These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal http://eia.met.gov.na.
The dates indicate the last date that it was/will be possible to comment on the project on the portal.
You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.
Explore your search results using the filter checkboxes, or amend your search or start a new search.
Construct and operate two (2) 100m high guyed meteorological masts at two separate locations in the Tsau //Khaeb National Park, Karas Region. The masts stays require an open area of 80 m diameter. Site 1 coordinates are: -27,035180 - 15323706; - 27,081279 - 15,333276; - 27,072615 -15,384327; -27,028365 - 15370015. Site 2 coordinates are: -26,754767 - 15,229704; -26,789602 - 15,228319; -26,796897 - 15, 265570; -26,762654 - 15,260316.
Geologists will be doing work to determine if the mineralization is truly there, and this is called grassroots (non-invasive or surface ) exploration. Common non-invasive activities include: airborne satellite surveys, Ground based geological and geophysical prospecting and surveying; and Determining drill target areas. No invasive work, i.e. drilling or trenching will be done at this stage, and will require a follow up application.
Exploration Activities (sampling, mapping, clearing bush for tracks and drilling areas, drilling, bulk sampling) Mineral licence EPL4717 for industrial and non-nuclear fuel minerals.
Proposed Township Restablishment on 5 portions of the Ramainder of the Farm Opakapa Townlands no 517. Renewal of ECC Transfer of name from Veiinatobias Organisational and Sustainable Development Planner (Pty) Ltd to Okakarara Town Council The project has not yet been implemented and nothing to the baseline has changed.
Constructing a Tented Lodge.
Is for the proposed construction and operation of the two new 132kV transmission lines from Kuiseb substation, via Walmund substation up to and including the new Sekelduin substation Walvis bay / Swakopmund, Erongo region.
ECC Renewal for Geological Exploration. Documents will also be delivered to MET offices in Windhoek along with the revenue stamp.
Attachment | Size |
---|---|
1823_EMP_Exploration Prospecting Licence 5263.pdf | 577.09 KB |
1823_ECC_Exploration Prospecting Licence 5263.pdf | 487.42 KB |
1823_Map_Exploration Prospecting Licence 5263.pdf | 320.49 KB |
The Proposed route, construction and operation for the Windhoek-Rehoboth Freeway.
In 2012, Namwater initiated the Divundu Bulk Water Supply Scheme to provide potable, good quality, treated water to Bagani and Divundu, along the Eastern Okavango River (Map below). An EIA was completed for the project, and an Environmental Clearance Certificate was obtained for the construction, operation and decommissioning of the project.
Attachment | Size |
---|---|
940_EMP_Divundu Water Supply Extention Project.pdf | 1.81 MB |
Enviro Dynamics, Norman van Zyl (ID 68072700855) apply for the environmental clearance renewal of the 10 MV solar PV power plant at Ohorongo Cement Dated 12 July 2017 On behalf of SunEQ Four Investments (Namibia) Pty (Ltd).
Non- invasive exploration on fam Okanguati under EPL 6162-
Attachment | Size |
---|---|
1260_Draft EMP_Environmental Management Plan_EPL6162.pdf | 1009.17 KB |
1260_EMP_Environmental Management Plan_EPL6162.pdf | 1009.17 KB |
1260_Map_Environmental Management Plan_EPL6162.pdf | 62.12 KB |
1260_Consultation_Environmental Management Plan_EPL6162.pdf | 44.49 KB |
Amendment - Renewal of the Environmental Clearance Certificate issued on 10 October 2014. No changes was made to the project scope or impacts. Report changes made were: Park name was updated to Tsau//Khaeb (Sperrgebiet) National Park and categorised as IUCN Category II National Park. Updated IFC standards and Guidelines. Updated IUCN requirements and Critical Habitat Study Added Section 4.8 Critical Habitat Assessment Study Added Critical Habitat Assessment impact description under Section 5.1; 5.3.1.2 and 5.3.1.5 A Longitudinal Bird Impact Assessment over 1 year has been initiated.
Attachment | Size |
---|---|
446_ECC_Diaz Wind Power Transmission Line.pdf | 1.62 MB |
446_EMP_Diaz Wind Power Transmission Line.pdf | 586.06 KB |
446_Authority Consent_Diaz Wind Power Transmission Line.pdf | 14.68 KB |