Search results

EIA reports for public comment

These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal http://eia.met.gov.na.

The dates indicate the last date that it was/will be possible to comment on the project on the portal.

You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.

Explore your search results using the filter checkboxes, or amend your search or start a new search.

Displaying results 1 - 50 of 119
Wednesday, 6 August 2025
SM Dynamic Environmental Consultants 2025. 250515005809: Construction and operation of a self catering community campsite at Kasungwe in Malengalenga, Zambezi Region.
The client intends to establish a community campsite. The proposed activity presents a significant opportunity for the Malengalenga community to address socio-economic challenges while promoting wildlife conservation. By focusing on inclusive strategies that engage the youth and benefit the entire community, the initiative can create a sustainable path toward improved livelihoods and environmental stewardship.
Monday, 23 June 2025
SM Dynamic Environmental Consultants 2025. 250515005810: Construction and operation of a lodge on the Liadura Island in Nkasa Rupara National Park, Zambezi Region.

The proponent intends to establish a lodge development on Liadura Islands in the Nkasa Rupara National Park in the Zambezi Region. Liadura Island is situated at Sangwali in the Judea Lyamboloma Constituency. The Liadura Islands are situated between the Nkasa and Rupara Islands in the Nkasa Rupara National Park, which presents an exceptional and pristine natural environment. These Islands are characterised by their seclusion and expansive landscapes, which remain accessible even during the rainy season with the construction of wooden bridges.

Thursday, 20 March 2025
GCS Water and Environmental Consultants 2025. 241211005066: Environmental Assessment for the proposed construction and operation of a Telecommunication Tower in Aus, //Karas Region.
10.1 The construction of (g) masts of any material or type and of any height, including those used for telecommunication, broadcasting, and radio transmission.
Friday, 7 March 2025
GCS Water and Environmental Consultants 2025. 241211005068: Environmental Assessment for the proposed construction and operation of a Telecommunication Tower in Eheke, Oshana Region.
10.1 The construction of (g) masts of any material or type and of any height, including those used for telecommunication, broadcasting, and radio transmission.
Friday, 7 March 2025
GCS Water and Environmental Consultants 2025. 241211005069: Environmental Assessment for the proposed construction and operation of a Telecommunication Tower in Oikango, Oshana Region.
10.1 The construction of (g) masts of any material or type and of any height, including those used for telecommunication, broadcasting, and radio transmission.
Thursday, 6 March 2025
GCS Water and Environmental Consultants 2025. 241211005065: Environmental Assessment for the proposed construction and operation of a telecommunication tower in Keetmanshoop, //Karas Region.
10.1 The construction of (g) masts of any material or type and of any height, including those used for telecommunication, broadcasting, and radio transmission.
Wednesday, 5 March 2025
GCS Water and Environmental Consultants 2025. 241211005070: Environmental Assessment for the proposed construction and operation of a telecommunication tower in Onamundindi, Omusati Region.
10.1 The construction of (g) masts of any material or type and of any height, including those used for telecommunication, broadcasting, and radio transmission.
Monday, 3 February 2025
GCS Water and Environmental Consultants 2025. 241217005084: Environmental Clearance Certificate renewal for the proposed exploration drilling activities on Exclusive Prospecting Licence (EPL) 6669 in the Kunene Region.

Activity 3.1 (Mining and Quarrying) The construction of facilities for any process or activities which requires a licence, right or other form of authorisation, and the renewal of a licence, right or other form of authorisation, in terms of the Minerals (Prospecting and Mining Act), 1992. Activity 3.2 (Mining and Quarrying) Other forms of mining or extraction of any natural resources whether regulated by law or not. Activity 3.3(Mining and Quarrying) Resource extraction, manipulation, conservation and related activities.

Friday, 24 January 2025
SM Dynamic Environmental Consultants 2025. 241218005087: Operation and management of guided quad bike business inside Dorob National Park.
Operation recreational activity of guided quad bike business inside Dorob National Park.
Thursday, 2 January 2025
GCS Water and Environmental Consultants 2025. 240820004574: Operational Environmental Management Plan for quarrying activities on the existing borrow pit within Osona Village in Okahandja, Otjozondjupa Region.
Activity 3.2 (Mining and Quarrying Activities) Other forms of mining or extraction of any natural resources whether regulated by law or not. Activity 3.3 (Mining and Quarrying Activities): Resource extraction, manipulation, conservation and related activities.
Friday, 22 November 2024
GCS Water and Environmental Consultants 2024. 240311003030: Otjombinde Rural Water Supply Scheme in the Omaheke Region of Namibia.
For the proposed Otjombinde Rural Water Supply Scheme in the Omaheke Region of Namibia.
Sunday, 20 October 2024
SM Dynamic Environmental Consultants 2024. 240930004750: ECC renewal for Omulunga Extension 7 and 8 Township Establishment, Grootfontein, Otjozondjupa Region.

