Search results

EIA reports for public comment

These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal https://eia.meft.gov.na/.

The dates indicate the last date that it was/will be possible to comment on the project on the portal.

You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.

Explore your search results using the filter checkboxes, or amend your search or start a new search.

Displaying results 1 - 6 of 6
Wednesday, 29 September 2021
Enviro Dynamics 2021. APP-002973: Proposed Xaris Walvis Bay Power Plant and Gas Supply Facility - LNG power plant component, Walvis Bay District, Erongo Region.

To reflect change of ownership of the existing Environmental Clearance.

Wednesday, 29 September 2021
Enviro Dynamics 2021. APP-002972: Proposed Xaris Walvis Bay change of ownership - Xaris Power Plant and gas supply facility - natural gas pipeline, Walvis Bay District, Erongo Region.

To reflect change of ownership of the existing Environmental Clearance.

Tuesday, 24 August 2021
Enviro Dynamics 2021. APP-002870: Renewal of the Environmental Clearance Certificate for the construction of the 10MVA Solar Park in Oshakati, Oshana Region.

Renewal of the Environmental Clearance Certificate for the construction of the 10MVA Solar Park in Oshakati, Oshana Region.

Sunday, 15 August 2021
Enviro Dynamics 2021. APP-002712: Township establishment of a new estate on Portion 1 of Elisenenheim No 68, Windhoek, Khomas Region.

Renewal of ECC (a) The rezoning of land from residential use to commercial use; (also the rezoning of the entire portion to residential, commercial, "road", etc. (b) The construction of public roads (c) The route determination of roads and design of associated physical infrastructure where - it is a public road; (c)The construction of a bulk water supply line. All these items are considered in this process in an integrated way as one development. Even though not in the act, note the clearance of the tannery ponds for construction of residential units.

Friday, 2 April 2021
Enviro Dynamics 2021. APP-002426: Proposed construction and operation of the 50 MW IPPr Wind Park near Lüderitz, Karas Region.

The construction and operation of a 50MW Wind Park near Luderitz, in the Tsau Khaeb National Park, designated for an Independent Power Producer.

Thursday, 1 April 2021
Enviro Dynamics 2021. APP-001675: Proposed wind power plant near Lüderitz.

Proposed Wind Turbines on two sub-sites as described in the Background Information Document and the reports, including associated infrastructure particularly the required transmission lines and substations. ECC required for construction and operation.

Not found what you are looking for? Amend your search...