These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal https://eia.meft.gov.na/.
The dates indicate the last date that it was/will be possible to comment on the project on the portal.
You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.
Explore your search results using the filter checkboxes, or amend your search or start a new search.
For the proposed construction and operation of a 15MW Solar Plant.
For the proposed development and operation of a recirculatory aquaculture production project.
For the development and operation of a 15MW merchant Solar Plant.
Construction of an eco-friendly low impact tourism and leisure facility on a 15ha plot in Ozondati Village, Ohungu Conservancy (Erongo Region).
| Attachment | Size |
|---|---|
| 2760_EIA_Quagga Camp and Leisure.pdf | 2 MB |
| 2760_EMP_Quagga Camp and Leisure.pdf | 295.61 KB |
| 2760_Support Letter_Quagga Camp and Leisure.pdf | 322.02 KB |
| 2760_Proof of Consultation_Quagga Camp and Leisure.pdf | 6.3 MB |
| 2760_Map_Quagga Camp and Leisure.pdf | 1.32 MB |
| 2760_Screening Notice_Quagga Camp and Leisure.pdf | 45.55 KB |
| 2760_CV_Quagga Camp and Leisure.pdf | 160.05 KB |
| 2760_BID_Quagga Camp and Leisure.pdf | 488.53 KB |
For the upgrading of an earth track already proclaimed as DR3417, from Andara Village to Shamaturu Village's clinic, via Mangamba Village. This is a 15km long road with a 30 meters wide road reserve, therefore total project footprint will be less than 50 hectares.
For the operation of a chemical and minerals storage warehouse in Walvis Bay.
ECC amendment application for the proposed construction and operation of 20MW merchant photovoltaic plant at on a 30ha piece of land at Farm Randveld No. 167 in Outjo district ,Otjozondjupa Region.
ECC amendment application for the proposed construction and operation of 80MW merchant photovoltaic plant at on a 230ha piece of land at Farm Randveld No. 167 in Outjo district ,Otjozondjupa Region.
For the installation and operation of a 48m lattice telecommunication tower.
For the installation and operation of a 80m guyed mast telecommunication tower.
Renewal of the existing Environmental Clearance Certificate 2. Change of project name from Elephant Ridge Camp to Ondjamba Hills.
| Attachment | Size |
|---|---|
| 2047_EMP_Ondjamba Hills Camp in Erongo Region.pdf | 212.7 KB |
| 2047_ECC Old_Ondjamba Hills Camp in Erongo Region.pdf | 113.64 KB |
| 2047_Map_Ondjamba Hills Camp in Erongo Region.pdf | 188.68 KB |
| 2047_Screening Notice_Ondjamba Hills Camp in Erongo Region.pdf | 42.89 KB |
For the minerals exploration activities on EPL 8148,8326 and 8056.
For the proposed construction and operation of a 120MW merchant solar photovoltaic plant.
For the installation and operation of a 600kWp Solar plant at Neudamm Unam Campus in Windhoek.
For the installation of a 410kWp Solar plant at Ogongo Unam Campus in Omusati Region.
For the installation and operation of 130kWp Solar plant at Rundu Unam Campus in Rundu, Kavango East region.
For the installation and operation of a 313kWp Solar plant at Unam main campus in Windhoek.
For the area covered and proposed exploration activities on EPL 8646 in Otjiwarongo and Grootfontein district in Otjozondjupa Region.
For the area covered by EPL 8746 and the proposed mineral exploration activities on the same EPL, the minerals are: Base and rare metals, industrial minerals and precious metals.
For the proposed construction and operation of a 5mw merchant Solar photovoltaic plant.
For the renewal of expired ECC, transfer of Environmental Clearance Certificate from Oshipaya Minerals cc to Luxury Investments 56 (PTY) Ltd and amendment of the EPL number that was mistakenly written as EPL 6906 instead of EPL 6909 on the ECC that was issued on the 5th of March 2019.
| Attachment | Size |
|---|---|
| 1155_EMP_EPL 6909 in Karibib District.pdf | 467.87 KB |
| 1155_ECC Old_EPL 6909 in Karibib District.pdf | 197.61 KB |
| 1155_Map_EPL 6909 in Karibib District.pdf | 360.98 KB |
| 1155_Screening Notice_EPL 6909 in Karibib District.pdf | 117.82 KB |
Renewal: Construction of a eco-friendly tourism tented camp.
For the ECC renewal of the proposed construction and operation of a chemical storage facility in Arandis.
