These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal http://eia.met.gov.na.
The dates indicate the last date that it was/will be possible to comment on the project on the portal.
You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.
Explore your search results using the filter checkboxes, or amend your search or start a new search.
Environmental Impact Assessment and compilation of an Environmental Management Plan for the construction, operation, maintenance, and decommissioning of the proposed Karibib Powdered Activated Carbon (PAC) Plant and Ground Reservoir.
Environmental Impact Assessment and compilation of an Environmental Management Plan for the construction, operation, maintenance and decommissioning of the proposed Ondangwa to Omutsegwonime Phase 1 to 3 pipeline replacement. Oshana and Oshikoto Region. The proposed pipeline replacement will be constructed according to 3 phases: Phase 1: Ondangwa to Oshali (23 km) Phase 2: Oshali to Okatope (26.2 km) Phase 3: Okatope to Omuthiya (41 km).
Construction, operation, maintenance and decommissioning of the Omdel - Wlotzkasbaken pipeline replacement and pump station, Erongo Region. The proposed development has the following components: Pipeline replacement for Section 1 and 3 New pump station at Omdel Collector Reservoir. Salvation of the decommissioned DCI pipes in Section 4.
Construction of a new 33 kV overhead power line to be constructed along the existing roads (C44 and D3304) from Maroelaboom to Mangetti Dune in Otjozondjupa Region. The new overhead powerline will cover a distance of 125km.