Renewal of the environmental clearance certificate for the Omulunga Extension 7 and 8 in Grootfontein Townland constituting about 643 erven for residential, business, open spaces, and undeterminedl and undetermined zonation.

Sunday, 8 September 2024
GCS Water and Environmental Consultants 2024. 240820004573: Operational Environmental Management Plan (EMP) for the existing Boplaas Campsite in the //Karas Region.
Activity 6 Tourism Development Activities - The construction of resorts, lodges, hotels or other tourism and hospitality facilities. Activity 11.2 Construction of cemeteries, camping, leisure and recreation sites.
Monday, 12 August 2024
GCS Water and Environmental Consultants 2024. 240522003761: Environmental Impact Assessment for the proposed construction and operation of Aquaculture and Fish Farming on Portion 60 (a Portion of Portion 24) of the Farm No 163 Swakopmund, Erongo Region.
Activity 7.1 Construction of facilities for aquaculture production, including mariculture and algae farms where the structures are not situated within an aquaculture development zone declared in terms of the Aquaculture Act, 2002. Activity 7.8 The introduction of alien species into local ecosystems. Activity 10.1 (a) The construction of oil, water, gas, and petrochemical and other bulk supply pipelines.
Wednesday, 10 July 2024
GCS Water and Environmental Consultants 2024. 240522003762: Environmental Clearance Certificate renewal for Osona Village Master Plan: comprising the remaining Township Establishments of Osona Village, creation of street, subdivision of erven and installation of bulk services in Okahandja, Otjozondjupa Region.

Activity 10.1 (a) (Infrastructure) The construction of - Oil, water, gas and petrochemical and other bulk supply pipelines. Activity 10.1 (b) (Infrastructure): The construction of - Public roads. Activity 10.2 (a) (Infrastructure): The route determination of roads and design of associated physical infrastructure where - it is a public road.

Thursday, 27 June 2024
GCS Water and Environmental Consultants 2024. 240507003550: Operational Environmental Management Plan (EMP) for the existing Daan Viljoen Lodge and Campsite, Khomas Region.
Activity 6 - Tourism Development Activities - The construction of resorts, lodges, hotels or other tourism and hospitality facilities. Activity 11.2 - Construction of cemeteries, camping, leisure, and recreation sites.
Thursday, 27 June 2024
GCS Water and Environmental Consultants 2024. 240507003551: Operational Environmental Management Plan (EMP) for the existing Windpomp 14 Campsite in the Erongo Region.
Activity 6 - Tourism Development Activities - The construction of resorts, lodges, hotels or other tourism and hospitality facilities. Activity 11.2 - Construction of cemeteries, camping, leisure, and recreation sites.
Tuesday, 30 January 2024
GCS Water and Environmental Consultants 2024. 231221002639: Environmental Assessment for the proposed construction and operation of a Telecommunication Tower in Oshikuku Extension 7, Oshikuku, Omusati Region.

10.1 The construction of (g) masts of any material or type and of any height, including those used for telecommunication, broadcasting, and radio transmission.

Tuesday, 30 January 2024
GCS Water and Environmental Consultants 2024. 231219002595: Environmental Assessment for the proposed construction and operation of a Telecommunication Tower in Omashaka Extension 39, Ondangwa, Oshana Region.

10.1 The construction of (g) masts of any material or type and of any height, including those used for telecommunication, broadcasting, and radio transmission.

Tuesday, 12 December 2023
GCS Water and Environmental Consultants 2023. 231101002400: Operational Environmental Management Plan (EMP) for the existing Khorixas Rescamp in the Kunene Region.

Activity 6 The construction of resorts, lodges, hotels or other tourism and hospitality facilities. Activity 8.6 Construction of industrial and domestic wastewater treatment plants and related pipeline systems Activity 11.2 Construction of cemeteries, camping, leisure and recreation sites.

Monday, 11 December 2023
GCS Water and Environmental Consultants 2023. 231101002394: Operational Environmental Management Plan (EMP) for the existing Popa Falls Resort in the Kavango East Region.

Activity 2.3 The import, processing, use and recycling, temporary storage, transit or export of waste. Activity 6 The construction of resorts, lodges, hotels or other tourism and hospitality facilities. Activity 8.1 The abstraction of ground or surface water for industrial or commercial purposes. Activity 8.3 Any water abstraction from a river that forms an international boundary. Activity 11.2 Construction of cemeteries, camping, leisure and recreation sites.

