These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal http://eia.met.gov.na.
The dates indicate the last date that it was/will be possible to comment on the project on the portal.
You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.
Explore your search results using the filter checkboxes, or amend your search or start a new search.
The ECC is for the Angola-Namibia Transmission Interconnection Project. Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "construction of facilities for the transmission and supply of electricity" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. On 22 September 2020 NamPower was issued the Environmental Clearance Certificate for the Angola-Namibia (ANNA) 400kv transmission interconnection project.
Alten Solar Power Hardap (Pty) Ltd wish to renew their ECC, which expires end of June 2022, in order to continue operations at their Hardap Substation. The Following Regulations were triggered by the activities (Initial ECC Application): Activity 1 (a) Energy Generation, Transmission and Storage The construction of facilities for the generation of electricity. The construction of three 10 MW PV facilities is proposed. Activity 1 (b) Energy Generation, Transmission and Storage The construction of facilities for – the transmission and supply of electricity.
Renewal of Environmental Clearance Certificate.
Attachment | Size |
---|---|
3407_EMP_Desert Rhino Camp.pdf | 1.26 MB |
3407_ECC_Desert Rhino Camp.pdf | 63.19 KB |
3407_Map_Desert Rhino Camp.pdf | 319.62 KB |
Renewal of Environmental Clearance Certificate.
Attachment | Size |
---|---|
3408_EMP_Doro Nawas Camp.pdf | 1000.45 KB |
3408_ECC_Doro Nawas Camp.pdf | 65.61 KB |
3408_Map_Doro Nawas Camp.pdf | 209.66 KB |
Renewal of Environmental Clearance Certificate.
Attachment | Size |
---|---|
3409_EMP_Serra Cafema Lodge.pdf | 1.53 MB |
3409_ECC_Serra Cafema Lodge.pdf | 66.21 KB |
3409_Map_Serra Cafema Lodge.pdf | 708.67 KB |
Renewal of Environmental Clearance Certificate.
Attachment | Size |
---|---|
3410_EMP_Damaraland Adventure Camp.pdf | 1006.55 KB |
3410_ECC_Damaraland Adventure Camp.pdf | 64.87 KB |
3410_Map_Damaraland Adventure Camp.pdf | 165.61 KB |
Renewal of Environmental Clearance Certificate.
Attachment | Size |
---|---|
3404_EMP_Kulala Adventure Camp.pdf | 993 KB |
3404_ECC_Kulala Adventure Camp.pdf | 65.67 KB |
3404_Map_Kulala Adventure Camp.pdf | 135.75 KB |
Renewal of the Environmental Clearance certificate.
Attachment | Size |
---|---|
3403_EMP_Hoanib Skeleton Coast Camp.pdf | 1.27 MB |
3403_ECC Old_Hoanib Skeleton Coast Camp.PDF | 39.88 KB |
3403_Map_Hoanib Skeleton Coast Camp.pdf | 552.45 KB |
Environmental Clearance Certificate renewal.
Attachment | Size |
---|---|
3405_EMP_Kulala Desert Lodge.pdf | 1.28 MB |
3405_Map_Kulala Desert Lodge.pdf | 506.59 KB |
3405_ECC_Kulala Desert Lodge.pdf | 64.43 KB |
Renewal of Environmental Clearance Certificate.
Attachment | Size |
---|---|
3406_EMP_Little Kulala Lodge.pdf | 1.1 MB |
3406_ECC_Little Kulala Lodge.pdf | 66.4 KB |
3406_Map_Little Kulala Lodge.pdf | 195.62 KB |
The Environmental Clearance Certificate is for the construction and operation of the 55MW Photovoltaic (PV) Facility at Omaruru in the Erongo region. The ECC covers the PV facility , access road which connects to the C36 Gravel road and a 66kV transmission Line from the PV to Omburu substation. The facility is located on portion 183 (a portion of the farm portion B), of Omaruru Townlands no 85.
Renewal of Environmental Clearence Certificate for the proposed Auasblick Ext 1 Township Establishment.
Attachment | Size |
---|---|
2759_EIA_Auasblick Ext 1 Township Development in Windhoek.pdf | 4.28 MB |
2759_ECC_Auasblick Ext 1 Township Development in Windhoek.pdf | 904.24 KB |
2759_Map_Auasblick Ext 1 Township Development in Windhoek.pdf | 374.47 KB |