These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal http://eia.met.gov.na.
The dates indicate the last date that it was/will be possible to comment on the project on the portal.
You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.
Explore your search results using the filter checkboxes, or amend your search or start a new search.
Construction of the Welwitchia University Swakopmund Campus at Ocean View in Swakopmund, Erongo Region The proposed development site is strategically located within the Ocean View suburb, north of Swakopmund's central business district (CBD), at Ocean View, Erf 3342 Swakopmund Extension 9. This site offers convenient access for students, staff, and patients, providing a tranquil environment conducive to focused learning and patient care. The location is approximately 6 kilometres from the CBD, with general site coordinates at 22.637591, and 14.536919.
The Environmental Clearance Certificate (ECC) is required to enable mariculture development in Swakopmund townland. Prospective operators will be required to develop site-specific management plans focusing on the specific areas and species they would like to farm with. The Ministry of Fisheries and Marine Resources (MFMR) with support from the Benguela Current Commission (BCC) instituted the impact assessment study to enable the mariculture development in Namibia.
The Environmental Clearance Certificate is required to enable mariculture development in Walvis Bay (land-based aquaculture) and water-based aquaculture for Namport.
The Environmental Clearance Certificate is required for the development of the Mariculture sector in Lüderitz.
For the renewal of the Environmental Clearance Certificate for the operation of Sanny Auto Repairs Service Station at Ogongo in Omusati region.
For the renewal of Environmental Clearance Certificate of the operation of existing Sesriem Service Station at Sesriem, Sossusvlei, Hardap Region.
The renewal of Environmental Clearance Certificate for the operation of the existing Onesi Service Station at Onesi, Omusati Region.
The renewal of Environmental Clearance Certificate for the operation of the existing Omungwelume Service Station in Ohangwena Region.
The Environmental Clearance Certificate is required to enable the extension of the Iitapa Okeeholongo Rural Water Supply Scheme Phase II in the Omusati Region. The proposed extensions are aimed at providing access to clean water to the nearby villages within the Okahao Constituency.
The construction and operation of the proposed Ketu Two Thousand service station at Etunda Village in Omusati Region.
The operation of the existing Henadava service station in Katutura, Windhoek, Khomas Region.
Attachment | Size |
---|---|
504_EMP_Henadava service station in Katutura.pdf | 1.09 MB |
504_Retail Licence_Henadava service station in Katutura.pdf | 26.38 KB |
504_Map_Henadava service station in Katutura.pdf | 261.81 KB |
504_Screening Notice_Henadava service station in Katutura.pdf | 54.24 KB |
The operation of the existing Soweto service station in Katutura, Windhoek, Khomas Region.
Attachment | Size |
---|---|
505_EMP_Soweto service station in Katutura.pdf | 1.47 MB |
505_Retail Licence_Soweto service station in Katutura.pdf | 473.49 KB |
505_Map_Soweto service station in Katutura.pdf | 243.16 KB |
505_Screening Notice_Soweto service station in Katutura.pdf | 48.39 KB |
The operation of the existing Munitenge service station in Windhoek, Khomas Region.
The operation of the existing Puma Eros service station in Eros, Windhoek, Khomas Region.
Attachment | Size |
---|---|
502_EMP_Puma Eros service station in Eros.pdf | 1.26 MB |
502_Retail Licence_Puma Eros service station in Eros.pdf | 162.6 KB |
502_Map_Puma Eros service station in Eros.pdf | 236.68 KB |
503_Screening Notice_Nelson Mandela service station in Windhoek_0.pdf | 53.74 KB |
The operation of the existing Nelson Mandela service station in Windhoek, Khomas Region.
The operation of the existing Rhino Park service station in Windhoek, Khomas Region.
The operation of the existing Bach Street Puma service station in Windhoek, Khomas Region.
The operation of the existing Van der Walt Motors service station in Windhoek, Khomas Region.
The operation of the existing Puma Klein Windhoek Service Station in Windhoek, Khomas Region.
The continuation of the operations of existing Onamulunga Service Station at Oniipa in Oshikoto Region.
The operation of the existing Munitenge Service Station in Windhoek, Khomas Region.
