These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal http://eia.met.gov.na.
The dates indicate the last date that it was/will be possible to comment on the project on the portal.
You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.
Explore your search results using the filter checkboxes, or amend your search or start a new search.
THE RENEWAL OF THE ENVIRONMENTAL CLEARANCE CERTIFICATE IS FOR: The upgrading of an existing 392Km Railway line located between Kranzberg Station and Tsumeb Station to improve safety and travel times and meet minimum SADC railway standards. The 'listed activities' that might be affected are listed below: INFRASTRUCTURE 10.1 The construction of – (c) railways and harbours. WATER RESOURCE DEVELOPMENTS 8.8 Construction and other activities in water courses within flood lines. FORESTRY ACTIVITIES Potential clearance of forest area (i.e.
The ECC is for the Angola-Namibia Transmission Interconnection Project. Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "construction of facilities for the transmission and supply of electricity" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. On 22 September 2020 NamPower was issued the Environmental Clearance Certificate for the Angola-Namibia (ANNA) 400kv transmission interconnection project.
Alten Solar Power Hardap (Pty) Ltd wish to renew their ECC, which expires end of June 2022, in order to continue operations at their Hardap Substation. The Following Regulations were triggered by the activities (Initial ECC Application): Activity 1 (a) Energy Generation, Transmission and Storage The construction of facilities for the generation of electricity. The construction of three 10 MW PV facilities is proposed. Activity 1 (b) Energy Generation, Transmission and Storage The construction of facilities for – the transmission and supply of electricity.
The Environmental Clearance Certificate is for the construction and operation of the 55MW Photovoltaic (PV) Facility at Omaruru in the Erongo region. The ECC covers the PV facility , access road which connects to the C36 Gravel road and a 66kV transmission Line from the PV to Omburu substation. The facility is located on portion 183 (a portion of the farm portion B), of Omaruru Townlands no 85.
It is for the existing oxidation ponds in Eheke settlement. It allows the continuation of operations of the oxidation ponds. The renewal of the Environmental Clearance Certificate ensures monitoring and evaluation of the environment's performance.
It is for the existing oxidation ponds in the Uukwangula settlement. It allows the for the continuation of operations of the oxidation ponds. The renewal of the Environmental Clearance Certificate ensures monitoring and evaluation of the environment's performance.
It is for the existing waste disposal site in Eheke settlement. The renewal of the Environmental Clearance Certificate ensures monitoring and evaluation of the environment's performance.
Renewal of Environmental Clearence Certificate for the proposed Auasblick Ext 1 Township Establishment.
Attachment | Size |
---|---|
2759_EIA_Auasblick Ext 1 Township Development in Windhoek.pdf | 4.28 MB |
2759_ECC_Auasblick Ext 1 Township Development in Windhoek.pdf | 904.24 KB |
2759_Map_Auasblick Ext 1 Township Development in Windhoek.pdf | 374.47 KB |
This is the renewal of the Environment Clearance Certifiate for the EIA and EMP for the Development of Cemetery on Portion Y situated in Rockey Crest, Windhoek District, Khomas Region.
Attachment | Size |
---|---|
1013_EMP_Cemetery on Portion Y situated in Rockey Crest.pdf | 1023.06 KB |
1013_ECC Renewal_Cemetery on Portion Y situated in Rockey Crest.pdf | 643.8 KB |
1013_ECC_Cemetery on Portion Y situated in Rockey Crest.pdf | 831.94 KB |