These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal http://eia.met.gov.na.
The dates indicate the last date that it was/will be possible to comment on the project on the portal.
You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.
Explore your search results using the filter checkboxes, or amend your search or start a new search.
The ECC is for the Angola-Namibia Transmission Interconnection Project. Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "construction of facilities for the transmission and supply of electricity" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. On 22 September 2020 NamPower was issued the Environmental Clearance Certificate for the Angola-Namibia (ANNA) 400kv transmission interconnection project.
Alten Solar Power Hardap (Pty) Ltd wish to renew their ECC, which expires end of June 2022, in order to continue operations at their Hardap Substation. The Following Regulations were triggered by the activities (Initial ECC Application): Activity 1 (a) Energy Generation, Transmission and Storage The construction of facilities for the generation of electricity. The construction of three 10 MW PV facilities is proposed. Activity 1 (b) Energy Generation, Transmission and Storage The construction of facilities for – the transmission and supply of electricity.
The Environmental Clearance Certificate is for the construction and operation of the 55MW Photovoltaic (PV) Facility at Omaruru in the Erongo region. The ECC covers the PV facility , access road which connects to the C36 Gravel road and a 66kV transmission Line from the PV to Omburu substation. The facility is located on portion 183 (a portion of the farm portion B), of Omaruru Townlands no 85.
Renewal of EC: tented safari camp in Nkasa Rupara National Park.
Renewal of Environmental Clearence Certificate for the proposed Auasblick Ext 1 Township Establishment.
Attachment | Size |
---|---|
2759_EIA_Auasblick Ext 1 Township Development in Windhoek.pdf | 4.28 MB |
2759_ECC_Auasblick Ext 1 Township Development in Windhoek.pdf | 904.24 KB |
2759_Map_Auasblick Ext 1 Township Development in Windhoek.pdf | 374.47 KB |
Renewal of Environmental Clearance for a safari lodge..
enewal of Environmental Clearance for a safari lodge.
Renewal of Environmental Clearance for a safari lodge.
Renewal of clearance for the lodge Anderssons at Ongava.
An existing eco-lodge, in operation since 1998. Activities: accommodation, meals and game drives.
Safari lodge on privately owned land: accommodation, meals, game drives to Etosha National Park.
Attachment | Size |
---|---|
2537_EMP_Mushara Bush Camp.pdf | 2.18 MB |
2537_Map_Mushara Bush Camp.pdf | 1.93 MB |
Safari lodge: accommodation, meals, game drives into Etosha National Park.
Attachment | Size |
---|---|
2538_EMP_Mushara Outpost.pdf | 1.83 MB |
2538_Map_Mushara Outpost.pdf | 2.08 MB |
Renewal of ECC for Shipwreck Lodge at the mouth of the Hoarusib River.
Attachment | Size |
---|---|
1110_EIA_Skeleton Coast Shipwreck Lodge.pdf | 1.65 MB |
1110_ECC_Skeleton Coast Shipwreck Lodge.pdf | 127.39 KB |
1110_Operator_Skeleton Coast Shipwreck Lodge.pdf | 5.71 MB |