Search results

EIA reports for public comment

These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal http://eia.met.gov.na.

The dates indicate the last date that it was/will be possible to comment on the project on the portal.

You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.

Explore your search results using the filter checkboxes, or amend your search or start a new search.

Displaying results 1 - 5 of 5
Tuesday, 8 July 2025
Integrated Environmental Management Solutions 2025. 250621005957: ECC renewal for the proposed establishment of Otjomuise Extension 12 Township, portion of 304 of Farm Windhoek and Town Lands No. 31.
To implement the Environmental Management Plan for the proposed establishment of Otjomuise Extension 12 Township in Windhoek.
Friday, 20 September 2024
Chameleon Environmental 2024. 240415003216: Renewal application of the existing ECC (ECC - 01359): Proposed operation of a temporary bitumen storage and bitumen emulsion production facility in Arandis, Namibia.
The existing valid ECC was issued for the proposed establishment of a bitumen storage and bitumen emulsion production facility in Arandis Industrial township. The products stored and produced are road surfacing material to be used for the upgrading rehabilitation and construction of the existing and new road infrastructure in the Arandis region.
Thursday, 16 May 2024
Chameleon Environmental 2024. 240227002886: Renewal of existing ECC for the proposed operation of a temporary bitumen storage and bitumen emulsion production facility in Arandis, Namibia.

Proposed operation of a temporary bitumen storage and bitumen emulsion production facility in Arandis, Namibia Nature of Activity: Storage and production of road surfacing material (bitumen and bitumen emulsions) Location of Activity: Erf 112, Arandis Industrial Township Scale and Scope of Activity: The bitumen storage and bitumen emulsion production facility is a small operation and designed as a closed unit. The storage and production facility has an actual footprint of approximately 500m². The site surface covers 1100m².

Thursday, 18 March 2021
Chameleon Environmental 2021. APP-002291: Renewal application for the existing EEC for the bitumen storage and bitumen emulsion production facility in Arandis Industrial, Erongo Region.

Application for the renewal of the existing ECC that expires on 31 May 2021.

Friday, 28 February 2020
Integrated Environmental Management Solutions 2020. APP-001129: The proposed construction of the manufaturing plant for animal feed and charcoal/biochar on portion 1 (3 Ha) of portion 15 of the farm Otjowarongo townlands south No. 308.

The construction of the manufaturing plant for animal feed and charcoal/biochar on portion 1 (3 Ha) of portion 15 of the farm Otjowarongo townlands south No. 308

Not found what you are looking for? Amend your search...