These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal http://eia.met.gov.na.
The dates indicate the last date that it was/will be possible to comment on the project on the portal.
You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.
Explore your search results using the filter checkboxes, or amend your search or start a new search.
Proposed operation of a temporary bitumen storage and bitumen emulsion production facility in Arandis, Namibia Nature of Activity: Storage and production of road surfacing material (bitumen and bitumen emulsions) Location of Activity: Erf 112, Arandis Industrial Township Scale and Scope of Activity: The bitumen storage and bitumen emulsion production facility is a small operation and designed as a closed unit. The storage and production facility has an actual footprint of approximately 500m². The site surface covers 1100m².
Seaflower Whitefish Corporation LTD was previously issued with an Environmental Clearance Certificate which expired in September 2022. As a result, the ECC needs to be renewed, hence the undertaking of this exercise to audit and update the Environmental Management Plant and renew the ECC.
Attachment | Size |
---|---|
565_EMP_Seaflower Whitefish Corporation.pdf | 1.52 MB |
565_ECC Old_Seaflower Whitefish Corporation.pdf | 227.49 KB |
565_Map_Seaflower Whitefish Corporation.pdf | 121.85 KB |
565_Screening Notice_Seaflower Whitefish Corporation.pdf | 44.94 KB |
Application for the renewal of the existing ECC that expires on 31 May 2021.