Attachment | Size |
---|---|
442_EMP_Munitenge service station in Windhoek.pdf | 193.29 KB |
442_Environmental Monitoring_Munitenge service station in Windhoek.pdf | 571.27 KB |
442_Retail Licence_Munitenge service station in Windhoek.pdf | 22.98 KB |
442_Map_Munitenge service station in Windhoek.pdf | 449.51 KB |
The operation of the existing Nelson Mandela Service Station in Windhoek Khomas Region.
The operation of the existing Puma Eros Service Station in Windhoek, Khomas Region.
Attachment | Size |
---|---|
447_EMP_Puma Eros service station in Windhoek.pdf | 194.82 KB |
447_Environmental Monitoring_Puma Eros service station in Windhoek.pdf | 529.83 KB |
447_Retail Licence_Puma Eros service station in Windhoek.pdf | 199.1 KB |
447_Map_Puma Eros service station in Windhoek.pdf | 444.91 KB |
The operation of the existing Henadava Service Station in Katutura, Windhoek, Khomas Region.
Attachment | Size |
---|---|
443_EMP_Henadava service station in Katutura.pdf | 193.08 KB |
443_Environmental Monitoring_Henadava service station in Katutura.pdf | 517.13 KB |
443_Retail Licence_Henadava service station in Katutura.pdf | 26.38 KB |
443_Map_Henadava service station in Katutura.pdf | 410.04 KB |
The operation of the existing Soweto Service Station in Katutura, Windhoek, Khomas Region.
Attachment | Size |
---|---|
452_EMP_Soweto service station in Katutura.pdf | 195.02 KB |
452_Monitoring Report_Soweto service station in Katutura.pdf | 475.61 KB |
452_Retail Licence_Soweto service station in Katutura.pdf | 473.49 KB |
452_Map_Soweto service station in Katutura.pdf | 428.87 KB |
The ECC is required proposed New Township Establishment, Subdivision and Consolidation of Erven at Okahandja Town (Okahandja Extension 19) in Otjozondjupa Region.
The amendment is required to change ECC 00597 for the Operation of the Tantalite Valley Mine Project on ML 77 - Phase 1 including the Upgrading of existing Ore Processing Facilities and Reworking of Waste Rock Dumps outside Warmbad in //Karas Region to include mining and processing of Lithium Resources. The proponent would like to add Industrial Minerals as well as Dimension Stones on mineral groups on ML 77.
Attachment | Size |
---|---|
187_EMP_Tantalite Valley Mine on ML 77.pdf | 268.03 KB |
187_Map_Tantalite Valley Mine on ML 77.pdf | 1.11 MB |
Construction and operations of an abattoir for a piggery on Farm Oribib 33A at Otjikondo, Outjo, Kunene Region.
The Environmental Clearance Certificate is required for the construction of the new charcoal storage and packaging plant in Arandis town in Erongo Region.
The ECC is required for the operational stage of the Independence Beach Service Station.
The Environmental Clearance Certificate is required for the construction of the Mpungu Filling Station and Shopping Mall and provision of associated bulk services.
Renewal of Environmental Clearance Certificate for the operation of Ekuku Service Station in Oshakati, Oshana Region. The service station constitutes of three underground tanks , one Petrol (1) and two Diesel tanks each with the capacity of 46 cubic meter(m³).
Attachment | Size |
---|---|
2922_EMP_Ekuku Service Station in Oshakati_Oshana Region.pdf | 349.23 KB |
2922_ECC_Ekuku Service Station in Oshakati_Oshana Region.PDF | 459.28 KB |
2922_Map_Ekuku Service Station in Oshakati_Oshana Region.pdf | 2.47 MB |
The Environmental Clearance Certificate is required for the establishment of a Golf Estate at Portion 217-219 of Portion 193 of Walvis Bay Town and Townlands No. 1 and a street portion. A number of activities such as re-zoning, construction, site clearance will be undertaken among which cannot be undertaken without authorisation from the Environmental Commissioner.
Renewal of Environmental Clearance Certificate for the operations of EJ Trading Filling Station in Oshikango, Ohangwena region. The filling station constitutes of three underground storage tanks, consisting of Petrol (1) and Diesel (2) with the capacity of 46m³ and 23m³ respectively.
