These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal https://eia.meft.gov.na/.
The dates indicate the last date that it was/will be possible to comment on the project on the portal.
You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.
Explore your search results using the filter checkboxes, or amend your search or start a new search.
The ECC is for the Angola-Namibia Transmission Interconnection Project. Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "construction of facilities for the transmission and supply of electricity" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. On 22 September 2020 NamPower was issued the Environmental Clearance Certificate for the Angola-Namibia (ANNA) 400kv transmission interconnection project.
3. MINING AND QUARRYING ACTIVITIES 3.2 The construction of facilities for any process or activities which requires a licence, right or other form of authorisation, and the renewal of a licence, right or other form of authorisation, in terms of the Minerals (Prospecting and Mining Act), 1992. 3.2 Other forms of mining or extraction of any natural resources whether regulated by law or not. 3.3 Resource extraction, manipulation, conservation and related activities. 3.4 The extraction or processing of gas from natural and non-natural resources.
Original Application Activities that triggered EIA process (EMA Regulations 2012) Activity 1 (a) Energy Generation, Transmission and Storage The construction of facilities for the generation of electricity. The construction of three 10 MW PV facilities is proposed. Activity 1 (b) Energy Generation, Transmission and Storage The construction of facilities for the transmission and supply of electricity. The construction of PV facilities entails associated infrastructure, including transmission lines and a small onsite substation to connect to existing substations.
| Attachment | Size |
|---|---|
| 129_ESPA_Renewal of Alten Solar Power Hardap.pdf | 765.78 KB |
| 129_Map_Renewal of Alten Solar Power Hardap.pdf | 229.8 KB |
10.1 The construction of: (j) masts of any material or type and of any height, including those used for telecommunication broadcasting and radio transmission, but excluding - (i) flag poles, and (ii) lightening conductor poles. In November 2021, the Namibian government issued a notice of award stating its intention to appoint HYPHEN Hydrogen Energy (Hyphen) as the preferred bidder to develop the country’s first large-scale export green hydrogen (H2) project within in two concession areas (namely Springbok and Dolphin) in the Tsau//Khaeb National Park.
TotalEnergies EP Namibia B.V. ("TEEPNA") is applying to renew its ECC to continue with the previously assessed and approved activities, including appraisal well drilling in Block 2913B. TEEPNA and its partners hold an Exploration Right over Block 2913B.
Alten Solar Power Hardap (Pty) Ltd wish to renew their ECC, which expires end of June 2022, in order to continue operations at their Hardap Substation. The Following Regulations were triggered by the activities (Initial ECC Application): Activity 1 (a) Energy Generation, Transmission and Storage The construction of facilities for the generation of electricity. The construction of three 10 MW PV facilities is proposed. Activity 1 (b) Energy Generation, Transmission and Storage The construction of facilities for – the transmission and supply of electricity.
The Environmental Clearance Certificate is for the construction and operation of the 55MW Photovoltaic (PV) Facility at Omaruru in the Erongo region. The ECC covers the PV facility , access road which connects to the C36 Gravel road and a 66kV transmission Line from the PV to Omburu substation. The facility is located on portion 183 (a portion of the farm portion B), of Omaruru Townlands no 85.
Renewal of Environmental Clearence Certificate for the proposed Auasblick Ext 1 Township Establishment.
| Attachment | Size |
|---|---|
| 2759_EIA_Auasblick Ext 1 Township Development in Windhoek.pdf | 4.28 MB |
| 2759_ECC_Auasblick Ext 1 Township Development in Windhoek.pdf | 904.24 KB |
| 2759_Map_Auasblick Ext 1 Township Development in Windhoek.pdf | 374.47 KB |
The proposed amendments to the ECC (16 May 2018) and specifically to the Project Description in the EIA Report (SLR, 2017) covers the following items: Geographical Area; Number of Exploration Wells; Timing; and ECC Validity Period.
For Groundwater Abstraction for industrial purposes.
| Attachment | Size |
|---|---|
| 1407_NBL_Environmental Performance Report and EMP.pdf | 2.27 MB |