These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal http://eia.met.gov.na.
The dates indicate the last date that it was/will be possible to comment on the project on the portal.
You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.
Explore your search results using the filter checkboxes, or amend your search or start a new search.
Attachment | Size |
---|---|
5687_EMP_EPL 7297 Swakopmund_Arandis.pdf | 1.44 MB |
5687_Declaration of Authorship_EPL 7297 Swakopmund_Arandis.pdf | 77.69 KB |
5687_ECC Old_EPL 7297 Swakopmund_Arandis.pdf | 313.04 KB |
5687_Map_EPL 7297 Swakopmund_Arandis.pdf | 453.79 KB |
5687_Screening Notice_EPL 7297 Swakopmund_Arandis.pdf | 282.8 KB |
5687_CV_EPL 7297 Swakopmund_Arandis.pdf | 128.36 KB |
Attachment | Size |
---|---|
5719_EMP_EPL 7986 Arandis.pdf | 2.9 MB |
5719_Declaration of Authorship_EPL 7986 Arandis.pdf | 183.68 KB |
5719_ECC Old_EPL 7986 Arandis.pdf | 421.88 KB |
5719_Map_EPL 7986 Arandis.pdf | 475.5 KB |
5719_Screening Notice_EPL 7986 Arandis.pdf | 281.95 KB |
5719_CV_EPL 7986 Arandis.pdf | 128.36 KB |
Attachment | Size |
---|---|
5490_EMP_Khan Substation in Usakos.pdf | 1.81 MB |
5490_Declaration of Authorship_Khan Substation in Usakos.pdf | 212.04 KB |
5490_ECC Old_Khan Substation in Usakos.pdf | 122.09 KB |
5490_Map_Khan Substation in Usakos.pdf | 118.11 KB |
5490_Screening Notice_Khan Substation in Usakos.pdf | 143.7 KB |
5490_CV_Khan Substation in Usakos.pdf | 588.47 KB |
Construction of the Welwitchia University Swakopmund Campus at Ocean View in Swakopmund, Erongo Region The proposed development site is strategically located within the Ocean View suburb, north of Swakopmund's central business district (CBD), at Ocean View, Erf 3342 Swakopmund Extension 9. This site offers convenient access for students, staff, and patients, providing a tranquil environment conducive to focused learning and patient care. The location is approximately 6 kilometres from the CBD, with general site coordinates at 22.637591, and 14.536919.
The Upgrade Low Volume Seal (LVS) Standard of DR3425 (87km: Ncaute - Karukuvisa) in the Kavango East and Kavango West Regions; Upgrade Low volume seal (LVS) of the existing gravel road section and single-sandy track; Materials abstraction for construction purposes; Temporary opening of a detour route; Water abstraction for construction supply.
Renewal and amendment of the Environmental Management Plan (EMP) for the operation of Livingstone's Camp, Linyanti, Zambezi Region, Namibia.
Attachment | Size |
---|---|
2696_EMP_Livingstones Camp_Linyanti.pdf | 1.31 MB |
2696_Clearance Letter_Livingstones Camp_Linyanti.pdf | 144.73 KB |
2696_Map_Livingstones Camp_Linyanti.pdf | 182.5 KB |
2696_Screening Notice_Livingstones Camp_Linyanti.pdf | 67.18 KB |
2696_CV_Livingstones Camp_Linyanti.pdf | 131.58 KB |
Mineral Exploration Activities on EPL 8995, Arandis-Trekopje area, Erongo Region, Namibia.
Attachment | Size |
---|---|
2555_ESR_EPL 8995 in Erongo Region.pdf | 1.48 MB |
2555_ESMP_EPL 8995 in Erongo Region.pdf | 575.96 KB |
2555_ECC Old_EPL 8995 in Erongo Region.pdf | 15.67 KB |
2555_MME Grant_EPL 8995 in Erongo Region.pdf | 225.52 KB |
2555_Proof of Consultation_EPL 8995 in Erongo Region.pdf | 2.4 MB |
2555_Map_EPL 8995 in Erongo Region.pdf | 211.36 KB |
2555_NHC Consent_EPL 8995 in Erongo Region.pdf | 47.29 KB |
2555_Screening Notice_EPL 8995 in Erongo Region.pdf | 40.46 KB |
2555_CV_EPL 8995 in Erongo Region.pdf | 306.12 KB |
2555_BID_EPL 8995 in Erongo Region.pdf | 515.07 KB |
The Environmental Clearance Certificate (ECC) is required to enable mariculture development in Swakopmund townland. Prospective operators will be required to develop site-specific management plans focusing on the specific areas and species they would like to farm with. The Ministry of Fisheries and Marine Resources (MFMR) with support from the Benguela Current Commission (BCC) instituted the impact assessment study to enable the mariculture development in Namibia.
