This Environmental Management Plan (EMP) is developed as part of the application for the renewal of the Environmental Clearance Certificate (ECC) for the President’s Links Golf Resort and the adjacent residential area in Walvis Bay, Namibia. The purpose of this application is to revisit the existing EMP, assess its effectiveness, and determine if any modifications or additional measures are required to ensure continued compliance with environmental standards and regulations.
The amendment of conditions of establishment, the construction of a public road and the closing of public open space through statutory town planning procedures at Eheke settlement.
Rezoning of land from "General Industrial" to "Undetermined" and simultaneously for the construction of public roads, infrastructure and activities in water courses within flood lines through township establishments at Karibib to be known as Usab Extensions.
Construction of public roads and infrastructure, and construction activities within watercourses, through township establishments.
The ECC is for the establishment and operation of a self-catering tent lodge in the Sikunga Conservancy.
Construction of Infrastructure through Township Establishment at Okahao.
Environmental Clearance for, construction of public roads, infrastructure, and construction of other activities in watercourses within flood liens through Township Establishment. The Environmental Management Act (Act 7 of 2007), Section 8. Water Resource Developments; 8.8. Construction and other activities in watercourses within flood lines; 8.9. Construction and other activities within a catchment area; Section 10. Infrastructure: 10.1. The construction of- 10.1. (b) public roads; 10.2. Route determination of roads and design of associate physical infrastructure where- 10.2.
For infrastructure development through township establishment and layout planning within potential flood areas.