These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal http://eia.met.gov.na.
The dates indicate the last date that it was/will be possible to comment on the project on the portal.
You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.
Explore your search results using the filter checkboxes, or amend your search or start a new search.
1. The Environmental Clearance Certificate is for: Activity 1(a) Energy generation, Transmission and Storage activities: The construction of facilities for the generation of electricity (solar and diesel power). Activity 1(b) Energy generation, Transmission and Storage activities: The construction of facilities for the transmission and supply of electricity (solar and diesel power). Activity 2.3 Waste Management, Treatment, Handling and Disposal activities: Temporary storage of waste. Activity 3.3 Mining and Quarrying activities: Resource manipulation and related activities.
1. The Environmental Clearance Certificate is for: Activity 10(b) Infrastructure: The construction of public roads. 2.1 Title of Activity: Subdivision of Erven 2167, 2168 and 2169, Extension 6, Hentiesbaai. 2.2 Nature of Activity: The activity entails the construction of public roads. 2.3 Location of Activity: Erven 2167, 2168 and 2169 are in Extension 6 (south dune), Hentiesbaai, which is located within the Erongo Region. 2.4 Scale and Scope of Activity: All three erven lie vacant and are fully serviced with municipal services (i.e.
Construction of a new 33 kV overhead power line to be constructed along the existing roads (C44 and D3304) from Maroelaboom to Mangetti Dune in Otjozondjupa Region. The new overhead powerline will cover a distance of 125km.
The Environmental Clearance Certificate is for: Activity 1(A) Energy generation. transmission and storage activities. The construction of facilities for the generation of electricity (solar). Activity 1(B) Energy generation. transmission and storage activities.The construction of the transmission and supply of electricity. Activity 2.3 Waste management, treatment, handling and disposal activities. Temporary storage of waste. Activity 4 Forestry activities. Removal of protected species. Activity 5.1(d) Land use and development activities. Use for nature conservation.