The Environmental Clearance Certificate is required to enable mariculture development in Walvis Bay (land-based aquaculture) and water-based aquaculture for Namport.
The Environmental Clearance Certificate is required for the development of the Mariculture sector in Lüderitz.
The environment clearance certificate is required for the continued operation of the briquette processing facility. This certificate is obtained to ensure that the project remains compliant with environmental legislation and regulations. It demonstrates the facility's commitment to responsible and eco-friendly practices, ensuring that it aligns with environmental regulations and contributes to the overall sustainability goals.
Energy generation for power grid supply.
Amendment on ECC APP3861to read portion 151and not portion 142.
Township establishment.
Exploration and mining copper.
Continued operation of an existing charcoal briquette facility.
Mineral exploration license for the base and rare metals, nuclear fuel minerals, precious metals on an area covering 42 785.0372 hectares.
Construction and operation of a fuel retail facility.
Construction and operation of a truck port and service station -storage of hazardous materials.
Setting up of an Electro-Winning plant to support the copper smelter plant.
Upgrade low volume seal of the existing gravel road. Materials abstraction for construction purposes. Temporary opening of a detour route.
Construction and operation of the proposed fuel retail facility.
Attachment | Size |
---|---|
1016_EIA_Tses Service Station_Kharas Region.pdf | 4.55 MB |
1016_ECC Old_Tses Service Station_Kharas Region.pdf | 602.87 KB |
1016_Map_Tses Service Station_Kharas Region.pdf | 225.33 KB |
1016_Screening Notice_Tses Service Station_Kharas Region.pdf | 139.98 KB |
Application for rezoning.
The Environmental Clearance Certificate is required to enable the extension of the Iitapa Okeeholongo Rural Water Supply Scheme Phase II in the Omusati Region. The proposed extensions are aimed at providing access to clean water to the nearby villages within the Okahao Constituency.
The applicant Charcoal warehouse cc, intends to continue operating a charcoal processing and packaging facility in Walvis Bay town.
Upgrade Low volume seal of the existing gravel road. Materials abstraction for construction purposes. Temporary opening of a detour route.
Rezoning and Subdivision of ERF 810, Rehoboth.
The ECC is required proposed New Township Establishment, Subdivision and Consolidation of Erven at Okahandja Town (Okahandja Extension 19) in Otjozondjupa Region.
The amendment is required to change ECC 00597 for the Operation of the Tantalite Valley Mine Project on ML 77 - Phase 1 including the Upgrading of existing Ore Processing Facilities and Reworking of Waste Rock Dumps outside Warmbad in //Karas Region to include mining and processing of Lithium Resources. The proponent would like to add Industrial Minerals as well as Dimension Stones on mineral groups on ML 77.
Attachment | Size |
---|---|
187_EMP_Tantalite Valley Mine on ML 77.pdf | 268.03 KB |
187_Map_Tantalite Valley Mine on ML 77.pdf | 1.11 MB |
Mineral exploration activities.
Mineral exploration activities.
Mineral exploration activities.
Mineral exploration activities.
The project involves the upgrading to bitumen standard of the existing gravel road; District Road 3616 stretching from Tsandi via Onesi ending at Epalela settlement where it junctions with the MR 92 (C46) road from Outapi to Ruacana in Omusati region in the Northern Namibia. During the construction phase the following materials will be required: -Road construction materials from new and existing burrow pits. -Raw water abstraction from nearby water sources and other potential water sources will be determined.
Township establishment.
The proponent, SA and B Global Resources (SA&B) intends to spearhead the establishment of the Namibia International Convention Centre in Windhoek. The proposed project will oversee the establishment different sub-projects as part of the development proposal. Phase 1 of the project entails: 1) Namibia International Convention Centre with a Wax Museum, Hall of Fame and Art Gallery; 2) 7- star hotel, and 4-star hotel 3) Shopping arcade. 4) ICT Hub 5) 5 Star Hotel.
The Environmental Clearance Certificate is required for the construction of the new charcoal storage and packaging plant in Arandis town in Erongo Region.
Township establishment and layout approval on consolidated Portion X (comprising of Portions 84 and 85) of Keetmanshoop Town And Townlands No.150, consisting of 93 erven and remainder to be known as Quiver Tree Industrial Park Proper. Industrial erven establishment.
Township establishment and layout approval on Portion 83 of Keetmanshoop Extension 1 Town And Townlands No.150, consisting of 31 Erven and remainder to be known as Quiver Tree Ext 1. Servicing and land development for industrial erven.
Environmental Management Plan -The upgrade and rehabilitation (construction activities) of Homs river bridge in Warmbad settlement. Abstraction of construction material (G5 and Sand) at an existing burrow pit in Warmabd settlement.