These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal https://eia.meft.gov.na/.
The dates indicate the last date that it was/will be possible to comment on the project on the portal.
You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.
Explore your search results using the filter checkboxes, or amend your search or start a new search.
This application for an ECC renewal relates to Omuthiya Shell Service Station's intended ongoing activities. Operating a petrol filling station without an ECC is prohibited by the Environmental Management Act 7 of 2007 (Government Notice No. 29). The application is being submitted in order to meet the requirements of the Environmental Management Act (No. 7 of 2007) and its 2012 regulations.
The ECC application is for the proposed exploration and prospecting activities on EPL 8829. The application is conducted in compliance with the Environmental Management Act No.7 of 2007, and it regulations of 2012.
| Attachment | Size | 
|---|---|
| 1801_ESR_EPL 8829 Kharas Region.pdf | 1.74 MB | 
| 1801_EMP_EPL 8829 Kharas Region.pdf | 648.46 KB | 
| 1801_MME Grant_EPL 8829 Kharas Region.pdf | 242.37 KB | 
| 1801_Map_EPL 8829 Kharas Region.pdf | 352.78 KB | 
| 1801_Proof of Consultation_EPL 8829 Kharas Region.pdf | 2.23 MB | 
| 1801_Screening Notice_EPL 8829 Kharas Region.pdf | 295.92 KB | 
| 1801_BID_EPL 8829 Kharas Region.pdf.pdf | 465.67 KB | 
3. MINING AND QUARRYING ACTIVITIES 3.2 The construction of facilities for any process or activities which requires a licence, right or other form of authorisation, and the renewal of a licence, right or other form of authorisation, in terms of the Minerals (Prospecting and Mining Act), 1992. 3.2 Other forms of mining or extraction of any natural resources whether regulated by law or not. 3.3 Resource extraction, manipulation, conservation and related activities. 3.4 The extraction or processing of gas from natural and non-natural resources.
Original Application Activities that triggered EIA process (EMA Regulations 2012) Activity 1 (a) Energy Generation, Transmission and Storage The construction of facilities for the generation of electricity. The construction of three 10 MW PV facilities is proposed. Activity 1 (b) Energy Generation, Transmission and Storage The construction of facilities for the transmission and supply of electricity. The construction of PV facilities entails associated infrastructure, including transmission lines and a small onsite substation to connect to existing substations.
| Attachment | Size | 
|---|---|
| 129_ESPA_Renewal of Alten Solar Power Hardap.pdf | 765.78 KB | 
| 129_Map_Renewal of Alten Solar Power Hardap.pdf | 229.8 KB | 
10.1 The construction of: (j) masts of any material or type and of any height, including those used for telecommunication broadcasting and radio transmission, but excluding - (i) flag poles, and (ii) lightening conductor poles. In November 2021, the Namibian government issued a notice of award stating its intention to appoint HYPHEN Hydrogen Energy (Hyphen) as the preferred bidder to develop the country’s first large-scale export green hydrogen (H2) project within in two concession areas (namely Springbok and Dolphin) in the Tsau//Khaeb National Park.
TotalEnergies EP Namibia B.V. ("TEEPNA") is applying to renew its ECC to continue with the previously assessed and approved activities, including appraisal well drilling in Block 2913B. TEEPNA and its partners hold an Exploration Right over Block 2913B.
The proposed amendments to the ECC (16 May 2018) and specifically to the Project Description in the EIA Report (SLR, 2017) covers the following items: Geographical Area; Number of Exploration Wells; Timing; and ECC Validity Period.
For Groundwater Abstraction for industrial purposes.
| Attachment | Size | 
|---|---|
| 1407_NBL_Environmental Performance Report and EMP.pdf | 2.27 MB |