These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal http://eia.met.gov.na.
The dates indicate the last date that it was/will be possible to comment on the project on the portal.
You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.
Explore your search results using the filter checkboxes, or amend your search or start a new search.
Previous ECC expired in November 2023, while Stone Quarrying operations are expected to continue into the future.
To do quarrying activities at Dorob National Park as per Authorization and Lease Agreement entered into between the Government of the Republic of Namibia, represented by the Ministry of Works and Transport and the Ministry of Environment, Forestry and Tourism and Waken Contractors Close Corporation, represented by Mrs. Freddie Hambeleleni Elifas.
The environmental clearance certificate is for the operation of an accommodation facility outside of a town. The Cheetah Conservation Fund (CCF) a section 21 company engaged in education, research, and conservation activities wishes to register some of the staff and visitor housing on the main campus for use as public accommodation facilities. This involves four structures with a total of nine bedrooms. All are located on the main campus of CCF at Farm Elandsvreugde, 44km outside Otjiwarongo on road D2440.
Attachment | Size |
---|---|
2453_EMP_Renewal of an ECC for a tourism establishment.pdf | 1.44 MB |
2453_ECC_Renewal of an ECC for a tourism establishment.pdf | 259.65 KB |
2453_Map_Renewal of an ECC for a tourism establishment.pdf | 259.45 KB |
ECC Renewal for Green Energy - Solar Power Plant "Omaere Solar Plant" Establishment.
Application for an Environmental Clearance Certificate.
The Renewal of the Environmental Clearance Certificate is for: Continuation of the Solar Power Plant operation project on ML 142, for which an Environmental Clearance was obtained during September 2017 (see attached Appendix B to the cover letter), which requires authorisation in terms of the Environmental Management Act, 2007 (Act 7 of 2007) i.e. Energy Generation, Transmission and Storage activities. Title of Activity: Continuation of the Solar Power Plant operation project on ML 142.
For Mining Claim to do Industrial Minerals and Dimension Stone Mining.
Attachment | Size |
---|---|
1559_ESR_El Milagro Stone Project.pdf | 815.14 KB |
1559_ECC_El Milagro Stone Project.pdf | 631.44 KB |
1559_Map_El Milagro Stone Project.pdf | 1.45 MB |
The Renewal of the Environmental Clearance Certificate is for: Continuation of an existing mining activity, for which an Environmental Clearance was obtained during June 2017, which requires authorisation in terms of the Minerals (Prospecting and Mining) Act (No. 33 of 1992). 2. Details of the Activity(s) covered by the Environmental Clearance Certificate: 2.1 Title of the Activity: Continuation of the mining for mineral dimension stone (i.e. marble and granite) on ML 142 hold by Namibia Marble and Granite (PTY) Ltd. (NAMAGRA).
Attachment | Size |
---|---|
1483_ECC_Mining Licence ML142 Karibib District.pdf | 372.04 KB |
1483_EIA_Mining Licence ML142 Karibib District.pdf | 2.41 MB |
1483_Scoping Report_Mining Licence ML142 Karibib District.pdf | 212.07 KB |