ECC renewal for the construction of an eco-friendly lodge.
| Attachment | Size |
|---|---|
| 759_EMP_Damaraland Basalt Lodge in Kunene Region.pdf | 724.55 KB |
| 759_Map_Damaraland Basalt Lodge in Kunene Region.pdf | 280.19 KB |
| 759_Screening Notice_Damaraland Basalt Lodge in Kunene Region.pdf | 104.01 KB |
To allow for the upgrading of the 28km DR3662 to gravel standards. The road is already proclaimed.
| Attachment | Size |
|---|---|
| 720_ESIA_28km DR3662 to gravel standards.pdf | 1.85 MB |
| 720_ESMP_28km DR3662 to gravel standards.pdf | 608.03 KB |
| 720_Bidding Document_28km DR3662 to gravel standards.pdf | 1.37 MB |
| 720_Proof of Consultation_28km DR3662 to gravel standards.pdf | 524.71 KB |
| 720_Map_28km DR3662 to gravel standards.pdf | 392.71 KB |
| 720_Screening Notice_28km DR3662 to gravel standards.pdf | 87.29 KB |
For the minerals exploration activities on EPL 8281.
| Attachment | Size |
|---|---|
| 545_ESR_EPL 8281 in Uis District.pdf | 1.57 MB |
| 545_EMP_EPL 8281 in Uis District.pdf | 432.05 KB |
| 545_Consent Letter_EPL 8281 in Uis District.pdf | 1.43 MB |
| 545_Proof of Consultation_EPL 8281 in Uis District.pdf | 5.92 MB |
| 545_Map_EPL 8281 in Uis District.pdf | 223.9 KB |
| 545_Screening Notice_EPL 8281 in Uis District.pdf | 44.79 KB |
Proposed installation and operation of 15 camouflage towers within the municipal boundaries of Walvisbay.
For the proposed construction and operation of a mini shop, butchery and entertainment park in Etoshapoort, Outjo.
For the proposed upgrade and operation of a fuel retail facility on the existing Transnamib premises in Otjiwarongo.
Gravel road construction of DR3682 from Onaanda to Otamanzi (Omusati Region). This road is already a proclaimed road, since the 1990s.
Environmental Impact Assessment fot he proposed charcoal harvesting and construction of a charcoal production plant at M'bela No. 201 Farm et al., Okahandja District, Otjozondjupa Region.
Proposed construction and operation of a commercial fuel refill facility on existing Transnamib premises in Walvisbay.
Environmental Assessment for the area covered by EPL 7986 and proposed mineral exploration activities on EPL 7986 in Arandis, Erongo Region.
Road upgrading from a gravel road to a tar road (bitumen standards) The proposed project is located in the Kavango East Region in Northern Namibia. It involves the upgrading to bitumen standard of the District Road 3403 stretching from Divundu via Bagani and ending at Mohembo Border Post in the Kavango East Region in Northern Namibia. The District Road 3403 starts at the junction with TR8/4 in Divundu and follows a south easterly direction for 8km to Bagani. From Bagani the road follows a southerly direction towards the Mohembo border post between Namibia and Botswana.
The proposed road construction is a continuation of the DR3427 that starts in Tondoro Village along the B10 highway near Nkurenkuru. The initiation first phase construction was completed in 2015 from Tondoro to Mburu-Uru. This proposed construction aimed at completing the DR3427 construction from where the first phase ended in 2015. Thus the second phase seeks to complete the DR3427 from Mburu-Uru to Calikawo/Charlie Cutline/DR3446.
| Attachment | Size |
|---|---|
| 3188_EIASR_Construction to Gravel Standard DR3427.pdf | 1.45 MB |
| 3188_EMP_Construction to Gravel Standard DR3427.pdf | 1.52 MB |
| 3188_Map_Construction to Gravel Standard DR3427.pdf | 577.67 KB |
For the renewal of the Environmental Clearance Certificate and transfer of Environmental Clearance Certificate from Salute Petroleum cc to Salute Petroleum (PTY) Ltd.
Environmental Impact Assessment on the proposed exploration activities on EPL 6710 in Bethanie district, Karas Region.
Construction and operation of telecommunication lattice tower in Veddersdal, Okahandja.
Construction and operation of a 10MW Photovoltaic Solar Plant in Outjo district.
Proposed upgrade and operation of a chemical and mineral storage warehouse in Lüderitz, Karas Region.
Construction and operation of a fuel retail facility in Endola.
Construction and Operation of a fuel retail facility and Supermarket in Outapi, Erf 2541.
Construction and Operation of a fuel retail facility in Rundu.
Construction and operation of telecommunication lattice tower in Kalkfeld, Otjozondjupa Region.