These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal http://eia.met.gov.na.
The dates indicate the last date that it was/will be possible to comment on the project on the portal.
You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.
Explore your search results using the filter checkboxes, or amend your search or start a new search.
The Swakopmund Municipality plans to perform a thorough geotechnical assessment of the current sand mining borrow pits. This assessment aims to determine the remaining material reserves, formulate recommendations for effective management, and carry out an environmental impact assessment to address all associated environmental issues. Additionally, the municipality seeks to obtain an Environmental Clearance for the entire sand mining borrow pits site measuring 55.97 hectares.
Proposed operation of a temporary bitumen storage and bitumen emulsion production facility in Arandis, Namibia Nature of Activity: Storage and production of road surfacing material (bitumen and bitumen emulsions) Location of Activity: Erf 112, Arandis Industrial Township Scale and Scope of Activity: The bitumen storage and bitumen emulsion production facility is a small operation and designed as a closed unit. The storage and production facility has an actual footprint of approximately 500m². The site surface covers 1100m².
Application for the renewal of the existing ECC that expires on 31 May 2021.