These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal https://eia.meft.gov.na/.
The dates indicate the last date that it was/will be possible to comment on the project on the portal.
You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.
Explore your search results using the filter checkboxes, or amend your search or start a new search.
Ludi Namibia Mining and Investments (Pty) Ltd, herein referred to as the Proponent, holds mineral rights under Mining License (ML) No. 205, located in the Karibib District, Erongo Region. The ML was issued on March 19, 2019, and remains valid until March 18, 2029, encompassing a total area of 502.796 hectares. The current delineated marble resources within the license area amount to 32 million cubic meters and ongoing and planned exploration activities are projected to increase this resource fourfold.
| Attachment | Size |
|---|---|
| 5236_EIA_ML No 205_Karibib District.pdf | 3.55 MB |
| 5236_SR_ML No 205_Karibib District.pdf | 1.99 MB |
| 5236_EMP_ML No 205_Karibib District.pdf | 181.27 KB |
| 5236_ECC Renewal_ML No 205_Karibib District.pdf | 674.73 KB |
| 5236_Map_ML No 205_Karibib District.pdf | 653.97 KB |
| 5236_CV_ML No 205_Karibib District.pdf | 193.31 KB |
| Attachment | Size |
|---|---|
| 5956_BID_EPL 10141_Okahandja District.pdf | 442.85 KB |
| 5956_SR_EPL 10141_Okahandja District.pdf | 5.22 MB |
| 5956_EMP_EPL 10141_Okahandja District.pdf | 495.44 KB |
| 5956_Archaeological Impact Assessment_EPL 10141_Okahandja District.pdf | 3.6 MB |
| 5956_ECC Application_EPL 10141_Okahandja District.pdf | 180.21 KB |
| 5956_Map_EPL 10141_Okahandja District.pdf | 561.59 KB |
| 5956_CV_EPL 10141_Okahandja District.pdf | 161.62 KB |
| Attachment | Size |
|---|---|
| 4726_SR_EPL No 9375 Grootfontein District.pdf | 3.98 MB |
| 4726_EMP_EPL No 9375 Grootfontein District.pdf | 296.88 KB |
| 4726_MME Grant_EPL No 9375 Grootfontein District.pdf | 1.42 MB |
| 4726_Proof of Consultation_EPL No 9375 Grootfontein District.pdf | 1.25 MB |
| 4726_Map_EPL No 9375 Grootfontein District.pdf | 140.21 KB |
| 4726_CV_EPL No 9375 Grootfontein District.pdf | 187.51 KB |
Renewal of expired ECC -0111 - to continue with the exploration activities.
3. MINING AND QUARRYING ACTIVITIES 3.2 The construction of facilities for any process or activities which requires a licence, right or other form of authorisation, and the renewal of a licence, right or other form of authorisation, in terms of the Minerals (Prospecting and Mining Act), 1992. 3.2 Other forms of mining or extraction of any natural resources whether regulated by law or not. 3.3 Resource extraction, manipulation, conservation and related activities. 3.4 The extraction or processing of gas from natural and non-natural resources.
Original Application Activities that triggered EIA process (EMA Regulations 2012) Activity 1 (a) Energy Generation, Transmission and Storage The construction of facilities for the generation of electricity. The construction of three 10 MW PV facilities is proposed. Activity 1 (b) Energy Generation, Transmission and Storage The construction of facilities for the transmission and supply of electricity. The construction of PV facilities entails associated infrastructure, including transmission lines and a small onsite substation to connect to existing substations.
| Attachment | Size |
|---|---|
| 129_ESPA_Renewal of Alten Solar Power Hardap.pdf | 765.78 KB |
| 129_Map_Renewal of Alten Solar Power Hardap.pdf | 229.8 KB |
10.1 The construction of: (j) masts of any material or type and of any height, including those used for telecommunication broadcasting and radio transmission, but excluding - (i) flag poles, and (ii) lightening conductor poles. In November 2021, the Namibian government issued a notice of award stating its intention to appoint HYPHEN Hydrogen Energy (Hyphen) as the preferred bidder to develop the country’s first large-scale export green hydrogen (H2) project within in two concession areas (namely Springbok and Dolphin) in the Tsau//Khaeb National Park.
TotalEnergies EP Namibia B.V. ("TEEPNA") is applying to renew its ECC to continue with the previously assessed and approved activities, including appraisal well drilling in Block 2913B. TEEPNA and its partners hold an Exploration Right over Block 2913B.
The proposed amendments to the ECC (16 May 2018) and specifically to the Project Description in the EIA Report (SLR, 2017) covers the following items: Geographical Area; Number of Exploration Wells; Timing; and ECC Validity Period.
For Groundwater Abstraction for industrial purposes.
| Attachment | Size |
|---|---|
| 1407_NBL_Environmental Performance Report and EMP.pdf | 2.27 MB |