These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal http://eia.met.gov.na.
The dates indicate the last date that it was/will be possible to comment on the project on the portal.
You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.
Explore your search results using the filter checkboxes, or amend your search or start a new search.
Attachment | Size |
---|---|
5466_EMP_ML44_Bogenfels in Karas Region.pdf | 2.1 MB |
5466_Declaration of Authorship_ML44_Bogenfels in Karas Region.pdf | 226.81 KB |
5466_ECC Old_ML44_Bogenfels in Karas Region.pdf | 103.43 KB |
5466_Map_ML44_Bogenfels in Karas Region.pdf | 87.13 KB |
5466_Screening Notice_ML44_Bogenfels in Karas Region.pdf | 96.13 KB |
5466_CV_ML44_Bogenfels in Karas Region.pdf | 11.37 KB |
Attachment | Size |
---|---|
5467_EMP_ML128C in Karas Region.pdf | 1.26 MB |
5467_Declaration of Authorship_ML128C in Karas Region.pdf | 227.71 KB |
5467_ECC Old_ML128C in Karas Region.pdf | 106.64 KB |
5467_Map_ML128C in Karas Region.pdf | 87.13 KB |
5467_Screening Notice_ML128C in Karas Region.pdf | 96.13 KB |
5467_CV_ML128C in Karas Region.pdf | 11.37 KB |
Proposed Exploration Activities of Base and Rare Metals on Mining Claim 74468.
Proposed exploration for base and rare metals on Mining Claim 74467 Kunene Region
Renewal - Proposed upgrade and construction of a freeway between Windhoek and Rehoboth, Khomas Region, Section 1A: Windhoek to Auaspoort Interchange.
Attachment | Size |
---|---|
2472_EMP_Windhoek to Auaspoort Interchange.pdf | 88.72 KB |
2472_BID_Windhoek to Auaspoort Interchange.pdf | 505.56 KB |
2472_ECC Renewal_Windhoek to Auaspoort Interchange.pdf | 6.88 MB |
2472_Screening Notice_Windhoek to Auaspoort Interchange.pdf | 93.42 KB |
Renewal - Proposed upgrade and construction of a freeway between Windhoek and Rehoboth, Khomas Region, Sections 1B and 2: Auaspoort Interchange to 15km North of Rehoboth.
Renewal - Proposed upgrade and construction of a freeway between Windhoek and Rehoboth, Khomas Region, Section 3: Potential Rehoboth Eastern Bypass and rehabilitation of T104/T105 South of Eastern Bypass.
Exploration activities for base and rare metals, industrial minerals, precious metals and semi-precious stones on mining claims on 73617, 73618, 73619, 73620 and 73621 in Kunene Region.
Proposed exploration activities for base and rare metals, industrial minerals, precious metals and semi-precious stones on Mining Claims 73612-73616 in Kunene Region.
Transfer of ECC: Construction, Operation and Maintenance of Wind Power Generation facility from Nampower Corporation PTY Ltd to CERIM LUDERITZ ENERGY PTY Ltd.
Renewal of existing ECC No: 01649.
Attachment | Size |
---|---|
2057_BID_Oshakati Premier Electric 10 MW Solar Park.pdf | 234.84 KB |
2057_ECC Old_Oshakati Premier Electric 10 MW Solar Park.pdf | 1010.55 KB |
2057_Map_Oshakati Premier Electric 10 MW Solar Park.pdf | 259.15 KB |
2057_Screening Notice_Oshakati Premier Electric 10 MW Solar Park.pdf | 182.66 KB |
Renewal of ECC No: 00299.
Construction and operation of a new 11kV 5.4km transmission line to supply the Cleanergy Site on Farm 58, Walvis Bay, Erongo Region.
Amendment to include the exploration of industrial minerals on Mining Claim 73017 in Erongo Region.
Proposed construction and operation of a copper processing plant.
Proposed exploration activities of base and rare metals on Mining Claim 73420 in Erongo Region.
Proposed exploration activities for base and rare metals, industrial minerals, precious metals and precious stones on Exclusive Prospecting Licence (EPL) 8616 in Khomas Region
Attachment | Size |
---|---|
295_ESR_EPL 8616 in Khomas Region.pdf | 1.99 MB |
295_EMP_EPL 8616 in Khomas Region.pdf | 548.72 KB |
295_ECC Application_EPL 8616 in Khomas Region.pdf | 67.13 KB |
295_Proof of Consultation_EPL 8616 in Khomas Region.pdf | 881.12 KB |
295_Map_EPL 8616 in Khomas Region.pdf | 183.62 KB |
295_Screening Notice_EPL 8616 in Khomas Region.pdf | 108.57 KB |
Renaming of EPL5028 to EPL7988 B - Transfer to new owner - from Epangelo Mining Company to Horn Metals Pty. Start invasive activity with limited target area drilling only (12 holes). Renewal of Environmental Clearance Certificate.
