Environmental impact assessment for the proposed township establishment on portion 23 of Grootfontein Town and Townlands No. 814/Remainder.
The proposed construction and Operation of a piggery and an abattoir and associated infrastructures for the Evaristus Shikongo Correctional Facility near Tsumeb in the Oshikoto Region. The proposed facilities will be established on the NCS property/premises, i.e. on its Farm where the Evaristus Shikongo Correctional Facility is situated.
The clients entered into a PPP agreement with the Gobabis Municipality to address the housing backlog by establishing two township respectively on the Townlands of Gobabis. As per the Environmental Management Act, this activity is subjected to an Environmental Impact Assessment. In order to finalise the township establishment process, the application need to be submitted to the Ministry of Urban and Rural Development and the Environmental Clearance Certificate is therefore needed for this process.
Stantoll Properties CC (hereinafter referred to as Stantoll Properties or the Proponent) intends to continue with their sand/gravel mining activities from a sand/gravel bank in the Onanime Village, Okatana Constituency of the Oshana Region. The project has been in operation since October 2015 whereby the sand/gravel has been extracted from a burrow pit with an approximate surface area of 7 hectares (ha).
Shalom Messenger Ministries (hereinafter referred to as the Proponent) proposes to construct and operate a 300m high and 20m x 20m base radio transmission tower in the Omindamba B Village near Ruacana in the Omusati Region. The project Proponent identified the need of radio frequency modulation (FM) and related services in the area, hence the intention to erect the said tower.
Kalkrand Village Council is in the process of upgrading and promoting development in the Donker hoek settlement area of Farm Gurus No. 150 Kalkrand by formalising informal settlements and in so doing improve the economy of Kalkrand. Therefore, the proponent being Kalkrand Village Council approved the creation of Portion 21 (Donker Hoek), Extension 3 of the Remainder of Farm Gurus No. 150, Kalkrand measuring approximately (141, 757.68 m²) for use to formalise the existing informal settlement.
This report presents an Environmental Impact Assessment (EIA) for the proposed construction and operation of a fuel service station by Omushona Trading cc (CC/2013/01124) at Okatana area, Oshakati North East, Oshana Region along the Oshakati-Onuno C45 Highway road. The proposed development will result in the establishment of 2 storage tanks of both diesel and petrol connected to a pump for easy filling of vehicles.
Operational phase: The Mining Activities on the Mining Claims No. 68463 to 68472 near Ruacana in the Omusati Region (SLS Crushers or hereinafter referred to as The Proponent) intends to continue with their aggregate mining operations on the currently active part of one of the ten mining claims near Ruacana in the Omusati Region. The mining claims are reported to be covering parts of the Omusati and Kunene Regions with the current mining site/activities located in the Omusati Region part only).