These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal https://eia.meft.gov.na/.
The dates indicate the last date that it was/will be possible to comment on the project on the portal.
You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.
Explore your search results using the filter checkboxes, or amend your search or start a new search.
Exploration and small-scale mining/quarrying activities of base and rare metals by local communities in Kunene region plays a role in the regional economy. This application process for obtaining mining claims (MCs) for exploration and possibly small-scale mining/quarrying activities in the Kunene region involved several key steps and adherence to specific regulations. (i) Since MCs in Namibia are exclusively granted to Namibian natural persons (individuals) or companies that are majority-owned by Namibian citizens, Ayam Cenam Mining cc was first registered and is majority Namibian-owned.
The proposed wind-surfing and kite-surfing water sport activities will take place in the Lüderitz lagoon 2. The proponent intends to enhance water surfing activities as follows: (a) Using an alternative method of optimizing speed by installing temporary floating water-based wave breakers, (b) Adding kite-surfing and (c) Increase the number of water surfing events from one event per year to 2 events per year. The operator who is currently approved by MEFT only operates wind-surfing in the Lüderitz lagoon 2 by digging and excavating a channel for speed optimization.
The Proponent ascribes to environmental, social, and governance (ESG) practices. The Proponent would like to meet demand for housing in Katima Mulilo Town but with minimal negative environmental and social impacts. The proponent understands Township Establishment of the proposed Katima Mulilo Extensions 55 and 56 on Erf 2818 Katima Mulilo Extension 10, creation of street and installation of services will have negative environmental and social impacts. For this reason, the Proponent commits to renew the current ECC before undertaking the proposed construction of houses.
Walvis Diving and Salavage cc would like to undertake underwater hull cleaning. The existing ECC (No. 01884) is expiring on 17 January 2025, and the proponent would like to renew the ECC in order to be able to provide underwater hull cleaning services within the Walvis Bay port, Walvis Bay, Namibia.
The ECC (Environmental Clearance Certificate) issued on 12 April 2019 to the Proponent (Tsiseb Communal Conservancy) to undertake the proposed project expired on 12 April 2021. Due to various constraints and challenges including the COVID-19, the Proponent was unable to undertake the proposed activity within the permissible 3 years period. The income generated from the existing lodge (Brandberg White Lady Lodge) was severely affected by the COVID-19 pandemic.
The proponent would like to construct and operate a 10 bed rooms lodge as well as other tourism facilities on the south side of the Ugab River (Erongo region). Furthermore, the proponent intends to construct on the north side of the Ugab River (Kunene region), staff accommodation facilities. This means the proposed site cuts across two regions, namely Kunene and Erongo regions. Furthermore, the proposed site falls within 2 Conservancies; namely, Sorris Sorris and Tsiseb. This is a listed activity and may not be undertake without an ECC; hence this application.
The ECC for this project was approved in April 2017. However, the ECC has expired because the proponent was unable to operate due to several constrains including funding. The proponent has secured funding and is ready to develop. However, the proponent understands the need to first consider the environment before undertaking development. For this reason, the proponent would like to renew the ECC and start operation of the campsite.
ECC is needed for the construction and operation fuel retail facility in Spitzkoppe, Erongo Region, Namibia.
ECC needed for construction and operation of Aquaponic Greenhouse Farming with complete Solar Plant.
ECC required to construct and operate a finfish cage aquaculture farm.
| Attachment | Size | 
|---|---|
| 285_EIA_Finfish Cage Aquaculture Farm_Luderitz.pdf | 2.58 MB | 
| 285_EMP_Finfish Cage Aquaculture Farm_Luderitz.pdf | 282.25 KB | 
| 285_Map_Finfish Cage Aquaculture Farm_Luderitz.pdf | 72.86 KB | 
To undertake in-water hull cleaning operations within the Walvis Port.
To construct and operate a private air-strip for leisure aircraft (non-military) operations at Brandberg White Lady Lodge.
3. MINING AND QUARRYING ACTIVITIES 3.2 The construction of facilities for any process or activities which requires a licence, right or other form of authorisation, and the renewal of a licence, right or other form of authorisation, in terms of the Minerals (Prospecting and Mining Act), 1992. 3.2 Other forms of mining or extraction of any natural resources whether regulated by law or not. 3.3 Resource extraction, manipulation, conservation and related activities. 3.4 The extraction or processing of gas from natural and non-natural resources.
Original Application Activities that triggered EIA process (EMA Regulations 2012) Activity 1 (a) Energy Generation, Transmission and Storage The construction of facilities for the generation of electricity. The construction of three 10 MW PV facilities is proposed. Activity 1 (b) Energy Generation, Transmission and Storage The construction of facilities for the transmission and supply of electricity. The construction of PV facilities entails associated infrastructure, including transmission lines and a small onsite substation to connect to existing substations.
| Attachment | Size | 
|---|---|
| 129_ESPA_Renewal of Alten Solar Power Hardap.pdf | 765.78 KB | 
| 129_Map_Renewal of Alten Solar Power Hardap.pdf | 229.8 KB | 
10.1 The construction of: (j) masts of any material or type and of any height, including those used for telecommunication broadcasting and radio transmission, but excluding - (i) flag poles, and (ii) lightening conductor poles. In November 2021, the Namibian government issued a notice of award stating its intention to appoint HYPHEN Hydrogen Energy (Hyphen) as the preferred bidder to develop the country’s first large-scale export green hydrogen (H2) project within in two concession areas (namely Springbok and Dolphin) in the Tsau//Khaeb National Park.
TotalEnergies EP Namibia B.V. ("TEEPNA") is applying to renew its ECC to continue with the previously assessed and approved activities, including appraisal well drilling in Block 2913B. TEEPNA and its partners hold an Exploration Right over Block 2913B.
Provision of underwater hull cleaning services, Walvis Bay.
The proposed amendments to the ECC (16 May 2018) and specifically to the Project Description in the EIA Report (SLR, 2017) covers the following items: Geographical Area; Number of Exploration Wells; Timing; and ECC Validity Period.
For Groundwater Abstraction for industrial purposes.
| Attachment | Size | 
|---|---|
| 1407_NBL_Environmental Performance Report and EMP.pdf | 2.27 MB |