Search results

EIA reports for public comment

These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal http://eia.met.gov.na.

The dates indicate the last date that it was/will be possible to comment on the project on the portal.

You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.

Explore your search results using the filter checkboxes, or amend your search or start a new search.

Displaying results 1 - 12 of 12
Friday, 20 September 2024
Chameleon Environmental 2024. 240415003216: Renewal application of the existing ECC (ECC - 01359): Proposed operation of a temporary bitumen storage and bitumen emulsion production facility in Arandis, Namibia.
The existing valid ECC was issued for the proposed establishment of a bitumen storage and bitumen emulsion production facility in Arandis Industrial township. The products stored and produced are road surfacing material to be used for the upgrading rehabilitation and construction of the existing and new road infrastructure in the Arandis region.
Thursday, 16 May 2024
Chameleon Environmental 2024. 240227002886: Renewal of existing ECC for the proposed operation of a temporary bitumen storage and bitumen emulsion production facility in Arandis, Namibia.

Proposed operation of a temporary bitumen storage and bitumen emulsion production facility in Arandis, Namibia Nature of Activity: Storage and production of road surfacing material (bitumen and bitumen emulsions) Location of Activity: Erf 112, Arandis Industrial Township Scale and Scope of Activity: The bitumen storage and bitumen emulsion production facility is a small operation and designed as a closed unit. The storage and production facility has an actual footprint of approximately 500m². The site surface covers 1100m².

Monday, 23 August 2021
Potgieter Consultancy 2021. APP-002879: Renewal of Environmental Clearance: Nkasa Linyanti Camp.

Renewal of EC: tented safari camp in Nkasa Rupara National Park.

Monday, 28 June 2021
Potgieter Consultancy 2021. APP-002727: Operations and management of Anderssons Lodge in Kunene Region.

Renewal of clearance for the lodge Anderssons at Ongava.

Monday, 28 June 2021
Potgieter Consultancy 2021. APP-002729: Operations and management of Ongava Game Lodge, Kunene Region.

Renewal of Environmental Clearance for a safari lodge..

Monday, 28 June 2021
Potgieter Consultancy 2021. APP-002730: Operation and management of Little Ongava Lodge, Kunene Region.

enewal of Environmental Clearance for a safari lodge.

Monday, 28 June 2021
Potgieter Consultancy 2021. APP-002731: Operations and management of Ongava Tented Camp in Kunene Region.

Renewal of Environmental Clearance for a safari lodge.

Sunday, 9 May 2021
Potgieter Consultancy 2021. APP-002491: Operation and management of the Mushara Lodge on the farm Kleinbegin in the Oshikoto Region.

An existing eco-lodge, in operation since 1998. Activities: accommodation, meals and game drives.

Thursday, 6 May 2021
Potgieter Consultancy 2021. APP-002538: Mushara Outpost.

Safari lodge: accommodation, meals, game drives into Etosha National Park.

Thursday, 6 May 2021
Potgieter Consultancy 2021. APP-002537: Mushara Bush Camp.

Safari lodge on privately owned land: accommodation, meals, game drives to Etosha National Park.

Thursday, 18 March 2021
Chameleon Environmental 2021. APP-002291: Renewal application for the existing EEC for the bitumen storage and bitumen emulsion production facility in Arandis Industrial, Erongo Region.

Application for the renewal of the existing ECC that expires on 31 May 2021.

Monday, 13 April 2020
Potgieter Consultancy 2020. APP-001110: Skeleton Coast Shipwreck Lodge.

Renewal of ECC for Shipwreck Lodge at the mouth of the Hoarusib River.

Not found what you are looking for? Amend your search...