These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal https://eia.meft.gov.na/.
The dates indicate the last date that it was/will be possible to comment on the project on the portal.
You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.
Explore your search results using the filter checkboxes, or amend your search or start a new search.
To reflect change of ownership of the existing Environmental Clearance.
| Attachment | Size | 
|---|---|
| 2973_EMP_Xaris Walvis Bay Power Plant.pdf | 778.3 KB | 
| 2973_ECC_Xaris Walvis Bay Power Plant 2021.pdf | 2.38 MB | 
| 2973_BID_Xaris Walvis Bay Power Plant 2021.pdf | 165.78 KB | 
To reflect change of ownership of the existing Environmental Clearance.
| Attachment | Size | 
|---|---|
| 2972_BID_Xaris Power Plant and Gas Supply Facility.pdf | 165.78 KB | 
| 2972_Proof of Payment_Xaris Power Plant and Gas Supply Facility.pdf | 1.16 MB | 
| 2972_ECC_Xaris Power Plant and Gas Supply Facility.pdf | 2.38 MB | 
Renewal of the Environmental Clearance Certificate for the construction of the 10MVA Solar Park in Oshakati, Oshana Region.
| Attachment | Size | 
|---|---|
| 2870_EMP_Construction of the 10MVA Solar Park in Oshakati.pdf | 2.16 MB | 
| 2870_ECC_Construction of the 10MVA Solar Park in Oshakati.pdf | 616.96 KB | 
| 2870_Map_Construction of the 10MVA Solar Park in Oshakati.pdf | 706.99 KB | 
Renewal of ECC (a) The rezoning of land from residential use to commercial use; (also the rezoning of the entire portion to residential, commercial, "road", etc. (b) The construction of public roads (c) The route determination of roads and design of associated physical infrastructure where - it is a public road; (c)The construction of a bulk water supply line. All these items are considered in this process in an integrated way as one development. Even though not in the act, note the clearance of the tannery ponds for construction of residential units.
The construction and operation of a 50MW Wind Park near Luderitz, in the Tsau Khaeb National Park, designated for an Independent Power Producer.
Proposed Wind Turbines on two sub-sites as described in the Background Information Document and the reports, including associated infrastructure particularly the required transmission lines and substations. ECC required for construction and operation.