These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal https://eia.meft.gov.na/.
The dates indicate the last date that it was/will be possible to comment on the project on the portal.
You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.
Explore your search results using the filter checkboxes, or amend your search or start a new search.
Sand mining project close to Aus townlands.
| Attachment | Size |
|---|---|
| 2533_SR_Sand Mining Project at Aus.pdf | 1.96 MB |
| 2533_EMP_Sand Mining Project at Aus.pdf | 450.3 KB |
| 2533_Letter to EC_Sand Mining Project at Aus.pdf | 140.26 KB |
| 2533_Proof of Consultation_Sand Mining Project at Aus.pdf | 1.34 MB |
| 2533_Map_Sand Mining Project at Aus.pdf | 261.75 KB |
| 2533_CV_Sand Mining Project at Aus.pdf | 152.95 KB |
This document aims to provide you, as an Interested and/or Affected Party (I&AP), with background information regarding the application for Environmental Clearance Certificate for the proposed 100 MW solar power plant in //Karas Region. (Refer to Section 9: Locality Map), and Section 6 on the required environmental studies to be undertaken.
Kunene Grapes and Citrus Et Al (Proprietary) Limited seeks to become active at planting and harvesting agricultural fruits such as grapes, citrus and avocado plantation in the northern western part of Namibia. Kunene Grapes and Citrus Et Al (Proprietary) Limited has applied for about 670 hectares of land in Otjomaungu village in the Epupa Constituency. The allocated land is granted for grape projects. Kunene Grapes and Citrus Et Al (Proprietary) Limited is a wholly owned Namibian company planting and harvesting grapes, citrus and avocados in the North Western part of Namibia.
The amendment of conditions of establishment, the construction of a public road and the closing of public open space through statutory town planning procedures at Eheke settlement.
Rezoning of land from "General Industrial" to "Undetermined" and simultaneously for the construction of public roads, infrastructure and activities in water courses within flood lines through township establishments at Karibib to be known as Usab Extensions.
Construction of public roads and infrastructure, and construction activities within watercourses, through township establishments.
The ECC is for the establishment and operation of a self-catering tent lodge in the Sikunga Conservancy.
Construction of Infrastructure through Township Establishment at Okahao.
Environmental Clearance for, construction of public roads, infrastructure, and construction of other activities in watercourses within flood liens through Township Establishment. The Environmental Management Act (Act 7 of 2007), Section 8. Water Resource Developments; 8.8. Construction and other activities in watercourses within flood lines; 8.9. Construction and other activities within a catchment area; Section 10. Infrastructure: 10.1. The construction of- 10.1. (b) public roads; 10.2. Route determination of roads and design of associate physical infrastructure where- 10.2.
For infrastructure development through township establishment and layout planning within potential flood areas.