Search results

EIA reports for public comment

These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal http://eia.met.gov.na.

The dates indicate the last date that it was/will be possible to comment on the project on the portal.

You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.

Explore your search results using the filter checkboxes, or amend your search or start a new search.

Displaying results 1 - 26 of 26
Monday, 23 June 2025
Ritta Khiba Planning Consultants 2025. 240827004600: Application for Environmental Clearance Certificate for subdivision of Erf 2031, Independence Avenue, Katutura into Portion A (±397m²) and the Remainder, and reservation of portion a as street, Khomas Region.
Due to the town planning and cadastral processes being applied for this year, the Municipal council letter dated 30/04/2024 states that the applicant obtains the Environmental Clearance Certificate from the Environmental Commissioner for the creation of the street, prior to the submission of the subdivision application to the Urban and Regional Planning Board.
Thursday, 24 October 2024
Ritta Khiba Planning Consultants 2024. 240712004286: Environmental Impact Assessment: the upgrading Soweto Street (0.59km) to low volume bituminous seal standard in Katima Mulilo, Zambezi Region, Namibia.
Environmental Impact Assessment; the upgrading Soweto Street (0.59km) to low volume bituminous seal standard in Katima Mulilo, Zambezi Region, Namibia.
Thursday, 24 October 2024
Ritta Khiba Planning Consultants 2024. 241004004773: Environmental Impact Assessment: upgrading of DR 3518 Sangwali road (2.8km) to low volume seal (lvs) standard in Sangwali, Zambezi Region, Namibia.
Environmental Impact Assessment: upgrading of DR 3518 Sangwali road (2.8km) to low volume seal (lvs) standard in Sangwali, Zambezi Region, Namibia.
Thursday, 24 October 2024
Ritta Khiba Planning Consultants 2024. 240805004510: Environmental Impact Assessment: the upgrading Sam Nujoma Street (4.55km) to low volume bituminous seal standard in Katima Mulilo, Zambezi Region, Namibia.
Environmental Impact Assessment: the upgrading Sam Nujoma Street (4.55km) to low volume bituminous seal standard in Katima Mulilo, Zambezi Region, Namibia.
Thursday, 24 October 2024
Ritta Khiba Planning Consultants 2024. 240805004511: Environmental Impact Assessment: upgrading Lechwe Street (1.84km) to low volume bitumenous seal standard in Katima Mulilo, Zambezi Region, Namibia.
Environmental Impact Assessment: upgrading Lechwe Street (1.84km) to low volume bitumenous seal standard in Katima Mulilo, Zambezi Region, Namibia.
Thursday, 24 October 2024
Ritta Khiba Planning Consultants 2024. 240805004512: Environmental Impact Assessment: upgrading Richard Muhinda Street (1km) to low volume bituminous seal standard in Katima Mulilo, Zambezi Region, Namibia.
Environmental Impact Assessment: upgrading Richard Muhinda Street (1km) to low volume bituminous seal standard in Katima Mulilo, Zambezi Region, Namibia.
Thursday, 24 October 2024
Ritta Khiba Planning Consultants 2024. 240805004513: Environmental Impact Assessment: the upgrading of the Mafuta Road (5.59 km) to low volume bituminous seal standard in Katima Mulilo, Zambezi Region, Namibia.
Environmental Impact Assessment: the upgrading of the Mafuta Road (5.59 km) to low volume bituminous seal standard in Katima Mulilo, Zambezi Region, Namibia.
Thursday, 24 October 2024
Ritta Khiba Planning Consultants 2024. 240712004281: Environmental Impact Assessment: upgrading T0807 road (1.56km) to low volume seal (lvs) standard in Katima Mulilo, Zambezi Region, Namibia.
Environmental Impact Assessment: upgrading T0807 road (1.56km) to low volume seal (lvs) standard in Katima Mulilo, Zambezi Region, Namibia.
Thursday, 24 October 2024
Ritta Khiba Planning Consultants 2024. 240805004514: Environmental Impact Assessment: the upgrading unnamed street (connects Hage Geingob St to Hospital Rd) (0.41km) to low volume bituminous seal standard in Katima Mulilo, Zambezi Region, Namibia.
Environmental Impact Assessment: the upgrading unnamed street (connects Hage Geingob St to Hospital Rd) (0.41km) to low volume bituminous seal standard in Katima Mulilo, Zambezi Region, Namibia.
Thursday, 24 October 2024
Ritta Khiba Planning Consultants 2024. 240712004278: Environmental Impact Assessment: upgrading Hage Geingob Road (2.2km) to low volume bitumenous seal standard in Katima Mulilo, Zambezi Region, Namibia.
Environmental Impact Assessment: upgrading Hage Geingob Road (2.2km) to low volume bitumenous seal standard in Katima Mulilo, Zambezi Region, Namibia.
Thursday, 24 October 2024
Ritta Khiba Planning Consultants 2024. 240805004515: Environmental Impact Assessment: upgrading of Chefuzwe road (8.54km) to low volume seal (LVS) standard.
Environmental Impact Assessment: upgrading of Chefuzwe road (8.54km) to low volume seal (LVS) standard.
Thursday, 10 October 2024
Mafuta Environmental Consultants 2024. 240807004531: Environmental Impact Assessment (EIA) study for the proposed construction and operation of a wastewater treatment plant and associated infrastructures in Omaruru Town, Erongo Region.
The Proposed Construction and Operation of a Wastewater Treatment Plant and associated infrastructures in Omaruru Town, Erongo Region.
Thursday, 12 September 2024
Mafuta Environmental Consultants 2024. 240807004529: ECC application for the upgrading and continued operation of Existing S. I. !Gobs Senior Secondary School Oxidation Ponds (Temporal Detention Holding Ponds) in Omaruru Town, Erongo Region.
The upgrading and continued operation of Existing S. I. !Gobs Senior Secondary School Oxidation Ponds (Temporal Detention Holding Ponds) in Omaruru Town, Erongo Region.
Thursday, 12 September 2024
Mafuta Environmental Consultants 2024. 240807004530: ECC application for the decommissioning of Existing Municipal and Ozondje Oxidation Ponds in Omaruru Town, Erongo Region.
The decommissioning of Existing Municipal and Ozondje Oxidation Ponds in Omaruru Town, Erongo Region.
Thursday, 7 September 2023
Ritta Khiba Planning Consultants 2023. 230622001597: The proposed construction of a 200MW (Megawatt) solar photovoltaic plant on a leasable area equal to 505HA in the Areva/Orano Mine Area, !Oe-#Gan Traditional Authority Jurisdiction Area, Usakos District, Daures Constituency, Erongo Region.