Monday, 11 December 2023
GCS Water and Environmental Consultants 2023. 231101002395: Environmental Clearance Certificate for Operational Environmental Management Plan (EMP) for the existing Waterberg Resort in the Otjozondjupa Region.

Activity 2.1 The construction of facilities for waste sites, treatment of waste and disposal of waste. Activity 6 Tourism Development Activities - The construction of resorts, lodges, hotels or other tourism and hospitality facilities. Activity 8.1 The abstraction of ground or surface water for industrial or commercial purposes. Activity 11.2 Construction of cemeteries, camping, leisure and recreation sites.

Monday, 11 December 2023
GCS Water and Environmental Consultants 2023. 231101002396: Operational Environmental Management Plan (EMP) for the existing Shark Island Rest Camp in the //Karas Region.

Activity 6 Tourism Development Activities - The construction of resorts, lodges, hotels or other tourism and hospitality facilities. Activity 11.2 Construction of cemeteries, camping, leisure and recreation sites.

Monday, 11 December 2023
GCS Water and Environmental Consultants 2023. 231101002397: Operational Environmental Management Plan (EMP) for the existing Hardap Resort in the Hardap Region.

Activity 6 The construction of resorts, lodges, hotels or other tourism and hospitality facilities. Activity 8.1 The abstraction of ground or surface water for industrial or commercial purposes. Activity 8.3 Any water abstraction from a river that forms an international boundary. Activity 11.2 Construction of cemeteries, camping, leisure and recreation sites.

Thursday, 23 November 2023
GCS Water and Environmental Consultants 2023. 230912002098: Environmental Assessment for the proposed construction and operation of a Telecommunication Tower in Ondangwa Extension 8, Ondangwa, Oshana Region.

10.1 The construction of (g) masts of any material or type and of any height, including those used for telecommunication, broadcasting, and radio transmission.

Monday, 13 November 2023
GCS Water and Environmental Consultants 2023. 231025002377: Environmental Clearance Certificate renewal for the proposed installation of MTC telecommunication structures on existing structures, streetlights or lamp poles, indoor sites, fibre optic cables and temporary sites throughout Namibia.

Activity10.1 (g) (Infrastructure) The construction of communication networks including towers, telecommunication and marine telecommunication lines and cables.

Monday, 6 November 2023
GCS Water and Environmental Consultants 2023. 230925002144: Environmental Assessment for the proposed construction and operation of a Telecommunication Tower in Rocky Crest Extension 1, Windhoek, Khomas Region.

10.1 The construction of (g) masts of any material or type and of any height, including those used for telecommunication, broadcasting, and radio transmission.

Friday, 3 November 2023
GCS Water and Environmental Consultants 2023. 230925002143: Environmental Assessment for the proposed construction and operation of a Telecommunication Tower in Rocky Crest Extension 4, Windhoek, Khomas Region.

10.1 The construction of (g) masts of any material or type and of any height, including those used for telecommunication, broadcasting, and radio transmission.

Friday, 3 November 2023
GCS Water and Environmental Consultants 2023. 230925002146: Environmental Assessment for the proposed construction and operation of a Telecommunication Tower in Katutura Extension 1, Windhoek, Khomas Region.

10.1 The construction of (g) masts of any material or type and of any height, including those used for telecommunication, broadcasting, and radio transmission.

Thursday, 2 November 2023
GCS Water and Environmental Consultants 2023. 230925002145: Environmental Assessment for the proposed construction and operation of a Telecommunication Tower in Katutura Extension 14, Windhoek, Khomas Region.

10.1 The construction of (g) masts of any material or type and of any height, including those used for telecommunication, broadcasting, and radio transmission.

Tuesday, 10 October 2023
GCS Water and Environmental Consultants 2023. 230912002100: Environmental Impact Assessment for the proposed construction and operation of a Telecommunication Tower in Oikokola Village (Etayi), Omusati Region.

10.1 The construction of (g) masts of any material or type and of any height, including those used for telecommunication, broadcasting, and radio transmission.

Tuesday, 10 October 2023
GCS Water and Environmental Consultants 2023. 230912002101: Environmental Impact Assessment for the proposed construction and operation of a Telecommunication Tower in Khoaeb Extension 4, Otavi, Otjozondjupa Region.

10.1 The construction of (g) masts of any material or type and of any height, including those used for telecommunication, broadcasting, and radio transmission.

