These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal http://eia.met.gov.na.
The dates indicate the last date that it was/will be possible to comment on the project on the portal.
You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.
Explore your search results using the filter checkboxes, or amend your search or start a new search.
The ECC is for the Angola-Namibia Transmission Interconnection Project. Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "construction of facilities for the transmission and supply of electricity" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. On 22 September 2020 NamPower was issued the Environmental Clearance Certificate for the Angola-Namibia (ANNA) 400kv transmission interconnection project.
The Proponent intends to conduct small-scale mining activities on Mining Claim 72453. The proposed activity requires an Environmental Clearance Certificate from the competent authority.
To install and make use of incinerators to burn animal carcasses and other wastes.
Exploration and mining activities for base and rare metals, dimension stone, industrial minerals and precious metals on EPL 8239 ǁKaras Region.
Attachment | Size |
---|---|
3758_ESAR_EPL 8239 Karas Region.pdf | 3.09 MB |
3758_EMP_EPL 8239 Karas Region.pdf | 1.2 MB |
3758_Proof of Consultation_EPL 8239 Karas Region.pdf | 1.92 MB |
3758_Map_EPL 8239 Karas Region.pdf | 153.06 KB |
3758_Screening Notice_EPL 8239 Karas Region.pdf | 159.74 KB |
Alten Solar Power Hardap (Pty) Ltd wish to renew their ECC, which expires end of June 2022, in order to continue operations at their Hardap Substation. The Following Regulations were triggered by the activities (Initial ECC Application): Activity 1 (a) Energy Generation, Transmission and Storage The construction of facilities for the generation of electricity. The construction of three 10 MW PV facilities is proposed. Activity 1 (b) Energy Generation, Transmission and Storage The construction of facilities for – the transmission and supply of electricity.
The Environmental Clearance Certificate is for the construction and operation of the 55MW Photovoltaic (PV) Facility at Omaruru in the Erongo region. The ECC covers the PV facility , access road which connects to the C36 Gravel road and a 66kV transmission Line from the PV to Omburu substation. The facility is located on portion 183 (a portion of the farm portion B), of Omaruru Townlands no 85.
Renewal of Environmental Clearence Certificate for the proposed Auasblick Ext 1 Township Establishment.
Attachment | Size |
---|---|
2759_EIA_Auasblick Ext 1 Township Development in Windhoek.pdf | 4.28 MB |
2759_ECC_Auasblick Ext 1 Township Development in Windhoek.pdf | 904.24 KB |
2759_Map_Auasblick Ext 1 Township Development in Windhoek.pdf | 374.47 KB |