Renewal 02 - SunEQ Four Investments (Namibia) Pty (Ltd) 10 MV solar PV power plant at Ohorongo Cement.
ECC renewal township establishment on Erf 287, Otjimbingwe to be known as Otjimbingwe Extension 1.
ECC renewal existing feedmill and proposed storage warehouse on the Farm Otjihareva NO 62, Otjozodjupa Region.
A) Renewal of existing Environmental Clearance. B) Addition of 12 tented rooms to bring beds to 28 from the original 20. This application for amendment has already been submitted on 31 August 2022. This electronic submission is upon request by DEA staff member Damion Nchindo.
Attachment | Size |
---|---|
690_EMP_Twyfelfontein Adventure Camp Kunene Region.pdf | 1022.55 KB |
690_ECC Old_Twyfelfontein Adventure Camp Kunene Region.pdf | 258.18 KB |
690_Map_Twyfelfontein Adventure Camp Kunene Region.pdf | 166.59 KB |
690_Screening Notice_Twyfelfontein Adventure Camp Kunene Region.pdf | 191.02 KB |
ECC renewal application for Karingarab area in ML 43 and EPL 3749 for NAMDEB.
Renewal of ECC Abattoir, meat processing, canning. See project description in attached Scoping Report.
The listed activities applied for are (according to Section 1 of the Schedule of Listed Activities: The Construction and Operation of a 50MW Solar PV Plant, and 500m 33kV power line.
Renewal of ECC - proposed Diaz Wind Park, please consult with Mrs Saima Angula.
100MW Wind Power Park 100MW Solar Power Park Transmission Line with newly built substation.
Tented camp in the Big Five Concession.
Renewal of the Environmental Clearance Certificate for the Environmental Procedure Review of Namibia Diamond Trading Company hazardous materials life cycle.
Exploration, sampling and mining of diamonds, including the associated services on ML42.
ML44 contains diamond deflation deposits as well as pocket beach marine deposits. Although not high priority targets at this stage the long term strategy is to develop these diamond deposits further. Exploration on the pocket beaches will be conducted using drilling and sampling as well as probe drilling. The large diameter drilling operation will consist of a drill, a drilling additive mixing plant, a front end loader, a dump truck and a crane truck. Activities will also include marine based exploration and mining.
Attachment | Size |
---|---|
3560_EMP_ECC renewal application for ML44_2022.pdf | 3.85 MB |
3560_ECC_ECC renewal application for ML44.pdf | 393.14 KB |
Namdeb holds four mining licenses, of which ML128C is the only totally sea-based license. Exploration in the marine license areas previously involved the collection of large-scale multibeam bathymetry and seismic data, followed by a regional geological drilling and sampling campaign, which opened up several new areas in the mid-water region. This was followed by sampling and test mining, the latter which will continue for the ensuing period:2022-2025.
To reflect change of ownership of the existing Environmental Clearance.
Attachment | Size |
---|---|
2973_EMP_Xaris Walvis Bay Power Plant.pdf | 778.3 KB |
2973_ECC_Xaris Walvis Bay Power Plant 2021.pdf | 2.38 MB |
2973_BID_Xaris Walvis Bay Power Plant 2021.pdf | 165.78 KB |
To reflect change of ownership of the existing Environmental Clearance.
Attachment | Size |
---|---|
2972_BID_Xaris Power Plant and Gas Supply Facility.pdf | 165.78 KB |
2972_Proof of Payment_Xaris Power Plant and Gas Supply Facility.pdf | 1.16 MB |
2972_ECC_Xaris Power Plant and Gas Supply Facility.pdf | 2.38 MB |
Renewal of the Environmental Clearance Certificate for the construction of the 10MVA Solar Park in Oshakati, Oshana Region.
Attachment | Size |
---|---|
2870_EMP_Construction of the 10MVA Solar Park in Oshakati.pdf | 2.16 MB |
2870_ECC_Construction of the 10MVA Solar Park in Oshakati.pdf | 616.96 KB |
2870_Map_Construction of the 10MVA Solar Park in Oshakati.pdf | 706.99 KB |
Renewal of ECC (a) The rezoning of land from residential use to commercial use; (also the rezoning of the entire portion to residential, commercial, "road", etc. (b) The construction of public roads (c) The route determination of roads and design of associated physical infrastructure where - it is a public road; (c)The construction of a bulk water supply line. All these items are considered in this process in an integrated way as one development. Even though not in the act, note the clearance of the tannery ponds for construction of residential units.
The construction and operation of a 50MW Wind Park near Luderitz, in the Tsau Khaeb National Park, designated for an Independent Power Producer.