Tuesday, 10 October 2023
GCS Water and Environmental Consultants 2023. 230912002102: Environmental Impact Assessment for the proposed construction and operation of a Telecommunication Tower in Otavi Extension 4, Otavi, Otjozondjupa Region.

10.1 The construction of (g) masts of any material or type and of any height, including those used for telecommunication, broadcasting, and radio transmission.

Tuesday, 10 October 2023
GCS Water and Environmental Consultants 2023. 230912002099: Environmental Assessment for the proposed construction and operation of a Telecommunication Tower in Oshikuku Extension 4, Oshikuku, Omusati Region.

10.1 The construction of (g) masts of any material or type and of any height, including those used for telecommunication, broadcasting, and radio transmission.

Monday, 24 July 2023
GCS Water and Environmental Consultants 2023. 230705001670: Environmental Clearance Certificate renewal for the operation and maintenance of Hobas Camp, //Karas Region.

Namibia Wildlife Resorts (NWR) is a state-owned enterprise, mandated to run the tourism facilities within the protected areas of Namibia. NWR has several operations across the country which are owned and managed by NWR. An Environmental Clearance Certificate (ECC) was granted on 7June 2017 to NWR for the operation and maintenance of the NWR Resort located in the /Ai-/Ais Richtersveld Transfrontier Park namely Hobas Camp.

Friday, 21 July 2023
GCS Water and Environmental Consultants 2023. 230413001295: Operational Environmental Management Plan (EMP) for the existing /Ai-/Ais Hotsprings and Spa Resort in the //Karas Region.

Namibia Wildlife Resorts (NWR) is a state-owned enterprise, mandated to run the tourism facilities within the protected areas of Namibia. NWR has several operations across the country which are owned and managed by NWR. Some of the facilities were constructed prior to the commencement of the Environmental Management Act (EMA) (7 of 2007). As such, Environmental Impact Assessments (EIA) were never conducted for these facilities. However, the facilities are still required to comply with the provisions of the EMA and its regulations.

Friday, 21 July 2023
GCS Water and Environmental Consultants 2023. 230705001672: Environmental Clearance Certificate renewal for the operation and maintenance of Naukluft Camp, Hardap Region.

Namibia Wildlife Resorts (NWR) is a state-owned enterprise, mandated to run the tourism facilities within the protected areas of Namibia. NWR has several operations across the country which are owned and managed by NWR. An Environmental Clearance Certificate (ECC) was granted on 7 November 2017 to NWR for the operation and maintenance of the NWR Resort located in the Naukluft National Park namely Naukluft Camp.

Friday, 21 July 2023
GCS Water and Environmental Consultants 2023. 230705001673: Operational Environmental Management Plan (EMP) for the existing Dead Valley Lodge in the Hardap Region.

Dead Valley Lodge has been created as a cooperative agreement between the public and private sector. As such, Sun Karros Lifestyle Safaris (Pty) Ltd and Namibia Wildlife Resorts (NWR) has a Public Private Partnership (PPP) in place for the management of Dead Valley Lodge. An Environmental Management Plan (EMP) was developed for the construction of the Dead Valley Lodge by WV Construction (Pty) Ltd. However, the EMP did not outline any management actions for the resort during the operational phase.

Wednesday, 19 July 2023
GCS Water and Environmental Consultants 2023. 230704001657: Environmental Clearance Certificate renewal for the operation and maintenance of Sesriem Camp, Hardap Region.

Namibia Wildlife Resorts (NWR) is a state-owned enterprise, mandated to run the tourism facilities within the protected areas of Namibia. NWR has several operations across the country which are owned and managed by NWR. An Environmental Clearance Certificate (ECC) was granted on 7 November 2018 to NWR for the operation and maintenance of the NWR Resorts located in the Naukluft National Park namely Sossus Dune Lodge and Sesriem Camp.

Wednesday, 19 July 2023
GCS Water and Environmental Consultants 2023. 230627001624: Environmental Clearance Certificate renewal for the Mining Claims 65425 and 65426 situated in Okatjimukuju, Farm 55, Karibib District, Erongo Region.

Environmental Clearance Certificate renewal for the Mining Claims 65425 and 65426 situated in Okatjimukuju, Farm 55, Karibib District, Erongo Region.

Wednesday, 19 July 2023
GCS Water and Environmental Consultants 2023. 230627001625: Environmental Clearance Certificate renewal for the Mining Claims 71547, 71548, 71549 and 71550 situated in Okatjimukuju, Farm 55, Karibib District, Erongo Region.

Environmental Clearance Certificate renewal for the Mining Claims 71547, 71548, 71549 and 71550 and Existing Mining Operations situated in Okatjimukuju, Farm 55, Karibib District, Erongo Region.