Renewal of Environmental Clearance Certificate for the operations of solar photovoltaic facility and associated infrastructure at Rosh Pinah, Karas region. The solar plant covers 12 hectares with 18000 solar panels.
Renewal of Environmental Clearance Certificate for the operation of existing Okalongo Service Station in Onandjaba, Okalongo. The service stations constitutes of two underground tanks, each with the capacity of 46m³.
Renewal of Environmental Clearance Certificate for the construction and operation of Soweto service station in Windhoek, Khomas Region. The site will consist of one(1) Petrol and two(2) Diesel underground tanks, each with the capacity of 23cubic meter(m³).
Renewal of Environmental Clearance Certificate for the construction and operation of Masivi Truckport and Filling Station in Rundu, Kavango West Region. The site will consist of one(1) Petrol and two(2) Diesel underground tanks, each with the capacity of 46 cubic meter(m³).
Namib Eden Trading CC indents to construct and commission an eco-friendly seawater desalination plant at Farm Hentiesbaai No. 133 at Henties Bay in Erongo Region. The proponent has been conditionally granted approval by the Henties Bay Council (Resolution No. CR/010/31/01/2018) to lease a portion in extend of approximatily 240 hectares of the Farm Hentiesbaai Town and Townlands No. 133 by private treaty to construct and commission an eco-friendly seawater desalination plant. The proponent needs an Environmental Clearance Certificate for them to commence with the proposed activity.
The Environmental Clearance Certificate is required for the establishment of a Golf Estate at Portion 217 - 219 of Portion 193 of Walvis Bay Town and Townlands No. 1 and a street portion. A number of activities such as re-zoning, construction, site clearance will be undertaken among which cannot be undertaken without authorization from the Environmental Commissioner.
The Environmental Clearance Certificate is required for the establishment of Orange River Farm which is located at Hohenfels in the Oranjemund area in the //Kharas Region. The farm will be producing crops mainly vegetables and fruits for local consumption.
The application is for a renewal of the Environmental Clearance Certificate for the transportation of Tantalite Ore from Umeis Farm known as Namibia Tantalite Mine which is owned and operated by African Tantalum (Pty) Ltd. The Mine is located approximately 90 km south of Karasburg in the Warmbad Area. The initial Environmental Clearance Certificate was issued on 23 April 2018 for a period of three (3) years and will be ending on 23 April 2021.
The renewal of ECC is required for installing a water pipeline for the abstraction of water from the Orange River to Namibia Tantalite Investment Mine at Umeis Farm 110 in Warmbad area in //Kharas Region. The initial ECC was obtained in March 2018 and the proponent has not yet completed the installation of the necessary infrastructures for abstraction and moving water from the river to the farm. Therefore, the proponent would require the ECC to be renewed for another three (3) years to enable them to complete the installation of the necessary infrastructures.
Transfer of Environmental Clearance certificate from Eco-Fuel CC to trade under Erongo Petroleum CC 2. There is no change of activities and no adverse environmental effect arising from the proposed amendment 3. To operate under the same EMP issued to Eco-Fuel cc.
The ECC is for the Exploration activities on Exclusive Prospecting Licenses 7405, 7406 and 7407 at Otjozondu village, Otjozondjupa region. The Prospecting programme will consist of both non-invasive and invasive methods. The non- invasive method consist topographical and geophysical survey followed by a mapping and rock chip phase. The invasive method consist of both reverse circulation and Diamond Core Drilling.
The Environmental Clearance Certificate is required for the establishment of an Orange River Farm and Rest Camp. This initiative is driven and supported by the Office of the Constituency Councillor for Oranjemund Constituency and implemented by local investors. The initiative is being implemented from scratch and thus the EIA needs to investigate what impact these activities will have on the community and environment where it is being implemented.
The Environmental Clearance Certificate is required for the continuation of the mining activities at Block 4 (Mining Licence No. 118 and 119) by Fourth Mining Company. The company has been mining precious and semi-precious stones at the same Block since 2002 and wishes to continue mining until their 14th April 2022 as per their Mining Licence validity period and beyond. The Proponent requires authorisation from the Environmental Commissioner for a period of three (3) years.
To renew environmental clearance of mwene Fuel Service Station at Omuntele , Oshikoto Region, That was expire .