These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal https://eia.meft.gov.na/.
The dates indicate the last date that it was/will be possible to comment on the project on the portal.
You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.
Explore your search results using the filter checkboxes, or amend your search or start a new search.
The proposed development of the Otjimbingwe Service Station. The project entails the construction of a standard service station with 4 dispensing pumps (petrol and diesel) with 3 double walled Underground Storage Tanks of 45 cubic meters. The service station will also have a canopy covered forecourt, ablutions, tyre fitment and oil changing facilities, convenience store and street upgrading in order to provide safe access to the proposed service station.
| Attachment | Size |
|---|---|
| 789_EIA_Otjimbingwe Service Station.pdf | 2.71 MB |
| 789_EMP_Otjimbingwe Service Station.pdf | 549.35 KB |
| 789_Consent_Otjimbingwe Service Station.pdf | 435.53 KB |
| 789_Proof of Consultation_Otjimbingwe Service Station.pdf | 675.8 KB |
| 789_Map_Otjimbingwe Service Station.pdf | 251.9 KB |
| 789_Screening Notice_Otjimbingwe Service Station.pdf | 175.42 KB |
The proposed construction and Operation of a piggery and an abattoir and associated infrastructures for the Evaristus Shikongo Correctional Facility near Tsumeb in the Oshikoto Region. The proposed facilities will be established on the NCS property/premises, i.e. on its Farm where the Evaristus Shikongo Correctional Facility is situated.
The proposed development of the AK Service Station - Kuisebmund is planned for Erf 7214, Khomashochland street, Extension 5, Kuisebmund, Walvis Bay situated on GPS Position: 22°55'30.5"S 14°32'25.7"E. The envisioned project entails the construction of a fuel/service station with four dispensing pumps (petrol and diesel) with 3 double walled Underground Storage Tanks of 45 cubic metres.
Stantoll Properties CC (hereinafter referred to as Stantoll Properties or the Proponent) intends to continue with their sand/gravel mining activities from a sand/gravel bank in the Onanime Village, Okatana Constituency of the Oshana Region. The project has been in operation since October 2015 whereby the sand/gravel has been extracted from a burrow pit with an approximate surface area of 7 hectares (ha).
Shalom Messenger Ministries (hereinafter referred to as the Proponent) proposes to construct and operate a 300m high and 20m x 20m base radio transmission tower in the Omindamba B Village near Ruacana in the Omusati Region. The project Proponent identified the need of radio frequency modulation (FM) and related services in the area, hence the intention to erect the said tower.
This report presents an Environmental Impact Assessment (EIA) for the proposed construction and operation of a fuel service station by Omushona Trading cc (CC/2013/01124) at Okatana area, Oshakati North East, Oshana Region along the Oshakati-Onuno C45 Highway road. The proposed development will result in the establishment of 2 storage tanks of both diesel and petrol connected to a pump for easy filling of vehicles.
Operational phase: The Mining Activities on the Mining Claims No. 68463 to 68472 near Ruacana in the Omusati Region (SLS Crushers or hereinafter referred to as The Proponent) intends to continue with their aggregate mining operations on the currently active part of one of the ten mining claims near Ruacana in the Omusati Region. The mining claims are reported to be covering parts of the Omusati and Kunene Regions with the current mining site/activities located in the Omusati Region part only).
The proposed development of the Onankali Service Station is planned for a parcel of land situated on GPS Position: 18°11'16.3"S 16°22'43.2"E. The envisioned project entails the construction of a standard service station with three dispensing pumps (petrol and diesel) with 3 double walled Underground Storage Tanks of 45 cubic metres with 5 compartments, a canopy covered forecourt, ablutions, tyre fitment & spares centre, convenience store and street upgrading in order to provide safe access to the proposed service station.