The proposed construction of a 200MW (Megawatt) solar photovoltaic plant on a leasable area equal to 505HA in the Areva/Orano Mine Area, !Oe-#Gan Traditional Authority Jurisdiction Area, Usakos District, Daures Constituency, Erongo Region.

Monday, 27 March 2023
Ritta Khiba Planning Consultants 2023. 230308001111: Proposed permanent closure and rezoning of Portion A of Erf R/901 Omulanga, Extension 2, from public open space to business, Otjozondjupa Region.

Proposed permanent closure and rezoning of Portion A of Erf R/901 Omulanga, Extension 2, from public open space to business, Otjozondjupa Region.

Wednesday, 22 June 2022
Ritta Khiba Planning Consultants 2022. APP-003747: Environmental Impact Assessment for the proposed township establishment on Portion 23 of Grootfontein Town and Townlands No. 814/RE.

Renewal of expired Environmental Impact Assessment Certificate. The EIA was issued before but has in the meantime expired. This application is therefore being made for a renewal of the certificate for the Environmental impact assessment for the proposed township establishment on portion 23 of Grootfontein Town and Townlands No. 814/Remainder.

Thursday, 5 May 2022
Mafuta Environmental Consultants 2022. APP-003411: Environmental Scoping Assessment for the proposed construction and operation of a piggery and an abattoir and associated infrastructures for the Evaristus Shikongo Correctional Facility on the Namibia Correctional Service (NCS) Farm near Tsumeb, Oshikoto Region.

