These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal http://eia.met.gov.na.
The dates indicate the last date that it was/will be possible to comment on the project on the portal.
You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.
Explore your search results using the filter checkboxes, or amend your search or start a new search.
Attachment | Size |
---|---|
3729_EMP_EPL 5046 Otjozondjupa Region.pdf | 341.46 KB |
3729_ECC Old_EPL 5046 Otjozondjupa Region.pdf | 1.87 MB |
3729_Map_EPL 5046 Otjozondjupa Region.pdf | 303.97 KB |
3729_Screening Notice_EPL 5046 Otjozondjupa Region.pdf | 89.35 KB |
3729_CV_EPL 5046 Otjozondjupa Region.pdf | 55.5 KB |
Title of Activity: Olulilwa Manganese Mining Nature of Activity: Mining (open cast) and mineral processing of Manganese Ore (Base and Rare Metals), transport to the port of Walvis Bay Location of Activity: The Mining Claim is located approximately 75km west of Opuwo Scale and Scope of Activity: Open cast mining of manganese.
1. Condition(s) on the Current Environmental Clearance Certificate: The continuation of small to medium scale quarrying for Sodalite Dimension Stone on Mining Claims 66887, 66888 and 66921 in Epupa Constituency, Kunene Region, Namibia 2. Proposed Amendment(s): The continuation of small to medium scale quarrying for Sodalite Dimension Stone and Semi-Precious Stones on Mining Claims 66887, 66888 and 66921 in Epupa Constituency, Kunene Region, Namibia 3.
Title of Activity: EPL6440 Exploration Project Nature of Activity: Exploration for Base and Rare Metals, Industrial Minerals, Precious Metals, Precious Stones, Semi-precious stones Location of Activity: Across the Erongo Mountains, 20km south of Omaruru, 30km north of Karibib (See attached maps – Annexures B to D) Scale and Scope of Activity: Geological mapping, rock grab and systematic trench sampling, road construction (blasting required in very rugged terrain), drilling (Reverse Circulation and diamond drilling techniques), bulk sampling including blasting.
Title of Activity: Renewal of the Environmental Clearance Certificate (ECC) for the mineral exploration activities for Base and Rare metals, Industrial minerals, Nuclear Fuel Minerals and Precious Metals commodities within EPL-3400. Nature of Activity: The minerals exploration activities in general including, mapping, sampling, geophysical surveys, drilling, pitting and trenching and bulk sampling within EPL3400.
Attachment | Size |
---|---|
212_Audit Report_EPL 3400 in the Khorixas district.pdf | 1.39 MB |
212_Map_EPL 3400 in the Khorixas district.pdf | 124.52 KB |
1. The Environmental Clearance Certificate is for: Activity 1(a) Energy generation, Transmission and Storage activities: The construction of facilities for the generation of electricity (solar and diesel power). Activity 1(b) Energy generation, Transmission and Storage activities: The construction of facilities for the transmission and supply of electricity (solar and diesel power). Activity 2.3 Waste Management, Treatment, Handling and Disposal activities: Temporary storage of waste. Activity 3.3 Mining and Quarrying activities: Resource manipulation and related activities.
1. The Environmental Clearance Certificate is for: Activity 10(b) Infrastructure: The construction of public roads. 2.1 Title of Activity: Subdivision of Erven 2167, 2168 and 2169, Extension 6, Hentiesbaai. 2.2 Nature of Activity: The activity entails the construction of public roads. 2.3 Location of Activity: Erven 2167, 2168 and 2169 are in Extension 6 (south dune), Hentiesbaai, which is located within the Erongo Region. 2.4 Scale and Scope of Activity: All three erven lie vacant and are fully serviced with municipal services (i.e.
The Environmental Clearance Certificate is for: Activity 1(A) Energy generation. transmission and storage activities. The construction of facilities for the generation of electricity (solar). Activity 1(B) Energy generation. transmission and storage activities.The construction of the transmission and supply of electricity. Activity 2.3 Waste management, treatment, handling and disposal activities. Temporary storage of waste. Activity 4 Forestry activities. Removal of protected species. Activity 5.1(d) Land use and development activities. Use for nature conservation.