Search results

EIA reports for public comment

These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal http://eia.met.gov.na.

The dates indicate the last date that it was/will be possible to comment on the project on the portal.

You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.

Explore your search results using the filter checkboxes, or amend your search or start a new search.

Displaying results 1 - 8 of 8
Tuesday, 12 November 2024
Consulting Services Africa 2024. 241017004820: Application for the renewal of an Environmental Clearance Certificate for the upgrade of an existing 392 km Railway line located between Kranzberg Station and Tsumeb Station.

THE RENEWAL OF THE ENVIRONMENTAL CLEARANCE CERTIFICATE IS FOR: The upgrading of an existing 392Km Railway line located between Kranzberg Station and Tsumeb Station to improve safety and travel times and meet minimum SADC railway standards. The 'listed activities' that might be affected are listed below: INFRASTRUCTURE 10.1 The construction of – (c) railways and harbours. WATER RESOURCE DEVELOPMENTS 8.8 Construction and other activities in water courses within flood lines. FORESTRY ACTIVITIES Potential clearance of forest area (i.e.

Tuesday, 22 August 2023
Quintessential Trading and Consultancy 2023. 230330001231: Construction of infrastructure and operation of an Abattoir on Portion 1 of Otjiwarongo Portion 15 NIDA Industrial Park, Otjiwarongo, Otjozondjupa Region, Namibia.

Environmental Scoping Assessment (ESA) for the proposed Construction of infrastructure and operation of an Abattoir on Portion 1 of Otjiwarongo Portion 15 NIDA Industrial Park, Otjiwarongo, Otjozondjupa Region, Namibia. The proposed abattoir will be a modern, state-of-the-art micro-slaughterhouse facility designed to process up to 8 cattle per day, 5 goats per day, 5 sheep per day and 10 pigs per week.

Thursday, 5 May 2022
Quintessential Trading and Consultancy 2022. APP-003260: Environmental Scoping Assessment (ESA) for the subdivision and rezoning of Public Open Spaces (POS) namely; POS Erf 231 and POS Erf 233 to erect ErongoRed Substations on a 120 sqm portion of each Erf at Matutura Proper, Swakopmund.

Quintessential Trading and Consultancy Pty Ltd has been instructed by the Municipality of Swakopmund to undertake all the statutory procedures to subdivide and rezone Public Open Spaces Erf 231 measuring; 2556 sqm and Erf 233 measuring 6261 sqm located at; Matutura Proper/Block 18 a Portion of 141 ( A Portion of Portion 137) of the Farm Swakpomund Town and Townlands No 41 in the Municipality of Swakopmund measuring 22,4518 hectares, comprising of 233 erven (numbered 1-230, 3 public spaces numbered 231-233, Institutional and Remainder Streets.

Tuesday, 24 August 2021
Quintessential Trading and Consultancy 2021. APP-002445: Environmental Clearance Certificate for the Township Establishment on Block 23, Matutura, Proper, remainder of Portion 5 of Swakopmund Town and Townlands No.41, Erongo Region.

The MET has approved and issued the following ECC's to the Swakopmund Municipality; -ECC Renewal: Environmental Clearance Certificate for the Township Establishment on Block 23, Matutura, Remainder of Portion 5 of Swakopmund Town and Townlands No.41 Erongo Region - 20 April 2017 -Environmental Clearance for the Environmental Baseline Assessment for the Proposed township establishment on Portions A, B and C of the Remainder of Portion B of Swakopmund Town and Townlands No 41, Erongo Region -21 May 2014 -Environmental Clearance for the Formalisation of DRC Informal Settlement, Township Establ

Thursday, 22 July 2021
Consulting Services Africa 2021. APP-002752: Operations and management of oxidation ponds in Uukwangula settlement, Oshana region.

It is for the existing oxidation ponds in the Uukwangula settlement. It allows the for the continuation of operations of the oxidation ponds. The renewal of the Environmental Clearance Certificate ensures monitoring and evaluation of the environment's performance.

Thursday, 22 July 2021
Consulting Services Africa 2021. APP-002755: Renewal of Environmental Clearance Certificate (ECC) for the existing waste disposal site in Eheke settlement, Oshana region.

It is for the existing waste disposal site in Eheke settlement. The renewal of the Environmental Clearance Certificate ensures monitoring and evaluation of the environment's performance.

Thursday, 22 July 2021
Consulting Services Africa 2021. APP-002754: Renewal of Environmental Clearance Certificate (ECC) for the existing oxidation ponds in Eheke settlement, Oshana region.

It is for the existing oxidation ponds in Eheke settlement. It allows the continuation of operations of the oxidation ponds. The renewal of the Environmental Clearance Certificate ensures monitoring and evaluation of the environment's performance.

Wednesday, 8 April 2020
Consulting Services Africa 2020. APP-001013: Environmental Clearance Certificate renewal for the EIA and EMP for the Development of Cemetery on Portion Y situated in Rockey Crest, Windhoek District, Khomas Region.

This is the renewal of the Environment Clearance Certifiate for the EIA and EMP for the Development of Cemetery on Portion Y situated in Rockey Crest, Windhoek District, Khomas Region.

Not found what you are looking for? Amend your search...