The proposed construction and Operation of a piggery and an abattoir and associated infrastructures for the Evaristus Shikongo Correctional Facility near Tsumeb in the Oshikoto Region. The proposed facilities will be established on the NCS property/premises, i.e. on its Farm where the Evaristus Shikongo Correctional Facility is situated.

Friday, 26 March 2021
Ritta Khiba Planning Consultants 2021. APP-002399: Proposed Environmental Impact Assessment for the proposed township establishments on Portions 148 and 167 of the Farm Townlands of Gobabis No. 114, Gobabis, Omaheke Region.

The clients entered into a PPP agreement with the Gobabis Municipality to address the housing backlog by establishing two township respectively on the Townlands of Gobabis. As per the Environmental Management Act, this activity is subjected to an Environmental Impact Assessment. In order to finalise the township establishment process, the application need to be submitted to the Ministry of Urban and Rural Development and the Environmental Clearance Certificate is therefore needed for this process.

Monday, 24 August 2020
Mafuta Environmental Consultants 2020. APP-001615: Environmental Clearance Certificate (ECC) Renewal for the Sand/Gravel Mining Activities in the Onanime Village near Oshakati, Oshana Region.

Stantoll Properties CC (hereinafter referred to as Stantoll Properties or the Proponent) intends to continue with their sand/gravel mining activities from a sand/gravel bank in the Onanime Village, Okatana Constituency of the Oshana Region. The project has been in operation since October 2015 whereby the sand/gravel has been extracted from a burrow pit with an approximate surface area of 7 hectares (ha).

Tuesday, 9 June 2020
Mafuta Environmental Consultants 2020. APP-001382: Environmental Assessment (EA) for the Proposed Construction and Operation of a Radio Transmission Tower in the Omindamba B Village of the Ruacana Constituency, Omusati Region.

Shalom Messenger Ministries (hereinafter referred to as the Proponent) proposes to construct and operate a 300m high and 20m x 20m base radio transmission tower in the Omindamba B Village near Ruacana in the Omusati Region. The project Proponent identified the need of radio frequency modulation (FM) and related services in the area, hence the intention to erect the said tower.

Tuesday, 19 May 2020
Ritta Khiba Planning Consultants 2020. APP-001299: For the formalisation of existing informal settlement area referred to as Portion 21 (Donkerhoek) Extension 3 of the remainder of Farm Gurus No. 150, Kalkrand.

Kalkrand Village Council is in the process of upgrading and promoting development in the Donker hoek settlement area of Farm Gurus No. 150 Kalkrand by formalising informal settlements and in so doing improve the economy of Kalkrand. Therefore, the proponent being Kalkrand Village Council approved the creation of Portion 21 (Donker Hoek), Extension 3 of the Remainder of Farm Gurus No. 150, Kalkrand measuring approximately (141, 757.68 m²) for use to formalise the existing informal settlement.

Tuesday, 28 April 2020
Mafuta Environmental Consultants 2020. APP-001283: Environmental Impact Assessment (EIA) for the proposed construction and operation of a fuel service station by Omushona Trading cc (CC/2013/01124) at Okatana area, Oshakati North East, Oshana Region.

This report presents an Environmental Impact Assessment (EIA) for the proposed construction and operation of a fuel service station by Omushona Trading cc (CC/2013/01124) at Okatana area, Oshakati North East, Oshana Region along the Oshakati-Onuno C45 Highway road. The proposed development will result in the establishment of 2 storage tanks of both diesel and petrol connected to a pump for easy filling of vehicles.

Sunday, 5 April 2020
Mafuta Environmental Consultants 2020. APP-001212: Environmental Clearance Certificate (ECC) Renewal for Mining Activities on the Mining Claims No. 68463 to 68472 near Ruacana in the Omusati Region.

Operational phase: The Mining Activities on the Mining Claims No. 68463 to 68472 near Ruacana in the Omusati Region (SLS Crushers or hereinafter referred to as The Proponent) intends to continue with their aggregate mining operations on the currently active part of one of the ten mining claims near Ruacana in the Omusati Region. The mining claims are reported to be covering parts of the Omusati and Kunene Regions with the current mining site/activities located in the Omusati Region part only).

Not found what you are looking for? Amend your search...