Wednesday, 19 July 2023
GCS Water and Environmental Consultants 2023. 230704001658: Environmental Clearance Certificate renewal for the operation and maintenance of Sossus Dune Lodge, Hardap Region.

Namibia Wildlife Resorts (NWR) is a state-owned enterprise, mandated to run the tourism facilities within the protected areas of Namibia. NWR has several operations across the country which are owned and managed by NWR. An Environmental Clearance Certificate (ECC) was granted on 7 November 2018 to NWR for the operation and maintenance of the NWR Resorts located in the Naukluft National Park namely Sossus Dune Lodge and Sesriem Camp.

Tuesday, 18 July 2023
GCS Water and Environmental Consultants 2023. 230424001353: Environmental Clearance Certificate renewal for the operation and maintenance of Namutoni Resort Etosha National Park.

Namibia Wildlife Resorts (NWR) is a state-owned enterprise, mandated to run the tourism facilities within the protected areas of Namibia. NWR has several operations across the country which are owned and managed by NWR. Some of the facilities were constructed prior to the commencement of the Environmental Management Act (EMA) (7 of 2007). As such, Environmental Impact Assessments (EIA) were never conducted for these facilities. However, the facilities are still required to comply with the provisions of the EMA and its regulations.

Tuesday, 18 July 2023
GCS Water and Environmental Consultants 2023. 230424001354: Environmental Clearance Certificate renewal for the operation and maintenance of Okaukuejo Resort Etosha National Park.

Namibia Wildlife Resorts (NWR) is a state-owned enterprise, mandated to run the tourism facilities within the protected areas of Namibia. NWR has several operations across the country which are owned and managed by NWR. Some of the facilities were constructed prior to the commencement of the Environmental Management Act (EMA) (7 of 2007). As such, Environmental Impact Assessments (EIA) were never conducted for these facilities. However, the facilities are still required to comply with the provisions of the EMA and its regulations.

Tuesday, 18 July 2023
GCS Water and Environmental Consultants 2023. 230424001355: Environmental Clearance Certificate renewal for the operation and maintenance of Olifantsrus Campsite Etosha National Park.

Namibia Wildlife Resorts (NWR) is a state-owned enterprise, mandated to run the tourism facilities within the protected areas of Namibia. NWR has several operations across the country which are owned and managed by NWR. An Environmental Clearance Certificate (ECC) was granted on 7 November 2018 to NWR for the operation and maintenance of the NWR Resorts located in the Etosha National Park (ENP) namely Okaukuejo, Namutoni, Halali, Dolomite, Olifantsrus and Onkoshi.

Tuesday, 18 July 2023
GCS Water and Environmental Consultants 2023. 230424001356: Environmental Clearance Certificate renewal for the operation and maintenance of Onkoshi Resort Etosha National Park.

Namibia Wildlife Resorts (NWR) is a state-owned enterprise, mandated to run the tourism facilities within the protected areas of Namibia. NWR has several operations across the country which are owned and managed by NWR. An Environmental Clearance Certificate (ECC) was granted on 7 November 2018 to NWR for the operation and maintenance of the NWR Resorts located in the Etosha National Park (ENP) namely Okaukuejo, Namutoni, Halali, Dolomite, Olifantsrus and Onkoshi.

Tuesday, 18 July 2023
GCS Water and Environmental Consultants 2023. 230413001293: Environmental Clearance Certificate renewal for the operation and maintenance of Dolomite Camp in the Etosha National Park.

Namibia Wildlife Resorts (NWR) is a state-owned enterprise, mandated to run the tourism facilities within the protected areas of Namibia. NWR has several operations across the country which are owned and managed by NWR. An Environmental Clearance Certificate (ECC) was granted on 7 November 2018 to NWR for the operation and maintenance of the NWR Resorts located in the Etosha National Park (ENP) namely Okaukuejo, Namutoni, Halali, Dolomite, Olifantsrus and Onkoshi.

Tuesday, 18 July 2023
GCS Water and Environmental Consultants 2023. 230424001352: Environmental Clearance Certificate renewal for the operation and maintenance of Halali Resort Etosha National Park.

Namibia Wildlife Resorts (NWR) is a state-owned enterprise, mandated to run the tourism facilities within the protected areas of Namibia. NWR has several operations across the country which are owned and managed by NWR. Some of the facilities were constructed prior to the commencement of the Environmental Management Act (EMA) (7 of 2007). As such, Environmental Impact Assessments (EIA) were never conducted for these facilities. However, the facilities are still required to comply with the provisions of the EMA and its regulations.

Not found what you are looking for? Amend your search...