Search results

EIA reports for public comment

These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal http://eia.met.gov.na.

The dates indicate the last date that it was/will be possible to comment on the project on the portal.

You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.

Explore your search results using the filter checkboxes, or amend your search or start a new search.

Displaying results 1 - 4 of 4
Thursday, 23 March 2023
Extra Time Consulting 2023. 230301001079: Environmental Management Plan (EMP) for the construction and operation of diesel as well as the liquified petroleum gas (LPG) filling station at Erf I-316M Oniipa, Oshikoto Region, Namibia.

Construction and operation of diesel as well as the liquified petroleum gas (LPG) filling station at Erf I-316M Oniipa, Oshikoto Region, Namibia.

Wednesday, 8 February 2023
Extra Time Consulting 2023. 230123000881: EIA for processing and storage of the dimension stones in Karibib, Erongo Region, Namibia.

EIA for processing and storage of the dimension stones in Karibib, Erongo Region, Namibia.

Monday, 7 November 2022
SRK Consulting 2022. 221021000149: Environmental Impact Assessment process for the Cleaner Green Hydrogen Demonstration Plant in Walvis Bay, Erongo Region, Namibia.

Cleanergy Solutions Namibia (Pty) Ltd (hereafter referred to as Cleanergy), a Joint Venture between CMB.TECH and Ohlthaver & List (O&L) Group is proposing to construct a 5 Megawatt (MW) Green Hydrogen Demonstration Plant (GHDP) in Walvis Bay, Namibia. The project will also involve the construction of a 5 MWp Photovoltaic Solar (PV) power plant capable of producing green electricity that will be used to power the GHDP.