These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal http://eia.met.gov.na.
The dates indicate the last date that it was/will be possible to comment on the project on the portal.
You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.
Explore your search results using the filter checkboxes, or amend your search or start a new search.
Shanya Energy (Pty) Ltd (SE) (The Proponent) proposes to develop Warehousing and Storage Facilities for Oil and Gas Exploration and Production Support Services on a 5Ha reminder portion of land in the Walvis Bay Municipality, Erongo Region. The envisioned site will serve as a versatile hub accommodating various functions, including storage, warehousing, marine services, logistics, customs clearance, tubular services, fabrication, engineering works, manpower supply, training, and development.
3. MINING AND QUARRYING ACTIVITIES 3.2 The construction of facilities for any process or activities which requires a licence, right or other form of authorisation, and the renewal of a licence, right or other form of authorisation, in terms of the Minerals (Prospecting and Mining Act), 1992. 3.2 Other forms of mining or extraction of any natural resources whether regulated by law or not. 3.3 Resource extraction, manipulation, conservation and related activities. 3.4 The extraction or processing of gas from natural and non-natural resources.
Original Application Activities that triggered EIA process (EMA Regulations 2012) Activity 1 (a) Energy Generation, Transmission and Storage The construction of facilities for the generation of electricity. The construction of three 10 MW PV facilities is proposed. Activity 1 (b) Energy Generation, Transmission and Storage The construction of facilities for the transmission and supply of electricity. The construction of PV facilities entails associated infrastructure, including transmission lines and a small onsite substation to connect to existing substations.
Attachment | Size |
---|---|
129_ESPA_Renewal of Alten Solar Power Hardap.pdf | 765.78 KB |
129_Map_Renewal of Alten Solar Power Hardap.pdf | 229.8 KB |
10.1 The construction of: (j) masts of any material or type and of any height, including those used for telecommunication broadcasting and radio transmission, but excluding - (i) flag poles, and (ii) lightening conductor poles. In November 2021, the Namibian government issued a notice of award stating its intention to appoint HYPHEN Hydrogen Energy (Hyphen) as the preferred bidder to develop the country’s first large-scale export green hydrogen (H2) project within in two concession areas (namely Springbok and Dolphin) in the Tsau//Khaeb National Park.
TotalEnergies EP Namibia B.V. ("TEEPNA") is applying to renew its ECC to continue with the previously assessed and approved activities, including appraisal well drilling in Block 2913B. TEEPNA and its partners hold an Exploration Right over Block 2913B.
The proposed Industrial minerals exploration on EPL 8776 , Erongo Region The provision of the listed activities are as follows: Mining and quarrying activities 3.1 The construction of facilities for any process or activities which requires a license, right, or other forms of authorization, and the renewal of a license, right, or any other form of authorization in terms of Minerals (Prospecting and Mining Act), 1992. 3.2 Other forms of mining or extraction of natural resources whether regulated by law or not. 3.3 Resource extraction, manipulation, conservation, and related activities.
Proposed Industrial minerals (Gypsum) mining activities on Mining Claims 72972, 72973, 72974, 72975, 72976, 72977, 72978, 72979, 72980 and 72981, Erongo Region The provision of the listed activities are as follows: MINING AND QUARRYING ACTIVITIES 3.1 The construction of facilities for any process or activities which requires a license, right, or other forms of authorization, and the renewal of a license, right, or any other form of authorization in terms of Minerals (Prospecting and Mining Act), 1992.
The proposed industrial minerals (Gypsum) mining activities on Mining Claims 72982, 72983, 72984, 72985, 72986, 72987, 72988, 72989, 72990 and 72991, Erongo Region The provision of the listed activities are as follows: MINING AND QUARRYING ACTIVITIES 3.1 The construction of facilities for any process or activities which requires a license, right, or other forms of authorization, and the renewal of a license, right, or any other form of authorization in terms of Minerals (Prospecting and Mining Act), 1992.
Proposed activities related to the construction and operation of a charcoal processing and packaging facility on Erf 3112 in Otjiwarongo Industrial Area, Otjozondjupa Region. An area of approximately 2 - 3 hectares will be cleared to support the construction of the project’s facilities. The project triggers the following listed activities: Energy generation, transmission and storage activities 1. The construction of facilities for – (a) the generation of electricity; Waste management, treatment, handling and disposal activities 2.2.
The ECC is required for the following proposed activities: (i) Initial desktop exploration activities covering the review of existing information and all previous prospecting activities undertaken in the general area in order identify any potential target/s. This initial stage will also include the purchase and interpretation of the existing Government high resolution airborne geophysical data sets. No field-based visit or activities to be undertaken at this stage.
Attachment | Size |
---|---|
3301_EMP_EPL No 8226_Mariental Districts.pdf | 3.19 MB |
3301_EIA_EPL No 8226_Mariental Districts.pdf | 14.6 MB |
3301_Proof of Consultation_EPL No 8226_Mariental Districts.pdf | 8.09 MB |
3301_MME Notice_EPL No 8226_Mariental Districts.pdf | 2.96 MB |
3301_Map_EPL No 8226_Mariental Districts.pdf | 199.27 KB |
The ECC is required for the following proposed activities: (i) Initial desktop exploration activities covering the review of existing information and all previous prospecting activities undertaken in the general area in order identify any potential target/s. This initial stage will also include the purchase and interpretation of the existing Government high resolution airborne geophysical data sets. No field-based visit or activities to be undertaken at this stage.
The ECC is required for the following proposed activities: (i) Initial desktop exploration activities covering the review of existing information and all previous prospecting activities undertaken in the general area in order identify any potential target/s. This initial stage will also include the purchase and interpretation of the existing Government high resolution airborne geophysical data sets. No field-based visit or activities to be undertaken at this stage.
The ECC is required for the following proposed activities: (i) Initial desktop exploration activities covering the review of existing information and all previous prospecting activities undertaken in the general area in order identify any potential target/s. This initial stage will also include the purchase and interpretation of the existing Government high resolution airborne geophysical data sets. No field-based visit or activities to be undertaken at this stage.
Attachment | Size |
---|---|
3300_EIA_EPL No 8225 Mariental Districts.pdf | 14.49 MB |
3300_EMP_EPL No 8225 Mariental Districts.pdf | 3.01 MB |
3300_Proof of Consultation_EPL No 8225 Mariental Districts.pdf | 8.09 MB |
3300_MME Notice_EPL No 8225 Mariental Districts.pdf | 8.71 MB |
3300_Map_EPL No 8225 Mariental Districts.pdf | 199.46 KB |
The proposed exploration activities for base and rare metals, industrial minerals, and precious metals on Exclusive Prospecting License (EPL) 7304. The following are listed activities triggered by the proposed project under the Environmental Management Act, No 7 of 2007 and EIA. MINING AND QUARRYING ACTIVITIES (3.1) The construction of facilities for any process or activities which requires a licence, right or other form of authorisation, and the renewal of a licence, right or other form of authorisation, in terms of the Minerals (Prospecting and Mining) Act, No.
The proposed amendments to the ECC (16 May 2018) and specifically to the Project Description in the EIA Report (SLR, 2017) covers the following items: Geographical Area; Number of Exploration Wells; Timing; and ECC Validity Period.
For Groundwater Abstraction for industrial purposes.
Attachment | Size |
---|---|
1407_NBL_Environmental Performance Report and EMP.pdf | 2.27 MB |