These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal http://eia.met.gov.na.
The dates indicate the last date that it was/will be possible to comment on the project on the portal.
You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.
Explore your search results using the filter checkboxes, or amend your search or start a new search.
THE RENEWAL OF THE ENVIRONMENTAL CLEARANCE CERTIFICATE IS FOR: The upgrading of an existing 392Km Railway line located between Kranzberg Station and Tsumeb Station to improve safety and travel times and meet minimum SADC railway standards. The 'listed activities' that might be affected are listed below: INFRASTRUCTURE 10.1 The construction of – (c) railways and harbours. WATER RESOURCE DEVELOPMENTS 8.8 Construction and other activities in water courses within flood lines. FORESTRY ACTIVITIES Potential clearance of forest area (i.e.
It is for the existing waste disposal site in Eheke settlement. The renewal of the Environmental Clearance Certificate ensures monitoring and evaluation of the environment's performance.
It is for the existing oxidation ponds in Eheke settlement. It allows the continuation of operations of the oxidation ponds. The renewal of the Environmental Clearance Certificate ensures monitoring and evaluation of the environment's performance.
It is for the existing oxidation ponds in the Uukwangula settlement. It allows the for the continuation of operations of the oxidation ponds. The renewal of the Environmental Clearance Certificate ensures monitoring and evaluation of the environment's performance.
The applicant, Gaoxa Trading cc is scheduling to set up a service station on Erf 5, alongside C44 main road, West of Tsumkwe Settlement, Otjozondjupa Region. The proposed service station is to be named //AIHA Service Station. //Aiha is derived from a San language meaning “Chief” in Ju/’hoansi dialect, a symbol of forte in many African tribes. The construction of a service station is a listed activity, that requires an authorization and an environmental clearance certificate should be issued before construction begins. It is against this background that Mr.
This is the renewal of the Environment Clearance Certifiate for the EIA and EMP for the Development of Cemetery on Portion Y situated in Rockey Crest, Windhoek District, Khomas Region.
Attachment | Size |
---|---|
1013_EMP_Cemetery on Portion Y situated in Rockey Crest.pdf | 1023.06 KB |
1013_ECC Renewal_Cemetery on Portion Y situated in Rockey Crest.pdf | 643.8 KB |
1013_ECC_Cemetery on Portion Y situated in Rockey Crest.pdf | 831.94 KB |